You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, December 27th 2012, 10:45pm

German Naval Construction Programme, Second Quarter 1943

German Naval Construction Programme, Second Quarter 1943

A. Factories

Factories: 31
Available: 31
Producing Warship Material: 31
Tonnage Produced: 31,000
Producing Infrastructure (Committed):
Producing Infrastructure (Non - Committed):
Infrastructure Points Produced: 0.0
Bonus IP for Committed Factories: 0.0
Total IP Available: 0.0

Tonnage Produced: 31,000
Tonnage Transferred In:
Tonnage Received in Payment: 4,302
Tonnage Reclaimed From Scrap: 0
Tonnage Previously Stockpiled: 3,295
Total Tonnage Available: 38,597
Tonnage Transferred Out:
Tonnage Paid:
Tonnage Used in Construction: 36,493
Tonnage Remaining for Stockpile: 2,104


B. Infrastructure Development

None this quarter


C. Naval Development and Construction

Bremerhaven

Dock Nr.1 - Type 3.0 – Corvettes Leopard and Luchs laid down end-to-end 1 January 1943; Each requires 1,000 tons; 270 tons previously consumed; each receives 270 tons, 460 tons remaining for each vessel; Launched 3 May 1943

Slip Nr.1 - Type 3.0 – Aircraft carrier Großer Kurfürst laid down 1 January 1943; Requires 18,764 tons; 2,010 tons previously consumed; receives 2,010 tons; 14,744 tons remaining

Slip Nr.2 - Type 1.0 – Corvette Jaguar: Laid down 1 April 1943: Requires 1,000 tons, 0 tons previously consumer; receives 270 tons, 730 tons remaining

Slip Nr.3 - Type 1.0 – Corvette Tiger: Laid down 1 April 1943: Requires 1,000 tons, 0 tons previously consumer; receives 270 tons, 730 tons remaining


Pierside:

Hizar Reis (Turkish Cruiser A): Launched 22 September 1942: Requires 13,003 tons, 9.000 tons previously consumed; receives 1,800 tons, 2,203 tons remaining

Destroyer Auerbach: Launched 31 January 1943: Requires 1,919 tons, 960 tons previously consumed; receives 480 tons, 479 tons remaining

Destroyer Ensdorf: Launched 31 January 1943: Requires 1,919 tons, 960 tons previously consumed; receives 480 tons, 479 tons remaining


Cuxhaven

Dock Nr.1 - Type 4.0 – Corvettes Fuchs and Wolf laid down end-to-end 1 January 1943; Each requires 1,000 tons; 270 tons previously consumed; each receives 270 tons, 460 tons remaining for each vessel; Launched 3 May 1943

Dock Nr.2 - Type 2.0 – Idle

Slip Nr.1 – Type 4.0 – Aircraft carrier Friedrich der Große laid down 1 January 1943; Requires 18,764 tons; 2,010 tons previously consumed; receives 2,010 tons; 14,744 tons remaining

Slip Nr.2 – Type 2.0 – Idle

Slip Nr.3 – Type 1.0 – Corvette Iltis: Laid down 1 April 1943: Requires 1,000 tons, 0 tons previously consumer; receives 270 tons, 730 tons remaining

Slip Nr.4 – Type 1.0 – Corvette Lowe: Laid down 1 April 1943: Requires 1,000 tons, 0 tons previously consumer; receives 270 tons, 730 tons remaining

Pierside:

Aircraft carrier Scharnhorst: Launched 9 Mar 1942: Requires 26,835 tons, 20,250 tons previously consumed; receives 2,250 tons; 4,335 tons remaining

Van (Turkish Cruiser B): Launched 28 September 1942: Requires 7,576 tons, 6,325 tons previously consumed; receives 1,251 tons; 0 tons remaining; Completed 14 May 1943

Sivas (Turkish Cruiser C): Launched 28 September 1942: Requires 7,576 tons, 6,325 tons previously consumed; receives 1,251 tons; 0 tons remaining; Completed 14 May 1943

Destroyer Hameln: Launched 31 January 1943: Requires 1,919 tons, 960 tons previously consumed; receives 480 tons, 479 tons remaining

Destroyer Herter: Launched 31 January 1943: Requires 1,919 tons, 960 tons previously consumed; receives 480 tons, 479 tons remaining


Hamburg

Slip Nr.1 – Type 2.0 – Amphibious Transport Wittelsbach – Laid down 1 January 1943; Requires 6,671 tons, 1,300 tons previously committed; receives 1,300 tons, 4,071 tons remaining

Slip Nr.2 – Type 2.0 – Amphibious Landing Ship Wettin – Laid down 1 January 1943; Requires 6,671 tons, 1,300 tons previously committed; receives 1,300 tons, 4,071 tons remaining

Slip Nr.3 – Type 1.0 – Minesweeper Jungfernsee: Laid down 1 February 1943; Requires 447 tons, 250 tons previously consumed; receives 197 tons, 0 tons remaining; Launched 2 April 1943, Completed 16 June 1943 and commences trials

Slip Nr.4 – Type 1.0 – Minesweeper Seddensee: Laid down 1 February 1943; Requires 447 tons, 250 tons previously consumed; receives 197 tons, 0 tons remaining; Launched 2 April 1943, Completed 16 June 1943 and commences trials


Pierside

Amphibious Landing Ship Delphin – Launched 9 November 1942; Requires 800 tons, 600 tons previously consumed; receives 200 tons, 0 tons remaining; Completed 21 April 1943 and commences trials

Amphibious Landing Ship Tümmler – Launched 9 November 1942; Requires 800 tons, 600 tons previously consumed; receives 200 tons, 0 tons remaining; Completed 21 April 1943 and commences trials


Kiel

Dock Nr.1 – Type 4.0 – Idle

Dock Nr.2 – Type 2.5 – Amphibious Landing Ships Barbe and Brasse; Laid down end-to-end 1 January 1943; Each requires 800 tons; 200 tons previously consumed; each receives 200 tons; each has 400 tons remaining; Launched 21 May 1943

Dock Nr.3 – Type 2.0 – Idle

Dock Nr.4 – Type 0.0 – Scrapping of Minecraft R-13; demolition commences 1 January 1943, completed 26 June 1943; 80 tons recovered and available 1Q44

Slip Nr.1 – Type 4.0 – Idle

Slip Nr.2 - Type 3.0 – Idle

Slip Nr.3 – Type 1.0 – Destroyer Kulmbach: Laid down 1 January 1943: Requires 1,919 tons; 480 tons previously consumed; receives 480 tons, 960 tons remaining; Launched 3 May 1943

Slip Nr.4 – Type 1.0 – Destroyer Pegnitz: Laid down 1 January 1943: Requires 1,919 tons; 480 tons previously consumed; receives 480 tons, 960 tons remaining; Launched 3 May 1943

Slip Nr.5 – Type 1.0 – Idle

Pierside

Aircraft Carrier Gneisenau; Launched 9 Mar 1942: Requires 26,835 tons, 20,250 tons previously consumed; receives 2,250 tons; 4,335 tons remaining

Amphibious Landing Ship Eidechse – Launched 9 November 1942; Requires 800 tons, 600 tons previously consumed; receives 200 tons, 0 tons remaining; Completed 21 April 1943 and commences trials

Amphibious Landing Ship Krokodil – Launched 9 November 1942; Requires 800 tons, 600 tons previously consumed; receives 200 tons, 0 tons remaining; Completed 21 April 1943 and commences trials

Aircraft carrier Wallenstein: Launched 15 November 1942: Requires 10,030 tons, 6,600 tons previously consumed; receives 2,000 tons; 1,230 tons remaining

Destroyer Bamberg: Launched 31 October 1942: Requires 1,919 tons; 1,440 tons previously consumed; receives 479 tons, 0 tons remaining; Completed 24 May 1943 and commences trials

Destroyer Passau: Launched 31 October 1942: Requires 1,919 tons; 1,440 tons previously consumed; receives 479 tons, 0 tons remaining; Completed 24 May 1943 and commences trials

Fleet Submarines U-125: Launched 7 January 1943; Requires 1,385 tons; 1,050 tons previously consumed; receives 335 tons; 0 tons remaining; Completed 9 May 1943

Fleet Submarines U-126; Launched 7 January 1943; Requires 1,385 tons; 1,050 tons previously consumed; receives 335 tons; 0 tons remaining; Completed 9 May 1943


Wilhelmshaven

Dock Nr.1 - Type 3.0 – ; Laid down end-to-end 1 January 1943; Each requires 800 tons; 200 tons previously consumed; each receives 200 tons; each has 400 tons remaining; Launched 21 May 1943


Dock Nr.2 – Type 0.0 – Scrapping of Minecraft R-14; demolition commences 1 January 1943, completed 26 June 1943; 80 tons recovered and available 1Q44

Slip Nr.1 – Type 1.0 – Idle

Slip Nr.2 – Type 0.5 – Fleet Salvage Tug Hummel: Laid down 1 January 1943; Requires 1,030 tons, 260 ton previously committed; receives 260 tons, 510 tons remaining; Launched 1 May 1943

Slip Nr.3 – Type 0.5 – Fleet Salvage Tug Hummel: Laid down 1 January 1943; Requires 1,030 tons, 260 ton previously committed; receives 260 tons, 510 tons remaining; Launched 1 May 1943

Pierside:

Aircraft carrier Pappenheim: Launched 15 November 1942: Requires 10,030 tons, 6,600 tons previously consumed; receives 2,000 tons; 1,230 tons remaining


Vienna:

Dock Nr.1 – Type 0.0 – Idle

Slip Nr.1 – Type 0.0 – Idle


Memel:

Dock Nr.1 – Type 1.0 – Destroyer Siegberg: Laid down 1 January 1943: Requires 1,919 tons; 480 tons previously consumed; receives 480 tons, 960 tons remaining; Launched 3 May 1943

Slip Nr.1 – Type 1.0 – Destroyer Uberherrn: Laid down 1 January 1943: Requires 1,919 tons; 480 tons previously consumed; receives 480 tons, 960 tons remaining; Launched 3 May 1943

Slip Nr.2 – Type 0.0 – Harbor Tug Langenwerder: Laid down 1 April 1943; Requires 325 tons; 0 tons previously consumed; receives 200 tons, 125 tons remaining; Launched 23 May 1943

Slip Nr.3 – Type 0.0 – Harbor Tug Vlim: Laid down 1 April 1943; Requires 325 tons; 0 tons previously consumed; receives 200 tons, 125 tons remaining; Launched 23 May 1943

Pierside:

Harbor Tug Bullenriff: Launched 22 February 1943; Requires 325 tons; 200 tons previously consumed; receives 125 tons, 0 tons remaining; Completed 10 May 1943 and commences trials

Harbor Tug Gänsewerder: Launched 22 February 1943; Requires 325 tons; 200 tons previously consumed; receives 125 tons, 0 tons remaining; Completed 10 May 1943 and commences trials


Small Craft Construction Programme

Craft: Quantity -- Light Tonnage -- Tonnage Expended
Pionier Motor Launch Typ 1941: Two -- 82 -- 164
Sturm Landungsboot 40: Twelve -- 20 -- 240
Pionier Landungsboot 40: Two -- 62 -- 124


Refits and Conversion Programme

Conversion of Fleet Escort F9 to Antisubmarine Corvette Blitz: Commences 1 April 1943: Requires 55 tons, 55 tons provided; 0 tons remaining. Conversion complete 17 April 1943 and commences post-conversion trials; trials complete 26 April 1943

Conversion of Fleet Escort F10 to Antisubmarine Corvette Pfeil: Commences 1 April 1943: Requires 55 tons, 55 tons provided; 0 tons remaining. Conversion complete 17 April 1943 and commences post-conversion trials; trials complete 26 April 1943

Conversion of Minecraft R21 to Light Minelayer Spica: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Minecraft R22 to Light Minelayer Altair: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Minecraft R23 to Light Minelayer Regulus: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Minecraft R24 to Light Minelayer Orion: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Minecraft R25 to Light Minelayer Capella: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Minecraft R26 to Light Minelayer Sirius: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Minecraft R27 to Light Minelayer Rigel: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Minecraft R28 to Light Minelayer Deneb: commences 1 April 1943: Requires 82 tons, 82 tons provided; 0 tons remaining. Conversion complete 14 May 1943 and commences post-conversion trials; trials complete 10 June 1943

Conversion of Infantry Landing Ship Daun: Commences 1 January 1943: Requires 2,182 tons, 1,091 tons previously consumed, 1,091 tons provided; 0 tons remaining; Conversion complete 6 May 1943 and commences post conversion trials; trials complete 20 June 1943

Conversion of Infantry Landing Ship Laudon: Commences 1 April 1943: Requires 2,182 tons, 0 tons previously consumed, 1,091 tons provided; 1,091 tons remaining.

Conversion of Oiler Markgräflerland: Commences 1 January 1943: Requires 1,548 tons; 774 tons previously consumed; 774 tons provided; 0 tons remaining; Conversion complete 25 April 1943 and commences post-conversion trials; trials complete 9 June 1943

Conversion of Oiler Mindenerland: Commences 1 January 1943: Requires 1,548 tons; 774 tons previously consumed; 774 tons provided; 0 tons remaining; Conversion complete 25 April 1943 and commences post-conversion trials; trials complete 9 June 1943

Conversion of Fleet tender Gustav Nachtigal: Commences 1 January 1943: Requires 1,715 tons; 860 tons previously consumed; 855 tons provided; 0 tons remaining; Conversion complete 1 May 1943 and commences post conversion trials; trials complete 15 June 1943


D. Transactions

Tonnage Received from Turkey for construction of one large light cruiser: 1,800
Tonnage Received from Turkey for construction of two small light cruisers: 2,502



E. Other Notes

Ships Laid Down This Quarter

At Bremerhaven: Corvette Jaguar, Corvette Tiger
At Cuxhaven: Corvette Iltis, Corvette Lowe
At Memel: Harbour Tug Langenwerder, Harbour Tug Vlim


Ships Launched This Quarter

Destroyer Kulmbach
Destroyer Pegnitz
Destroyer Siegberg
Destroyer Uberherrn
Corvette Leopard
Corvette Luchs
Corvette Fuchs
Corvette Wolf
Minesweeper Jungfernsee
Minesweeper Seddensee
Amphibious Landing Ship Barbe
Amphibious Landing Ship Brasse
Amphibious Landing Ship Karpfen
Amphibious Landing Ship Muräne
Fleet Salvage Tug Hummel
Fleet Salvage Tug Natter


Ships Completed This Quarter

Light Cruiser Van – Turkish Account
Light Cruiser Sivas – Turkish Account

Destroyer Bamberg
Destroyer Passau
Fleet Submarine U-125
Fleet Submarine U-126
Minesweeper Jungfernsee
Minesweeper Seddensee
Amphibious Landing Ship Delphin
Amphibious Landing Ship Tümmler
Amphibious Landing Ship Eidechse
Amphibious Landing Ship Krokodil
Harbor Tug Bullenriff
Harbor Tug Gänsewerder

Refits/Conversions

Antisubmarine Corvette Blitz (ex F9) – completed 17 April 1943
Antisubmarine Corvette Pfeil (ex F10) – completed 17 April 1943
Light Minelayer Spica (ex-R21) – completed 14 May 1943
Light Minelayer Altair (ex R22) – completed 14 May 1943
Light Minelayer Regulus (ex R23) – completed 14 May 1943
Light Minelayer Orion (ex R24) – completed 14 May 1943
Light Minelayer Capella (ex R25) – completed 14 May 1943
Light Minelayer Sirius (ex R26) – completed 14 May 1943
Light Minelayer Rigel (ex R27) – completed 14 May 1943
Light Minelayer Deneb (ex R28) – completed 14 May 1943
Infantry Landing Ship Daun – completed 6 May 1943
Infantry Landing Ship Laudon
Fleet Oiler Markgräflerland – completed 25 April 1943
Fleet Oiler Mindenerland – completed 25 April 1943
Fleet tender Gustav Nachtigal – completed 1 May 1943


Ships Undergoing Trials This Quarter

(first three-months)

Light Cruiser Van – Turkish Account
Light Cruiser Sivas – Turkish Account

Destroyer Bamberg
Destroyer Passau
Fleet Submarine U-125
Fleet Submarine U-126
Minesweeper Jungfernsee
Minesweeper Seddensee
Amphibious Landing Ship Delphin
Amphibious Landing Ship Tümmler
Amphibious Landing Ship Eidechse
Amphibious Landing Ship Krokodil
Harbor Tug Bullenriff
Harbor Tug Gänsewerder

(second three months)

Destroyer Bochum
Destroyer Laboe
Destroyer Siegen
Destroyer Worms

Coastal Submarine U-203
Coastal Submarine U-204
Coastal Submarine U-205
Coastal Submarine U-206


Ships Completing Trials This Quarter

Battleship Ostmark
Battleship Preuzen
Battleship Sachsen
Battleship Bayern
Destroyer Detmold
Destroyer Vegesack
Fleet Submarine U-123
Fleet Submarine U-124
Minesweeper Barmsee
Minesweeper Leppinsee
Minesweeper Forggensee
Minesweeper Pomelsee
Support Tanker Lahn
Support Tanker Lech

Antisubmarine Corvette Blitz(ex F9) (post conversion) completed 26 April 1943
Antisubmarine Corvette Pfeil (ex F10) (post conversion) completed 26 Spril 1943

Light Minelayer Spica (ex-R21) (post conversion) completed 10 June 1943
Light Minelayer Altair (ex R22) (post conversion) completed 10 June 1943
Light Minelayer Regulus (ex R23) (post conversion) completed 10 June 1943
Light Minelayer Orion (ex R24) (post conversion) completed 10 June 1943
Light Minelayer Capella (ex R25) (post conversion) completed 10 June 1943
Light Minelayer Sirius (ex R26) (post conversion) completed 10 June 1943
Light Minelayer Rigel (ex R27) (post conversion) completed 10 June 1943
Light Minelayer Deneb (ex R28) (post conversion) completed 10 June 1943

Infantry Landing Ship Daun (post conversion) completed 20 June 1943


Ships Retired to the Reserve or Disposed Of

The ten (10) minesweepers of the R11 class will pay off to the reserve pending disposal


F. Scrappage Report

Minesweepers R13 and R14 sent to the breakers commencing 1 January 1943


Updated Order of Battle

Type : In Service -- Trials -- Building -- Refitting -- Total
Schlachtschiff : 8 + 0 + 0 + 0 = 8
Schlachtkreuzer : 4 + 0 + 0 + 0 = 4
Flugzeugträger : 2 + 0 + 6 + 0 = 8
Schwere Kreuzer : 4 + 0 + 0 + 0 = 4
Leichte Kreuzer : 16 + 0 + 0 + 0 = 16
Schwere Zerstörer : 18 + 0 + 0 + 0 = 18
Zerstörer : 58 + 6 + 8 + 0 = 72
Korvette : 4 + 0 + 8 + 0 = 12
Geleitboote : 12 + 0 + 0 + 0 = 12
Underseeboote : 46 + 6 + 0 + 0 = 58
Leichte Minenschiffe : 12 + 0 + 0 + 0 = 12
Minenschiffe : 62 + 0 + 0 + 0 = 64
Mehrzweckboot : 4 + 0 + 0 + 0 = 4
Schnelleboote : 50 + 0 + 0 + 0 = 50
Flusskanonenboote : 2 + 0 + 0 + 0 = 2
Fluss-Patrouillenboote : 6 + 0 + 0 + 0 = 6
Schnellboot-Begleitschiffe : 2 + 0 + 0 + 0 = 2
U-boot-Begleitschiffe : 4 + 0 + 0 + 0 = 4
Begleit- und Werkstattschiff : 0 + 1 + 0 + 0 = 1
Einsatzgruppenversorgungsschiff : 2 + 0 + 0 + 0 = 2
Flottentanker : 10 + 2 + 0 + 0 = 12
Flottenversorgungsschiff : 4 + 0 + 0 + 0 = 4
Werkstattschiffe : 2 + 0 + 0 + 0 = 2
Flottenversorger (P) : 2 + 0 + 0 + 0 = 2
Munitionstransportschiff : 2 + 0 + 0 + 0 = 2
Versorgnungstransportschiff : 2 + 0 + 0 + 0 = 2
Minentransporter : 1 + 0 + 0 + 0 = 1
Begleit- und Werkstattschiff : 2 + 0 + 0 + 0 = 2
Reparaturschiff : 2 + 0 + 0 + 0 = 2
Vermessungsschiff : 2 + 0 + 0 + 0 = 2
Eisbrecher : 2 + 0 + 0 + 0 = 2
Netzleger : 8 + 0 + 0 + 0 = 8
Hochseeschlepper : 4 + 0 + 0 + 0 = 4
Bergungsschlepper : 0 + 0 + 2 + 0 = 2
Hafenschlepper : 0 + 2 + 2 + 0 = 4
Amphibische Transportschiffe : 4 + 1 + 3 + 0 = 8
Landungstransportschiff : 0 + 4 + 4 + 0 = 8
Sturm Landungsboot : 106 + 0 + 0 + 0 = 106
Pionier Landungsboot : 24 + 0 + 0 + 0 = 24
Marine Fahrprahm Typ 1941 : 8 + 0 + 0 + 0 = 8
Hafensucheboote Typ 1941 : 24 + 0 + 0 + 0 = 24
Pionier Motor Launch Typ 1941 : 16 + 0 + 0 + 0 = 16
Flieger-schuleschiffe : 1 + 0 + 0 + 0 = 1
Artillerie-schuleschiffe : 2 + 0 + 0 + 0 = 2
Segel-schuleschiffe : 2 + 0 + 0 + 0 = 2
Zielschiffe : 1 + 0 + 0 + 0 = 1
Hafen-schuleschiffe : 1 + 0 + 0 + 0 = 1