[SIZE=5]Report for Q3/1940[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 24/27 factories producing 24,000t materials.
- 2/27 factories producing infrastructure (dedicated)
- 1/27 factories producing infrastructure (undedicated)
- 3,568t from stockpile.
- 1,000t from transactions.
- 28,568t materials total.
- 19,627t used.
- 8,941t stored for Q4/40.
[SIZE=3]Infrastructure Development [/SIZE]
0.2 IP created.
- 0.1 IP added to Papeete D3 drydock to lengthen to D3.5. 0.5 IP added of 0.5 IP required; 0.0 IP remaining.
- 0.1 IP added to La Rochelle S4 to lengthen to S4.5. 0.1 IP added of 0.5 IP required; 0.4 IP remaining.
[SIZE=3]Naval Construction [/SIZE]
At La Rochelle (Cl 5)
Class 4 Slip #1 - Lengthening to S4.5.
Class 4 Slip #2 - Idle
Class 3 Slip #1 - Heavy Cruiser Téméraire laid down January 1940. 17,079 tons required. 2100 tons added Q3/1940 for total of 6300 / 17,079 tons. 10,779 tons remaining until completion.
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Minesweeper Capucine laid down July 1, 1940. 578 tons required. 300 tons added in Q3/1940 for a total of 300 / 578. 278 tons remaining. Completes Q2/1941.
Class 1 Slip #2 - Minesweeper Petunia laid down July 1, 1940. 578 tons required. 300 tons added in Q3/1940 for a total of 300 / 578. 278 tons remaining. Completes Q2/1941.
Class 1 Slip #3 - Minesweeper Tulipe laid down April 1, 1940. 578 tons required. 278 tons added in Q3/1940 for a total of 578 / 578. 278 tons remaining. Completes Q1/1941. Launched.
Class 1 Slip #4 - Minesweeper Dahlia laid down April 1, 1940. 578 tons required. 278 tons added in Q3/1940 for a total of 578 / 578. 278 tons remaining. Completes Q1/1941. Launched.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Dockside:
- Curaissier Libertie laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q3/1940 for a total of 33000 / 45986. 12,986 tons remaining. Launched Q1/1940.
- Curaissier Justice laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q3/1940 for a total of 33000 / 45986. 12,986 tons remaining. Launched Q1/1940.
- SS Sfax laid down October 1, 1939. 1,166 tons required. 0 tons added in Q3/1940 for a total of 1166 / 1166. 0 tons remaining. Completed.
- SS Casabianca laid down October 1, 1939. 1,166 tons required. 0 tons added in Q3/1940 for a total of 1166 / 1166. 0 tons remaining. Completed.
- SS Caroline laid down October 1, 1939. 1,166 tons required. 0 tons added in Q3/1940 for a total of 1166 / 1166. 0 tons remaining. Completed.
- SS Ouessant laid down October 1, 1939. 1,166 tons required. 0 tons added in Q3/1940 for a total of 1166 / 1166. 0 tons remaining. Completed.
- SS Galétée laid down October 1, 1939. 1,166 tons required. 0 tons added in Q3/1940 for a total of 1166 / 1166. 0 tons remaining. Completed.
- SS Minerve laid down October 1, 1939. 1,166 tons required. 0 tons added in Q3/1940 for a total of 1166 / 1166. 0 tons remaining. Completed.
- MSW Aubepine laid down January 1, 1940. 578 tons required. 0 tons added in Q3/1940 for a total of 578 / 578. 0 tons remaining. Completes Q4/1940. Launched.
- MSW Hortensia laid down January 1, 1940. 578 tons required. 0 tons added in Q3/1940 for a total of 578 / 578. 0 tons remaining. Completes Q4/1940. Launched.
At Brest (Cl 5)
Class 3 Drydock #1 - Heavy cruiser Suffren converted into training carrier; 4,767 tons required. 567 tons added Q3/1940 for total of 4767 / 4767. 0 tons remaining. Completed.
Class 2 Drydock #1 - CL Georges Leygues undergoing conversion into minelaying cruiser. 3,804 tons required. 1,750 tons added Q3/1940 for total of 3500 / 3804. 304 tons remaining until completion. Completes Q4/1940.
Class 1 Drydock #1 - Arabe-class destroyer #1 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
At Abidjan (Cl 5)
Class 3 Drydock #1 - Arabe-class destroyer #2 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining. Arabe-class destroyer #3 scrapping (in same dock). 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 1 Drydock #1 - Arabe-class destroyer #4 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
At Marseilles (Cl 5)
Class 4 Drydock #1 - CL Dupleix begins conversion into minelaying cruiser. 3,804 tons required. 1750 tons added Q3/1940 for total of 1750 / 3804. 2054 tons remaining until completion. Completed Q1/1941.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 2 Drydock #1 - CL De Grasse begins conversion into minelaying cruiser. 3,804 tons required. 304 tons added Q3/1940 for total of 3804 / 3804. 0 tons remaining until completion. Completed Q3/1940.
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Arabe-class destroyer #5 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 0 Drydock #1 - Bisson-class destroyer #1 scrapping. 3.24 months to scrap. 100/108 tons recovered; 8/108 tons remaining.
Dockside:
- Aircraft Carrier Ocean laid down Q1/38. 28,624 tons required. 0 tons added Q3/1940 for total of 28624 / 28624 tons. 0 tons remaining until completion.
- Aircraft Carrier Bucentaure laid down Q1/39. 35,000 tons required. 3000 tons added Q3/1940 for total of 21000 / 35000 tons. 14,000 tons remaining until completion.
At Oran (Cl 5)
Class 1 Drydock #1 - Arabe-class destroyer #6 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 0 Drydock #1 - Bisson-class destroyer #2 scrapping. 3.24 months to scrap. 100/108 tons recovered; 8/108 tons remaining.
At Tunis (Cl 5)
Class 4 Drydock #1 - Aircraft Carrier Conquérant laid down Q2/39. 35,000 tons required. 3000 tons added Q3/1940 for total of 18000 / 35000 tons. 17,000 tons remaining until completion. Launched.
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Arabe-class destroyer #7 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
At Beiruit (Cl 5)
Class 3 Drydock #1 - Arabe-class destroyer #8 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining. Arabe-class destroyer #9 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 1 Drydock #1 - Arabe-class destroyer #10 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
At Djibouti (Cl 2)
Class 1 Drydock - Arabe-class destroyer #11 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
At Crozet Island (Cl 2)
Class 2 Drydock #1 - Arabe-class destroyer #12 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 1 Drydock #1 - Arabe-class destroyer #13 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
At Saigon (Cl 5)
Class 4 Drydock #1 - Arabe-class destroyer #14 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining. Arabe-class destroyer #15 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 1 Drydock #1 - Arabe-class destroyer #16 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 0 Drydock #1 - Bisson-class destroyer #3 scrapping. 3.24 months to scrap. 100/108 tons recovered; 8/108 tons remaining.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Dockside:
- SS Phénix laid down October 1, 1939. 600 tons required. 0 tons added in Q3/1940 for a total of 600 / 600. 0 tons remaining. Completed Q3/1940.
- SS Poncelet laid down October 1, 1939. 600 tons required. 0 tons added in Q3/1940 for a total of 600 / 600. 0 tons remaining. Completed Q3/1940.
- SS Prométhée laid down October 1, 1939. 600 tons required. 0 tons added in Q3/1940 for a total of 600 / 600. 0 tons remaining. Completed Q3/1940.
- SS Psyché laid down October 1, 1939. 600 tons required. 0 tons added in Q3/1940 for a total of 600 / 600. 0 tons remaining. Completed Q3/1940.
- SS Hermione laid down October 1, 1939. 600 tons required. 0 tons added in Q3/1940 for a total of 600 / 600. 0 tons remaining. Completed Q3/1940.
- SS Gorgone laid down October 1, 1939. 600 tons required. 0 tons added in Q3/1940 for a total of 600 / 600. 0 tons remaining. Completed Q3/1940.
Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Bisson-class destroyer #4 scrapping. 3.24 months to scrap. 100/108 tons recovered; 8/108 tons remaining.
At New Caledonia (Cl 5)
Class 4 Drydock #1 - Arabe-class destroyer #17 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining. Arabe-class destroyer #18 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 2 Drydock #1 - Arabe-class destroyer #19 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 1 Drydock #1 - Arabe-class destroyer #20 scrapping. 3.4 months to scrap. 146/166 tons recovered; 20/166 tons remaining.
Class 0 Drydock #1 - Bisson-class destroyer #5 scrapping. 3.24 months to scrap. 100/108 tons recovered; 8/108 tons remaining.
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 -Idle
Dockside:
N/A
At Papeete (Cl 3)
Class 3.5 Drydock - Being lengthened to Type 3.5.
On Trials:
- SS Ajax until Q3/1940.
- SS Archimède until Q3/1940.
- SS Argo until Q3/1940.
- SS Africaine until Q3/1940.
- SS Astrée until Q3/1940.
- SS Aurore until Q3/1940.
- SS Vénus until Q3/1940.
- SS Sirène until Q3/1940.
- SS Fresnel until Q3/1940.
- SS Créole until Q3/1940.
- SS Bayadère until Q3/1940.
- SS Favorite until Q3/1940.
- SS Andromède until Q4/1940.
- SS Antigone until Q4/1940.
- SS Andromaque until Q4/1940.
- SS Artémis until Q4/1940.
- SS Armide until Q4/1940.
- SS Agosta until Q4/1940.
- SS Monge until Q4/1940.
- SS Henri Poincaré until Q4/1940.
- SS Pascal until Q4/1940.
- SS Pasteur until Q4/1940.
- SS Pégase until Q4/1940.
- SS Persée until Q4/1940.
- SS Sfax until Q1/1941.
- SS Casabianca until Q1/1941.
- SS Caroline until Q1/1941.
- SS Ouessant until Q1/1941.
- SS Galétée until Q1/1941.
- SS Minerve until Q1/1941.
- SS Phénix until Q1/1941.
- SS Poncelet until Q1/1941.
- SS Prométhée until Q1/1941.
- SS Psyché until Q1/1941.
- SS Hermione until Q1/1941.
- SS Gorgone until Q1/1941.
- Faucon #6, #7, #8, #9, #10 on trials following refits.
[SIZE=3]Transactions [/SIZE]
- 0.1 IP traded to Latvia in exchange for 1,000 tons of materials
[SIZE=3]Other Notes [/SIZE]
The battleships Libertie and Justice have been launched by the naval yards in La Rochelle and are now under construction at the pierside. Construction on the carrier Ocean is proceeding apace, with all materials now added to the ship, which will finish in 1941.
[SIZE=3]Ships being scrapped [/SIZE]
- 5 Bisson-class destroyers (108 tons per ship, 100/108 in Q3/40)
- 20 Arabe-class destroyers (166 tons per ship, 146/166 in Q3/40)
Total tonnage in recycling until Q2/1941: (5x100)+(20x146) = 3,420 tons
[SIZE=3]Updated Order of Battle, End of Q3/1940[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction
BB: 7(0)+2
BC: 4(0)+0
CV:5(0)+3
CA: 13(0)+1
CL: 28(2)+0
Monitors: 5(0)+0
DD: 91(25)+0
Sloops: 8(0)+0
Fleet Submarine: 39(0)+0
Coastal Submarine: 94(0)+0
Gunboats: 34 (0)+0
Minesweepers: 20(0)+6
Fleet Train:
Fast Oilers: 6(0)+0
Sail Training Ships: 2(0)+0
Amphibious Assault ships: 8(0)+0
Ocean Research Ships: 2(0)+0
Edit February 23: added ships scrapping