You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, April 26th 2004, 3:21pm

Germany, Q1/23

German Naval Developments - Q1/23

A. Industrial Allocation


4/11 factories used to manufacture naval materials, plus at stockpile of 452 t = 4,452 t available. Of this, 2,932 t are used, leaving a stockpile of 1,520 tons.

7/11 factories are committed to manufacturing naval infrastructure material, producing 0.7 pts. Bonus points will be produced and allocated in the final quarter.

B. Infrastructure Development


Factory 12 receives 0.4 pts, for a total of 3.8 pts.

The Type 2 slipway at Kiel and receives 0.3 pts, for a total of 0.4 pts.

C. Naval Construction

At Wilhelmshaven


1 Type 2 drydock:
1 Type 1 slip: Patrol Boat VB-5 laid down 1/1/23, receives 319 t
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle
Free-floating: Patrol Boat VB-3 receives 319 t; to complete 30/4/23

At Bremerhaven

1 Type 2 slip:
1 Type 1 slip:
1 Type 1 drydock: idle
1 Type 0 slip: idle
Free-floating: Patrol Boat VB-4 receives 319 t; to complete 30/4/23

At Cuxhaven

1 Type 3 slip: idle
1 Type 3 drydock:
1 Type 2 slip: CL Karlsruhe laid down 1/1/23, receives 1383 t
1 Type 1 slip:
1 Type 0 slip: idle
Free-floating: Minesweeper R-1 receives 221 t

At Kiel

1 Type 2 drydock: Idle
1 Type 1 slips: Idle
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle
Free-floating: Minesweeper R-2 receives 221 t

Commericial shipyard at Kiel builds one 150 t coastal submarine chaser.

D. Transactions

None

E. Other Notes

CL Munchen completes her shakedown cruise.

Patrol boats VB-1 and VB-2 continue their shakedown cruises.

New Orders: 1 light cruiser, 1 patrol boat

F. Updated Order of Battle, 31/3/23

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(0)+0
CL: 10()+1
DD: 24
SL: 2(0)+3
AM: 0(0)+2

Note: PD = pre-dreadnought

(Edit 18/5/04: Warship material usage statistics were totally whacked. Much higher carry-over than originally reported)