Industrial Allocation
- 8/9 factories producing 8,000t materials.
- 2,502 tons from stockpile.
- 192 tons from scrapping
- 11,195 tons materials total.
- 8,335 tons used.
- 2,359 tons stored for Q3/45.
- 1/9 factories dedicated to infrastructure.
Infrastructure Development
1 factory dedicated to infrastructure; produces 0.1 IP, which goes to upgrading the Talcahuano S2 into an S2.5.
Naval Construction
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: PA-04
Patria laid down July 1st, 1944. 2,200 tons added Q2/45 for a total of 8,800 / 20,000 tons. 11,200 / 20,000 tons remaining. Ship launched June 18th, 1945 and completed on December 1st, 1946.
S3.5: Dock landing ship
Disembarkment of Pisagua laid down April 2nd, 1945. 5250 tons required. 1100 tons added Q2/1945 for a total of 1100 / 5250. 4150 / 5250 tons remaining until completion. Ship launched September 21st, 1945 and completed on June 8th, 1946.
D2.5:
Reserve Hull 005 finishes scrapping. 179 / 179 tons recovered Q2/1945.
D2:
Reserve Hull 006 finishes scrapping. 179 / 179 tons recovered Q2/1945.
S2: Upgrading to S2.5. 0.2 of 0.5 IP added.
S1: Idle.
D0: Idle.
Dockside:
- CP-05
O'Higgins laid down April 1st, 1944. 2,400 tons added Q2/45 for a total of 12000 / 14525 tons. 2525 / 14525 tons remaining. Ship launched on January 15th, 1945. Ship completed on February 6th, 1946.
- DE-32
Salinas laid down October 1st, 1944. 325 tons added Q2/45 for a total of 975 / 1,195 tons. 220 / 1195 tons remaining. Ship launched on February 3rd 1945. Ship completed on August 6th, 1945.
-
Reserve Hull 007 and
Reserve Hull 008 scrapping at dockside beginning April 1st, 1945. 0 / 179 tons removed from each. Scrapping to be completed in drydock July 1st through August 7th, 1945.
-
Reserve Hull 009 and
Reserve Hull 010 scrapping at dockside beginning June 1st, 1945. 0 / 179 tons removed from each. Scrapping to be completed in drydock August 15th through September 25th, 1945.
ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Fleet submarine
Marlin (SO-04) laid down January 1st, 1945. 550 tons added Q2/45 for a total of 1100 / 1650 tons. 500 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.
S1: Fleet submarine
Esturión (SO-05) laid down January 1st, 1945. 550 tons added Q2/45 for a total of 1100 / 1650 tons. 500 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.
D1: Fleet submarine
Bonito (SO-06) laid down January 1st, 1945. 550 tons added Q2/45 for a total of 1100 / 1650 tons. 500 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.
Dockside:
- DE-31
Litton laid down July 1st, 1944. 220 tons added Q2/45 for a total of 1195 / 1195 tons. 220 / 1195 tons remaining. Ship launched on November 3rd 1944. Ship completed on May 6th, 1945.
ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Light minesweeper
YDM-14 laid down April 1st, 1945. 190 tons added Q2/1945 for a total of 190 / 190. Completed and launched on April 30th, 1945.
S0: Submarine chaser
Itata laid down April 1st, 1945. 250 tons added Q2/1945 for a total of 250 / 250. Ship launched May 20th, 1945. Ship will complete on August 8th, 1945.
Dockside:
- Submarine chaser
Rapel laid down January 1st, 1945. 0 tons added Q2/1945 for a total of 250 / 250. Ship launched February 20th, 1945. Ship will complete on May 8th, 1945.
ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle.
Dockside:
None
from factories:
- N/A
On Trials
- DE-29
Díaz completes six months of builders trials.
- DE-30
Troncoso continues six months of builders trials.
- DE-31
Litton begins six months of builders trials.
- DM-62
Almirante Williams completes six months of builders trials.
- DM-63
Almirante Riveros completes six months of builders trials.
- Minelayer
21 de Mayo completes six months of builders trials (in Argentina).
- Subchaser
Rapel begins three months of builder's trials.
Scrapping
- Total tonnage in recycling until Q2/1945: (12x16) = 192 tons
- Total tonnage in recycling until Q3/45: (2x152) + (2x179) = 662 tons
- Total tonnage in recycling until Q4/45: (2x179) = 352 tons
- Total tonnage in recycling until Q1/46: (2x179) = 352 tons
Transactions
None
Other Notes
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date not set. Project is in study stages at Sisdef.
Order of Battle (Armada de Chile) June 30th, 1945
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Primary Combatants:
Battlecruisers: 3(0)+0
Aircraft Carriers: 3(0)+1
Heavy Cruiser: 2(0)+1
Light Cruisers: 8(0)+0
Helicopter Cruisers: 1(0)+0
Large Destroyers: 8(0)+0 {3,000 tons std and up}
Medium Destroyers: 50(0)+0 {1,200-3,000 tons std}
Light Destroyers (Corvettes): 8(0)+0 {under 1,200 tons std}
Destroyer Escorts: 13(0)+1-4
Minelayer: 2(0)+0
Torpedo Boats: 25(0)+0
Submarines: 8(0)+3
Subchasers: 17(0)+1
Minesweepers: 26(0)+0
Arctic Patrol Vessel: 3(0)+0
Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0
Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0
Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Landing Ship Dock: 0(0)+1
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 2(0)+0
Landing Craft Tank: 0(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0
Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 12(0)+0
Museum Ships: 1(0)+0
Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)