You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, August 26th 2006, 5:52am

Philippines Q1/32

EXECUTIVE SUMMARY: Piquero class destroyers continue building, Delfin class submarines continue building, minelayer tender Calabarzon continues building, payments continue for Italian Ariete class TBs

------------

Armada de Filipinas
1932 First Quarter Report
1 January-30 March



A. Factories

7/11 factories = 7,000t of material + 174t stockpiled + 4,710t transferred = 11,884t available.
10,858t are used, leaving a stockpile of 1026t.

2/11 factories (committed) = 0.2 infrastructure pts +
2/11 factories (flexible) = 0.2 pts = 0.4 pts available


B. Infrastructure Development

Construction of Type 1 Drydock at Puerto Princesa continues
0.5 points invested, 1.5 points needed


C. Naval Development and Construction

at Manila:
S4: BRZ BC Recife receives 2,378t, balance 15,278t
S3: idle
S1: idle
D2: D Cormorán conversion received 350t, completed
D1: idle

at San Fernando:
S2: OM Calabarzon receives 1600t, balance 0t, completes 15 Sept 32
D1: idle
D0: idle

at Butuan:
S2: S Delfin receives 1238t, balance 0t, completes 12 Sept 32
S1: S Sello receives 1238t, balance 0t, completes 13 Sept 32
S0: idle
S0: idle
S0: idle
S0: idle
D4: idle
Dockside: BRZ BC Rio de Janeiro receives 2,187, balance 0t, completes 20 Sept 32

at Puerto Princesa:
S1: D Busardo laid down 2 January; receives 817t, balance 816t, completes 17 Sept 32

Commercial shipyards:
idle


D. Transactions

0.2 IP transferred to COSINE

4,565t received from Brazil

12 “Ariete” class TBs building in Italy; 1050t transferred, 3150 remaining

145t received from Persia for subchaser design

E. Other Notes

Ships laid down this quarter: D Busardo

Ds Piquero, Aguilucho, Serreta, Garceta, and Flamenco complete shakedown cruises

DM Cormoran begins shakedown cruise



F. Scrappage Report

none


G. Updated Order of Battle, 30 March 1932

Note: X(Y)+Z = completed (under repair/refit) + under construction

Second class battleships 1(0)+0
Coast defense battleships 2(0)+0
Battlecruisers 2(0)+0
Aircraft carriers (light) 1(0)+0
Second class cruisers 5(0)+0
Escort cruisers 2(0)+0
Minelaying cruisers 1(0)+0
Destroyers 15(0)+1
Destroyer escorts 7(0)+0
Destroyer minelayers 3(0)+0
Subchasers 10(0)+0
Submarines 5(0)+2
Fast torpedo craft 21(0)+12 (building in Italy)
Gunboats 11(0)+0
Patrol boats 2(0)+0
Fisheries patrol boats 9(0)+0
Coastal motor boats 120(0)+0
Minelayers 3(0)+0
Minesweepers (coastal) 15(0)+0
Assault transports 3(0)+0
Seaplane Tenders 1(0)+0
Polar exploration ships 1(0)+0
Destroyer Tenders 2(0)+0
Torpedo-boat Tenders 2(0)+0
Minelayer Tenders 0(0)+1
Oilers 1(0)+0
Repair ships 1(0)+0
Water tankers 1(0)+0
Harbour Tugs 8(0)+0
Training ships 1(0)+0
Target ships 1(0)+0
Hospital ships 1(0)+0

------------

2

Sunday, August 27th 2006, 5:21am

Can't wait to get the slips in Manila open again... I have a lot of stuff that needs building!

Anyone see any errors with this? I've checked it over, but I slapped it together while sleep-deprived, so I'm sure I've missed something...

3

Sunday, August 27th 2006, 5:31am

Everything looks good on my end. I believe the Recife clears the docks after next quarter, so you can begin building capships again.

4

Sunday, August 27th 2006, 5:38am

Quoted

Originally posted by Fyrwulf
Everything looks good on my end. I believe the Recife clears the docks after next quarter, so you can begin building capships again.


Roger that.

5

Sunday, August 27th 2006, 6:12am

Also, don't forget that the ship only has to be on a slip for the first 40% of construction scheduled-time/material (whichever takes longer) - after that it's fitting out dockside and the slip, post "cleanout", can be reused.

6

Sunday, August 27th 2006, 6:16am

Quoted

Originally posted by Swamphen
Also, don't forget that the ship only has to be on a slip for the first 40% of construction scheduled-time/material (whichever takes longer) - after that it's fitting out dockside and the slip, post "cleanout", can be reused.


Is there a limit to the number of ships I can have dockside?

7

Sunday, August 27th 2006, 6:22am

No. It's assumed that a port city will have ample space for any number of navy ships that might be constructed there.