You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, November 7th 2005, 11:08am

Germany Q1, 1928

German Naval Developments – Q1/28

A. Industrial Allocation

Factory Allocation:

Warship Material: 1
Infrastructure (Committed): 23 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 0

Warship Material Produced: 1000 t
Stockpile: 178 t
Recycled Scrap: 546 t
Material Used on Construction: 0 t
New Stockpile: 1724 t

B. Infrastructure Development

The Type 3 drydock at Kiel receives 0.3 pts, for 3.5 total.
Factory 25 receives 1 point, for 6 total.
Factory 26 receives 1 point, for 6 total.


C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle

At Bremerhaven

1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle

At Cuxhaven

1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: Idle

At Kiel

1 Type 3 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle

D. Transactions

None.

E. Other Notes

CL Bremen continues shake-down cruise

New Orders: None

F. Updated Order of Battle, 31/3/28

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+0,.
DD: 24(0)+0,
SL: 6(0)+0
AM: 10(0)+0

Note: PD = pre-dreadnought