[SIZE=3]SAE Quarterly Reports[/SIZE]
No. 12 – October to December 1923
Transfers:
None
Factories:
26 factories total can be used.
Fixed factories
5 factories will be fixed to produce infrastructure points for 1923.
Flexible factories
688ts material transferred from Q3
19,081s material necessary to be produced in this quarter (20 factories).
1 factory producing 0,1pts for infrastructure.
Infrastructure points used this quarter:
0,1pts put into a new Type 1 Dock in Daressalam for a total of 0,7pts at the end of Q4
1,0pts put into a new Type 0 Dock in Libreville for a total of 1pts at the end of Q4
[SIZE=3]Ships: [/SIZE]
Minor vessels
Completed Units
13x Flower-class minesweeper
15x Tree-class minesweeper
7x Bush-class minesweeper
7x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops
4x Guard-class patrol crafts
4x Mimir-class floatplane carriers
On Trials
1x Bush-class minesweeper
- Buckthorn running trials until December 23
1x Guard-class patrol craft
- Keeper running trials until February 24
Ordered Units
2x Bush-class minesweeper (11 month á 53ts material necessary per unit)
- Blackthorn laid down in St. Helena on a Type 0 slip in July, completed in April 24
- Firethorn laid down in Port Louis on a Type 0 slip in August, completed in April 24
1x Guard-class patrol craft (11 month á 175ts material necessary per unit)
- Watcher laid down in Durban on a Type 1 slip in July, completed in May 24
2x Pleiades-class light destroyer (10 month á 60ts material necessary per unit)
- Maia laid down in Buenos Aires on a Type 0 slip in January, completed October 23
- Merope laid down in Montevideo on a Type 0 slip in February, completed November 23
Refit
4x Centaur-class Sloop (2 month á 120ts material necessary per unit)
- Rhötos entering a Type 1 dock in Douala in October. Leaving the dock in November, the sloop will stay another month in the yard.
- Peträos entering a Type 0 dock in Douala in October. Leaving the dock in November, the sloop will stay another month in the yard.
- Diktys entering a Type 1 dock in Libreville in October. Leaving the dock in November, the sloop will stay another month in the yard.
- Cyllaros entering a Type 0 dock in Libreville in October. Leaving the dock in November, the sloop will stay another month in the yard.
Destroyers
Completed Units
11x Bird-class torpedoboat
12x Cat-class torpedoboat
12x Hound-class torpedoboat
10x Nymph-class destroyer (Type 21)
On Trials
2x Nymph-class destroyers (Type 21)
- Euarne running trials until February 24
- Eudora running trials until March 24
Ordered Units
6x Nymph-class destroyer (Type 23 - 11 month á 127ts material necessary per unit)
- Galateia laid down in Mar del Plata on a Type 1 slip in January, completed in November 23
- Eukrante laid down in Daressalam on a Type 1 slip in February, completed in December 23
- Eulimene laid down in Douala on a Type 1 slip in February, completed in December 23
- Eupompe laid down in Buenos Aires on a Type 1 slip in February, completed in December 23
- Eunike laid down in Montevideo on a Type 1 slip in March, completed in January 24
- Galene laid down in St. Helena on a Type 1 slip in March, completed in January 24
Class B Cruisers
Completed Units
11x Insect-class torpedoboat
4x Nampula-class light cruiser
5x Pietermaritzburg-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
On Trials
3x Rosario-class light cruiser
- Rosario running trials until December 23
- San Lorenzo running trials until November 23
- Koumba running trials until January 24
Ordered Units
1x Rosario-class light cruiser (17 month á 457ts material necessary per unit)
- Belinga laid down in Daressalam on a Type 2 slip in October, completed in February 24
Class A Cruisers
Completed Units
1x Colony-class AC
2x General-class AC
Ordered Units
4x Cape-class armored cruiser (22 month á 573ts material necessary per unit)
- Cape Lopez laid down in Durban on a Type 3 slip in January 23, completed in October 24
- Cape Good Hope laid down in Cape Town on a Type 3 slip in February 23, completed in November 24
- Cape Corrientes laid down in Cape Town on a Type 3 slip in February 23, completed in November 24
- Cape Delgado laid down in Buenos Aires on a Type 3 slip in January 23, completed in October 24
Capital Units
Completed Units
1x Madagascar-class
2x Sao Tome-class
2x Hertog-class
4x King-class
2x Mauritius-class
2x South Africa-class
Ordered Units
2x Mocambique-class (768ts/month material necessary per unit)
- Mocambique building on a Type 4 slip in Durban until October 1923
- Rhodesia building on a Type 4 slip in Durban until July 1924
Refit
2x Hertog-class battlecruiser (18 month á 706ts material necessary per unit)
- Hertog Rijnard entering a Type 3 dock in Douala in August. Leaving the dock in March 24, the battlecruiser will stay in the yard.until January 25
- Hertog Alexander entering a Type 3 dock in Cape Town in October. Leaving the dock in May 24, the battlecruiser will stay in the yard.until March 25
Coastal Defence Units
Completed Units
Nonce
Ordered Units
None
Carriers
Completed Units
1x Wim Kraash-class (converted freighter, rated as experimental)
Ordered Units
None
Class A Submarines
Completed Units
12x E-class submarine
16x F-class submarine
4x J-class submarine
Ordered Units
None
Class B Submarines
Completed Units
14x G-class submarine
15x I-class submarine
12x H-class submarine
Ordered Units
Non-combatants
Completed Units
14x Bay-class tender (several different designs)
Ordered Units
None
----------------------------------------------------------------------------------------------------------
At the beginning of this quarter the RSAN consists of (completed units only):
36 minesweepers
47 small patrol crafts
47 TB/DDs (does not include 11 TBs with 15cm guns)
43 cruisers category b (does include 11 TBs with 15cm guns)
3 cruisers category a
13 capital units
1 experimental carrier (conversion)
41 submarines category b
32 submarines category a
4 floatplane carriers
13 armed tenders
plus uncounted auxiliary vessels of all kind.