Yugoslavia 1Q48 Sim Report
A. Factories
Factories : 2
Producing Warship Material : 1
Tonnage Produced : 1,000
Producing Infrastructure (Committed) : 1
Producing Infrastructure (Non - Committed) : 0
Infrastructure Points Produced : 0.10
Bonus IP for Committed Factories : 0.00
Total IP Available : 0.10
Tonnage Produced : 1,000
Tonnage Transferred In : 0
Tonnage Received in Payment : 0
Tonnage Reclaimed From Scrap : 0
Tonnage Previously Stockpiled : 1,590
Total Tonnage Available : 2,590
Tonnage Paid : 0
Tonnage Used in Construction : 1,061
Tonnage Remaining for Stockpile : 1,529
B. Infrastructure Development
At Bar: Construction of a Type 0.0 Floating Dry Dock for eventual deployment to Kotor: 1.5 IP required, 0.1 IP provided this quarter, total 0.1 IP committed; 0.4 IP remaining
At Belgrade: None
C. Naval Development and Construction
At Bar:
Dock No.1 (Type 2.0): Idle
Dock No.2 (Type 0.0): Idle
Slip No.1 (Type 1.5): Project 1948 Gamma – Landing Ship A and Landing Ship B laid down end-for-end 1 January 1948; each requires 315 tons, each has 0 tons previously committed; each receives 158 tons, each has 157 tons remaining; Launched 6 March 1948
Slip No.2 (Type 0): Project 1948 Alpha – Ammunition Auxiliary A – Laid down 1 January 1948; requires 685 tons, 0 tons previously committed; receives 180 tons, 505 tons remaining.
Slip No.3 (Type 0): Project 1948 Alpha – Ammunition Auxiliary A – Laid down 1 January 1948; requires 685 tons, 0 tons previously committed; receives 180 tons, 505 tons remaining.
Dockside:
Project 1947 Beta - Minelayer B – Launched 21 December 1947: Requires 1,535 tons, 770 tons previously committed; receives 385 tons, 380 tons remaining
At Belgrade:
Dock No.1 (Type 0): Idle
Slip No.1 (Type 0): Idle
At Durres:
Floating Dock No.1 (Type 1.0: - Idle (settling in)
Small Craft Construction
None
D. Transactions
None
E. Refits
None
Ships Laid Down This Quarter
At Bar:
Project 1948 Alpha – Ammunition Auxiliary A
Project 1948 Alpha – Ammunition Auxiliary B
Project 1948 Gamma - Landing Ship A
Project 1948 Gamma - Landing Ship B
At Belgrade:
None
Ships Launched This Quarter
At Bar:
Project 1948 Gamma - Landing Ship A
Project 1948 Gamma - Landing Ship B
At Belgrade:
None
Ships Completed This Quarter
At Bar:
None
At Belgrade:
None
Ships Undergoing Trials
Project 1947 Beta - Minelayer A – Vojvodina (completes 13 May 1948)
Ships Completing Trials
None
F. Scrappage Report
None
Order of Battle of the Royal Yugoslav Navy, March 1948
Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 4 + 0 + 0 + 0 = 4
Destroyer Leaders : 3 + 0 + 0 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Escort Sloops : 8 + 0 + 0 + 0 = 8
Corvettes 8 + 0 + 0 + 0 = 8
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Gunboat-Minelayers : 0 + 1 + 1 + 0 = 2
Minecraft : 12 + 0 + 0 + 0 = 12
Motor Torpedo Boats : 36 + 0 + 0 + 0 = 36
Fleet Tender 2 + 0 + 0 + 0 = 2
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Ammunition Auxiliaries : 0 + 0 + 2 + 0 = 2
Landing Ships : 0 + 0 + 2 + 0 = 2
Netlayers : 4 + 0 + 0 + 0 = 4
Riverine Monitors : 8 + 0 + 0 + 0 = 8