A. Factories
1/4 factories = 1000t produced - 1000t transferred + 2536t stockpiled = 1936t
1600t used, 1936t stockpiled
2/4 factories (committed) = 0.2IP
1/4 factories (flexible) = 0.1IP
B. Infrastructure Development
Factory P5 (0.3IP used, 1.0 IP to complete)
C. Naval Development and Construction
at Danzig:
1 Type 2 slip Idle
1 Type 1 slips Kuter 1 100t used(220 to complete)
1 Type 1 slips Kuter 2 100t used(220 to complete)
1 Type 0 slips Kuter 3 100t used(220 to complete)
1 Type 0 slips Kuter 4 100t used(220 to complete)
1 Type 1 drydock Idle
at Koszalin
1 Type 1 slips Idle
1 Type 0 slips Kuter 5 100t used(220 to complete)
1 Type 0 slips Kuter 6 100t used(220 to complete)
1 Type 3 drydock Idle
Type 0 drydocks Idle
D. Transactions
1000t transferred to Yugoslavia
E. Other Notes
Philippines BC Mindano. begins shakedown cruise
ORP Stefan Batory, (DD Pilsudski 3) finishes shakedown cruise
ORP Stanislaw Poniatowski, (DD Pilsudski 4)continue shakedown cruise
SS A5, A6, A7, A8, A9 finished shakedown cruise
A10 ,A11, DD 5 begins shakedown cruise
Ships laid down this quarter:Kuter 1,2,3,4,5,6
F. Scrappage Report
none
Note: (Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
CDBB: 1(0)+0
CA: 2(0)+0
CL: 1(0)+0
DD: 10(0)+0
FTB: 8(0)+0
AG: 3(0)+0
SS: 19(0)+0
MS: 6(0)+0
GB: 2(0)+0
M: 18(0)+0
MTB: 70(0)+0