You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, June 23rd 2007, 3:35am

Republic of France, Q4/34

B]A. Industrial Allocation [/B]

13/26 factories to naval materials: 13,000 tons created for Q4/34. 2,737 tons saved from Q3/34, for a total of 15,737 tons available.

13/26 factories (committed) to infrastructure development: 2.6 pts

0/26 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.

B. Infrastructure Development

Continue 1 factory at Phnom Penh - 8.0 pts added by Q4/34. 2.0 pts added in Q4/34 to complete..

Expand Class 3 Drydock #1 at Saigon to Class 4 - 0.3 pts added by Q4/34. 0.2 pt added in Q4/34. 0.5 pts remaining.

Expand Class 3 Drydock #1 at Noumea to Class 4 - 0.3 pts added by Q4/34. 0.2 pt added in Q4/34. 0.5 pts remaining.

Begin Class 1 Port at Chrouy Svay, Kampuchea. 0.3 pts added by Q3/34. 0.2 pt added in Q4/34. 2.5 pts remaining.

C. Naval Construction

At La Rochelle
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 3 Slip #1 - Battlecruiser Dunkirque laid down 1 July 1934. 1,370 tons added by Q4/34. 1,370 ton added in Q4/34. 29,165 tons remaining.
Class 3 Slip #2 - Battlecruiser Dunkirque laid down 1 July 1934. 1,370 tons added by Q4/34. 1,370 ton added in Q4/34. 29,165 tons remaining.
Class 3 Slip #3 - Contre-Torpillieur Mogador laid down 2 January 1934. 2,250 tons added by Q4/34. 615 tons added in Q4/34 to complete.
Class 3 Slip #4 - Contre-Torpillieur Hoche laid down 2 January 1934. 2,250 tons added by Q4/34. 615 tons added in Q4/34 to complete.
Class 2 Slip #1 - Contre-Torpillieur Desaix laid down 2 January 1934. 2,250 tons added by Q4/34. 615 tons added in Q4/34 to complete.
Class 2 Slip #2 - Contre-Torpillieur Marceau laid down 2 January 2,250 tons added by Q4/34. 615 tons added in Q4/34 to complete.
Class 1 Slip #1 -
Class 1 Slip #2 -
Class 1 Slip #3 -
Class 1 Slip #4 -
Class 0 Slip #1 -
Class 0 Slip #2 -
Class 0 Slip #3 -
Class 0 Slip #4 -

At Brest
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

Cruise liner Marianne being built in the private yard of Chantiers et Ateliers de St. Nazaire, expected to be completed by 12/37

At Cayenne
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Abidjan
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Marseilles
Class 4 Drydock #1 - Battleship France rebuild begun 1/1/34. 6,750 tons added by Q4/34. 2,250 tons added in Q4/34. 10,748 tons remaining.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Oran
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Tunis
Class 4 Drydock #1 - Battleship Republique rebuild begun 1/1/34. 6,750 tons added by Q4/34. 2,250 tons added in Q4/34. 10,748 tons
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Idle

At Beiruit
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Djibouti (Cl 2)
Class 1 Drydock - Idle

At Crozet Island
Class 2 Drydock #1 - Scrapping battleship Courbet
Class 1 Drydock #1 - Idle

At Saigon
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle

At New Caledonia
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Repair ship Dakar being refitted. 2,273 tons added by Q4/34. 757 tons added in Q4/34 to complete.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle

At Papeete (Cl 3)
Class 3 Drydock - Idle

Launched ships being completed:

BB Richelieu laid down 3 January 1931. 31,900 tons added by Q4/34. 1,900 tons added in Q4/34. 78 tons remaining.

BB Courbet laid down 6 January 1931. 31,900 tons added by Q4/34. 1,900 tons added in Q4/34. 78 tons remaining.


D. Transactions

Ordered 8 420mm naval rifles from the Obukhov Works, Petrograd. Each gun weighs 135 tons. The total order comes to 1,080 tons, and a total of 1,200 tons of warship material will be paid to the Russian Federation.

300 tons warship material sent to the Russian Federation in payment in Q4/34 to complete payment..

E. Other Notes
8 single turrets for 420mm guns started. Each requires 600 tons warship materials, for a total of 4,800 tons required. 3,600 tons added by Q4/34. 1,200 tons added in Q4/34 to complete. Concrete work has been initiated near Saigon Indochina and Noumea New Caledonia.

Development of 420mm/45 begun.

15,7577 tons expended out of 15,757 tons available.
0 tons saved.

12x 12" guns from the scrapped battleship Paris, and 8x 190mm, 16x 164mm and 12x 100mm guns from the scrapped armored cruisers Gloire and Conde incorporated into the coastal defenses at Papeete, French Polynesia.

22x 140mm guns from the scrapped battleship Paris and 16x 155mm and 12x 75mm guns from the scrapped aircraft carriers Normandie and Languedoc incorporated into coast artillery defenses in French Polynesia.

New coast defense guns now available:


- 108x 10mm AA guns in 54 twin mounts
18 being installed at Tunis

- 400x 40mm AA guns in 200 twin mounts
40 being installed at Tunis
40 being installed at Papeete
16 being installed at Noumea
24 being installed at Saigon

F. Ships being scrapped

Battleship Courbet

G. Updated Order of Battle, 1 January 1935

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 5(2)+2
BC: 0(0)+2
CDS: 5(0)+0
CV:3(0)+0
CA: 6(0)+0
CL: 26(0)+0
Monitors: 5(0)+0
DD: 96(0)+0
Sloops: 0(0)+0
Fleet Submarine: 15(0)+0
Coastal Submarine: 70(0)+0

Edit: Began scrapping hull of Battleship Courbet

This post has been edited 3 times, last edit by "AdmKuznetsov" (Jun 24th 2007, 1:08pm)