You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, September 22nd 2014, 3:07am

Russia, Q4/1944



Report for Q4/1944
Industrial Allocation
- 33 / 33 factories producing 33,000t materials.
- 0/33 factories producing infrastructure
- 10,425t from stockpile.
- 0t from transactions.
- 5,494t from scrapping.
- 48,919t materials total.
- 39,184t used.
- 9,735t stored for Q1/45.

Infrastructure Development
None

Naval Construction

Petrograd: Almaz Shipbuilding Company, Sudomekh Shipyard No. 196, Severnaya Verf No.190, and Baltic Shipyard No.189
Class 4 Slip #1 - Idle.
Class 4 Slip #2 - Idle.
Class 4 Slip #3 - Idle.
Class 4 Slip #4 - Idle.
Class 3 Slip #1 - Idle.
Class 3 Slip #2 - Idle.
Class 3 Slip #3 - Idle.
Class 3 Slip #4 - Idle.
Class 3 Slip #5 - Idle.
Class 3 Slip #6 - Idle.
Class 1 Slip #1 - Soobrazitelny-class (Project 69) destroyer Bystry laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #2 - Soobrazitelny-class (Project 69) destroyer Soznatelnyy laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #3 - Soobrazitelny-class (Project 69) destroyer Burlivyy laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #4 - Soobrazitelny-class (Project 69) destroyer Besstrashniy laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.
Class 0 Slip #3 - Idle.
Class 0 Slip #4 - Idle.

Dockside:
- Battlecruiser Rostislav (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q4/1944 for a total of 27000 / 48000 tons. 21000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser Potemkin (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q4/1944 for a total of 27000 / 48000 tons. 21000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser Georgii Pobedonosets (Project 65) laid down January 1st, 1942. 48,000 tons required. 0 tons added in Q4/1944 for a total of 21000 / 48000 tons. 21000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser Retvizan (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q4/1944 for a total of 30000 / 48000 tons. 18000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Aircraft carrier Afonskoye (Project 67) laid down January 1st, 1943. 22,791 tons required. 3000 tons added in Q4/1944 for a total of 15000 / 22791 tons. 7791 / 22791 tons remaining. Launched June 30th, 1944. Completed September 12th, 1945.
- Kola-class tanker Kola laid down January 1st, 1943. 9505 tons required. 1182 tons added in Q4/1944 for a total of 9505 / 9505 tons. 0 / 9505 tons remaining. Launched August 13th, 1943. Completed October 16th, 1944.
- Kola-class tanker Novaya Zemlya laid down January 1st, 1943. 9505 tons required. 1182 tons added in Q4/1944 for a total of 9505 / 9505 tons. 0 / 9505 tons remaining. Launched August 13th, 1943. Completed October 16th, 1944.
- Icebreaker Angara (Project 62) laid down January 1st, 1943. 13469 tons required. 1653 tons added in Q4/1944 for a total of 13469 / 13469 tons. 0 / 13469 tons remaining. Launched October 1st, 1943. Completed November 14th, 1944.
- Project 73 "Obsidian" type frigate SKR-01 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-02 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-03 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-04 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Gostinitsa-class (Project 61) patrol boat #51 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #52 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #53 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #54 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Kronshtadt: Admiralty Shipyard No.194
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.

Dockside:
- Harbor icebreaker Gavrila Derzhavin (Project 74) laid down April 1st, 1944. 1496 tons required. 400 tons added in Q4/1944 for a total of 1200 / 1496 tons. 296 / 1496 tons remaining. Laid down April 1st, 1944. Launched August 6th, 1944. Completed February 14th, 1945.

Tallinn: Admiralty Shipyard Tallinn
Class 3 Drydock #1 - Idle.
Class 3 Drydock #2 - Idle.
Class 3 Drydock #3 - Idle.
Class 3 Drydock #4 - Idle.
Class 1 Drydock #1 - Idle.

Dockside:
- Harbor icebreaker Alexander Bestuzhev (Project 74) laid down April 1st, 1944. 1496 tons required. 400 tons added in Q4/1944 for a total of 1200 / 1496 tons. 296 / 1496 tons remaining. Laid down April 1st, 1944. Launched August 6th, 1944. Completed February 14th, 1945.

Arkhangelsk: Severnoye Mashinostroitelnoye Predpriyatie (Sevmash No.402) and Zvezdochka Shipyard
Class 4.5 Slip #1 - Aircraft Carrier Reval (Project 65) laid down January 1st, 1944. 49,854 tons required. 2500 tons added in Q4/1944 for a total of 10000 / 49854 tons. 39854 / 49854 tons remaining. Launched December 17th, 1945. Completed November 27th, 1948.
Class 2 Slip #1 - Smolensk-class (Project 70) torpedo cruiser Volgograd laid down July 1st, 1944. 3,475 tons required. 1,000 tons added Q4/1944 for a total of 2000 / 3475. 1475 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
Class 2 Slip #2 - Smolensk-class (Project 70) torpedo cruiser Pskov laid down July 1st, 1944. 3,475 tons required. 1,000 tons added Q4/1944 for a total of 2000 / 3475. 1475 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
Class 2 Slip #3 - Smolensk-class (Project 70) torpedo cruiser Odessa laid down July 1st, 1944. 3,475 tons required. 1,000 tons added Q4/1944 for a total of 2000 / 3475. 1475 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
Class 2 Slip #4 - Idle.
Class 2 Slip #5 - Idle.
Class 2 Slip #6 - Idle.
Class 1 Slip #1 - Project 73 "Obsidian" type frigate SKR-09 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #2 - Project 73 "Obsidian" type frigate SKR-10 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #3 - Project 73 "Obsidian" type frigate SKR-11 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #4 - Project 73 "Obsidian" type frigate SKR-12 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.

Dockside:
- Smolensk-class (Project 70) torpedo cruiser Smolensk laid down January 1st, 1944. 3,475 tons required. 475 tons added Q4/1944 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched May 31st, 1944. Completed January 15th, 1945.
- Smolensk-class (Project 70) torpedo cruiser Mykolaiv laid down January 1st, 1944. 3,475 tons required. 475 tons added Q4/1944 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched May 31st, 1944. Completed January 15th, 1945.
- Smolensk-class (Project 70) torpedo cruiser Kronstadt laid down January 1st, 1944. 3,475 tons required. 475 tons added Q4/1944 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched May 31st, 1944. Completed January 15th, 1945.
- Soobrazitelny-class (Project 69) destroyer Soobrazitelny laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class (Project 69) destroyer Rezvy laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class (Project 69) destroyer Strashnyi laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class destroyer Smeliy laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Gostinitsa-class (Project 61) patrol boat #55 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #56 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Murmansk: Shipyard #10 Polyarny, "Shkval"
Class 4.5 Drydock #1 - Idle.
Class 3 Drydock #1 - Idle.
Class 3 Drydock #2 - Minsk-class torpedo cruiser Bryansk undergoing reconstruction. 626 tons required. 626 tons added Q4/1944 for a total of 626 / 626. 0 / 626 tons remaining until completion. Reconstruction requires 2.4 months.
Class 2 Drydock #1 - Minsk-class torpedo cruiser Irkutsk undergoing reconstruction. 626 tons required. 626 tons added Q4/1944 for a total of 626 / 626. 0 / 626 tons remaining until completion. Reconstruction requires 2.4 months.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Class 0 Drydock #2 - Idle.

Dockside:
None

Rostov-on-Don: Black Sea Shipyard, Rostov-on-Don
Class 3 Slip #1 - Idle.
Class 1 Slip #1 - Project 73 "Obsidian" type frigate SKR-07 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #2 - Project 73 "Obsidian" type frigate SKR-08 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 0 Slip #1 - Gostinitsa-class (Project 61) patrol boat #57 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
Class 0 Slip #2 - Gostinitsa-class (Project 61) patrol boat #58 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Dockside:
- Project 73 "Obsidian" type frigate SKR-05 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-06 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.

Sevastopol: Sevastopol Shipyard No.201, Sevastopol
Class 3 Drydock #1 - Moskva-class torpedo cruiser Orel undergoing reconstruction. 610 tons required. 610 tons added Q4/1944 for a total of 610 / 610. 0 / 610 tons remaining until completion. Reconstruction requires 2.4 months.
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.

Dockside:
None

Astrakhan: Admiralty Shipyard No.39, Astrakhan
Class 1 Drydock #1 - Idle.

Dockside:
None

Vladivostok: Dalzavod Yard, Vladivostok, Zvezda Shipyard, Bolshoy Kamen, and Amur Shipbuilding Plant, Komsolosk-on-Amur
Class 4.5 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 1 Drydock #2 - Idle.
Class 0 Drydock #1 - Idle.
Class 4.5 Slip #1 - Aircraft Carrier Rymnik (Project 65) laid down January 1st, 1944. 49,854 tons required. 2500 tons added in Q4/1944 for a total of 10000 / 49854 tons. 39854 / 49854 tons remaining. Launched December 17th, 1945. Completed November 27th, 1948.
Class 1 Slip #1 - Soobrazitelny-class (Project 69) destroyer Razumny laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #2 - Soobrazitelny-class (Project 69) destroyer Provorny laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.

Dockside:
- Soobrazitelny-class (Project 69) destroyer Rekordny laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class (Project 69) destroyer Blestyashchyy laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Gostinitsa-class (Project 61) patrol boat #59 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #60 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Petropavlovsk-Kamchatsky: Kamchatsky Shipyard No.49 "Gornyak"
Class 3 Drydock #1 - Kiev-class torpedo cruiser Perekop undergoing reconstruction. 570 tons required. 570 tons added Q4/1944 for a total of 570 / 570. 0 / 570 tons remaining until completion. Reconstruction requires 2.4 months.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.

Dockside:
None

Cam Ranh Bay (Indochina): Admiralty Shipyard No.191 "Alyans"
Class 4 Drydock #1 - Kiev-class torpedo cruiser Magadan undergoing reconstruction. 570 tons required. 570 tons added Q4/1944 for a total of 570 / 570. 0 / 570 tons remaining until completion. Reconstruction requires 2.4 months.
Class 1 Drydock #1 - Idle.
Class 1 Drydock #2 - Idle.

Dockside:
None

From Factories
- 3 Levkov L-11 fast attack craft constructed for 30 tons each and delivered to the trials and testing unit on the Sea of Azov.
- 10 Project 71 "Gematit" class coastal minesweepers constructed for 148 tons apiece.

Transactions
None

Scrapping Report
- 4 Admiral Lazarev-class cruisers finish scrapping.
- 18 Orphey-class destroyers begin scrapping at dockside. No tonnage removed this quarter; scrapping to complete Q1/1945.

- Total tonnage in recycling until Q3/1944: (11x175) + (4x513) + (29x66) = 5891t
- Total tonnage in recycling until Q4/1944: (4x342) + (4x628) + (1x588) + (2x513) = 5494t
- Total tonnage in recycling until Q1/1945: (4x503) + (1x406) + (2x342) + (4x628) = 5614t
- Total tonnage in recycling until Q2/1945: (4x503) = 2012

Other Notes
Design work completes on Project 76 class cruisers; two vessels ordered for 1945 and two more for 1946. Tentatively named Avrora class.

Order of Battle, December 31st, 1944
Note: X (Y)+Z = completed (under repair/refit) + under construction

The Fleet
Battleships: 18(0)+0
Battlecruisers: 5(0)+4
Coast Defense Battleships: 2(0)+0
Aircraft Carriers: 12(0)+3
Heavy / Armoured Cruisers: 12(0)+0
Escort Cruisers: 4(0)+0
Escort Carriers: 3(0)+0
Light Cruisers: 53(0)+3
Destroyers: 123(0)+6-18
Frigates: 6(0)+6
Sloops: 4(0)+0
Corvettes: 100(0)+0
Fleet Submarines: 40(0)+0
Coastal Submarines: 120(0)+0

Coastal Forces
Patrol Boats: 80(0)+0
Submarine Chasers: 170(0)+0
MTB: 340(0)+0
Experimental Fast Attack Craft: 9(0)+0
Minelayers: 50(0)+0
Minesweepers: 22(0)+0
Light Minesweepers: 20(0)+0

Fleet Services
Seaplane Carriers: 4(0)+0
Repair Ships: 2(0)+0
Fleet Icebreakers: 7(0)+0
Shallow-draft Icebreakers: 2(0)+0
Port Icebreakers: 20(0)+2
Fleet Oilers: 8(0)+0
Ice-Capable Fleet Oilers: 2(0)+0
Light Oilers: 4(0)+0
Destroyer Tenders: 3(0)+0
Corvette/Submarine Tenders: 19(0)+0
Sail Training Ship: 1(0)+0

Amphibious Forces
Amphibious Command Ships: 2(0)+0
Heavy Landing Ship (Caiman): 8(0)+0
Amphibious Transport Ships (Alligator): 12(0)+0
Amphibious Assault Ships (Krokodill): 18(0)+0
Amphibious Assault Boats: 62(0)+0

2

Tuesday, September 23rd 2014, 3:49am

Addendum to the above report: at some point, I thought I'd accounted for five escort carriers of the Aldeberan-class, which matched with the numbers AdmK had in his reports. But I just searched through the old sim reports this evening trying to find when they were converted, and I came to two conclusions.

First, the ship I'd thought was #5 in class, named Cygnus in the reports and converted in 1943, is apparently not of the Aldeberan class, but is its own unique design.

Second, I cannot account for two more Aldeberan-class ships. I'd found Orion in AdmK's order-of-battle, but this is apparently the ship converted in 1939 (which I'd presumed was Aldeberan). Apparently, then, I double-counted both Orion and Aldeberan. Similarly, I apparently picked up a Pollux somewhere, and I have even less idea how that ship appeared.

Therefore, instead of having two Canopus and five Aldeberan class escort carriers, I am revising the list to 2x Canopus, 2x Aldeberan (named Orion and Castor) and 1x Cygnus.