Danish Naval Developments Q4 1931
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts + 0.2 Bonus pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Slip No.5 (Type 0) at Aalborg building, receives 0.2 IP = Total 0.5 IP points, now complete
Slip No.6 (Type 0) at Aalborg building, receives 0.2 IP = Total 0.5 IP points, now complete
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Reginleif, CL, laid down 02/01/31, receives 1,165 tons, balance 1,053 tons
No.2 type 2 slip – Geirahöd, CL, laid down 02/04/31, receives 1,165 tons, balance 2,218 tons
No.3 type 1 slip – a (Lancer), DDL, laid down 02/01/31, receives 226 tons to complete
No.4 type 1 slip – b (Lancer), DDL, laid down 02/01/31, receives 226 tons to complete
No.1 type 3 drydock – Idle
Dock side – Idle
Aarhus-
No.1 type 3 slip – Hrist, CL, laid down 02/07/31, receives 1165 tons, balance 3,383 tons
No.2 type 2 slip – Herfjötur, CL, laid down 02/07/31, receives 1165 tons, balance 4,548 tons
No.3 type 1 slip – c ( Lancer), DDL, laid down 02/10/31, receives 400 tons, balance 1,146
No.4 type 1 slip – d ( Lancer), DDL, laid down 02/10/31, receives 400 tons, balance 1,146
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
Dock side - Sigrún, CL, laid down 01/10/30, receives 1072 tons to complete
Dock side - Mist, CL, laid down 01/10/30, receives 1072 tons to complete
Aalborg-
No.1 type 1 slip – Phlox, SL, laid down 02/07/31, receives 349 tons, balance 486 tons
No.2 type 1 slip – Cornflower, SL, laid down 02/07/31, receives 349 tons, balance 486 tons
No.3 type 1 slip – Guldsmed, MWS, laid down 01/09/1931, receives 245 tons, balance 310 tons
No.4 type 1 slip - Regnorm, MWS, laid down 01/09/1931, receives 245 tons, balance 310 tons
No.5 type 0 slip - Completed
No.6 type 0 slip - Completed
Dock side - Fuschia, SL, laid down 02/01/31, receives 137 tons to complete
Dock side - Nigella, SL, laid down 02/01/31, receives 137 tons to complete
Bangkok-
No.1 type 1 slip – Anenome, SL, laid down 02/04/31, receives 349 tons, balance 137 tons
No.2 type 0 slip – Ormstrup So, GB, laid down 02/07/31, receives 133 tons to complete
No.3 type 0 slip – Alling So, GB, laid down 02/07/31, receives 133 tons to complete
No.1 type 2 drydock –Idle
Dock side – Idle
d/ Transactions
None
e/ Other Notes
KDM Sváva commissions on 15/12/1931
KDM Lavender commissions on 30/10/1931
KDM Orchid commissions on 30/10/1931
KDM Jasmine commissions on 29/10/1931
KDM Dahlia commissions on 29/10/1931
KDM Hald So commissions on 10/11/1931
KDM Tange So commissions on 10/11/1931
KDM Vintmolle So commissions on 10/11/1931
KDM Vedso commissions on 10/11/1931
KDM Kalorm continues sea trials until 01/02/1931
KDM Tusindben continues sea trials until 01/02/1931
KDM a (Lancer) commences sea trials on 30/10/1931
KDM b (Lancer) commences sea trials on 30/10/1931
KDM Sigrún commences sea trials on 17/12/1931
KDM Mist commences sea trials on 17/12/1931
KDM Fuschia commences sea trials on 03/11/1931
KDM Nigella commences sea trials on 03/11/1931
KDM Ormstrup So commences sea trials on 11/11/1931
KDM Alling So commences sea trials on 11/11/1931
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 70 tons
f/ Order of Battle
Note:
![X(](wcf/images/smilies/angry.png)
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 0/0 (1) (Tegetthoff)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 0/0 (0)
CL = 18 (0) + 6/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 26 (0) + 4/0 (0)
SL = 10 (0) + 6/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 29 (0) + 2/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 11 (0) + 4/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)