Persia, Q4 1944
Industrial Allocation
1 factories allocated to building warship material
2 factories allocated to production of infrastructure materials
1,000 t produced + 949 t stockpiled = 1,949 t available
1,538 t used
411 t stockpiled
0.2 + 0.2 bonus IP produced.
Infrastructure Development
0.3 IP used as expansion of Bandar-e Abbas D0-A to D1 is completed.
0.1 IP to Hedjaz for D0 at As Salif.
Construction
At Bushehr (Persian Gulf)
D1: Idle
Free-floating:
Nada
At Bandar-e Abbas (Strait of Hormuz)
S1-A: DD Dorud receives 500 t, launched, to complete 5/45
S1-B: SL Naz laid down, receives 300 t, to complete 7/45
S0-A: ASW Launch SC-14 built, receives 100 t
S0-B: E-Boat MTB-36 built, receives 105 t, completed.
S0-C: Patrol Boat P-21 built, receives 40 t, completed
D2.5: CL Shir begins scrapping; some material due 3/45
D1: [Expansion Completed]
D0: Idle
Free-floating:
DD Chabahar receives 282 t, completed 11/44
AM M-12 receives 200 t, completed 11/44
At Bandar-e Anzali (Caspian Sea)
S1: Idle
D1: Idle
Built in factories
2 x 8 t LCVP built
1 x 35 t LCM built
Transactions:
Nothing
Other points of interest
TB Tehran, Baluchistan deleted from service - to scrap, 1945.
Updated Order of Battle, End of Quarter
Completed (Under Repair or Refit) + Under Construction
Heavy Cruisers (CA): 1(0) + 0
Light Cruisers (CL): 2(0) + 0
Destroyers (DD): 10(0) + 1
Torpedo Boats (TB): 11(0) + 0
Motor Torpedo Boats (MTB): 68(0) + 0
Submarines (SS): 9(0) + 0
Gunboats and Gunships (GB/GS): 2(0) + 0
Sloops and Escorts (SL/DE): 8(0) + 1
Submarine Chasers (SC): 14(0) + 0
Patrol Boats (PB): 21(0) + 0
Minesweepers (AM): 10(0) + 0
Harbour Tug (AT): 4(0) + 0
Fast Transports (APD): 2(0) + 0
Tenders (AD): 4(0) + 0
LCM: 3(0) + 0
LCVP: 6(0) + 0