Danish Naval Developments Q1 1933
a/ Industrial Allocation
8/11 factories producing materiel for shipbuilding = 8000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Slip No.6 (Type 0) at Aalborg extending to type 1, receives 0.2 IP = Total 0.2 IP points, balance 0.3 pts
Drydock No.1 (Type 0) at Phuket continues construction, receives 0.1 IP (Danish) and 0.1 IP (Iberian) = Total 1.0 IP points, complete
Drydock No.1 (Type 0) at Berbera, commences construction, receives 0.1 IP (Iberian) = Total 0.1 IP, balance 0.9 IP points
Drydock No.1 (Type 0) at St. Thomas, commences construction, receives 0.1 IP (Iberian) = Total 0.1 IP, balance 0.9 IP points
c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Eias, CA, laid down 02/08/32, receives 1769 tons, balance 7626 tons
No.2 type 2 slip - Skalmold, CL, laid down 02/10/32, receives 1164 tons, balance 3383 tons
No.3 type 1 slip - Lancer (e), DD, laid down 02/04/32, receives 226 tons to complete
No.4 type 1 slip - Lancer (f), DD, laid down 02/04/32, receives 226 tons to complete No.1 type 3 drydock - Idle
Dock side - Idle
Aarhus-
No.1 type 3 slip - Einmyria, CA, laid down 02/02/32, receives 1,749 tons, balance 4088 tons
No.2 type 2 slip - Herja, CL, laid down 02/10/32, receives 1165 tons, balance 3383 tons
No.3 type 1 slip - Lancer (g), DDL, laid down 02/04/32, receives 226 tons to complete
No.4 type 1 slip - Lancer (h), DDL, laid down 02/04/32, receives 226 tons to complete
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
Dock side - Ull, DD, laid down 02/04/32, receives 348 tons to complete
Aalborg-
No.1 type 1 slip - Diana, DD, laid down 02/01/33, receives 536 tons, balance 1420 tons
No.2 type 1 slip - William Tell, DD, laid down 02/01/33, receives 536 tons, balance 1420 tons
No.3 type 1 slip - Lancer (k), DDL, laid down 02/01/33, receives 400 tons, balance 1146 tons
No.4 type 1 slip - Lancer (j), DDL, laid down 02/01/33, receives 400 tons, balance 1146 tons
No.5 type 1 slip - Lancer (i), DDL, laid down 02/01/33, receives 400 tons, balance 1146 tons
No.6 type 0 slip - EXTENDING
Dock side - Artemis, DD, laid down 02/04/32, receives 348 tons to complete
Phuket-
No.1 type 0 drydock - BUILDING
Berbera-
No.1 type 0 drydock - BUILDING
St. Thomas-
No.1 type 0 drydock - BUILDING
d/ Transactions
None
e/ Other Notes
KDM c(Lancer) commissions on 13/03/1933
KDM d(Lancer) commissions on 13/03/1933
KDM Hrist commissions on 14/03/1933
KDM Herfjotur continues sea trials until 14/06/1933
KDM e(Lancer) commences sea trials on 12/02/1933
KDM f(Lancer) commences sea trials on 12/02/1933
KDM g(Lancer) commences sea trials on 12/02/1933
KDM h(Lancer) commences sea trials on 12/02/1933
KDM Ull commences sea trials on 24/02/1933
KDM Artemis commences sea trials on 24/02/1933
Tonnage from scrapping = 3869 tons
Tonnage Carried Over From This Quarter = 3140 tons
f/ Order of Battle
Note: X (Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 2/0 (0)
CL = 19 (0) + 3/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 30 (0) + 11/0 (0)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
Hopefully no errors!
This post has been edited 1 times, last edit by "Commodore Green" (Jan 28th 2007, 9:22pm)