You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, December 13th 2010, 11:06pm

Chinese Naval Developments – Q1/1940



[Size=3]A. Industiral Allocation[/Size]

8/11 factories (non-fixed) to naval materials: 8000 tons created for Q1/1940
3/11 factories (fixed) to infrastructure materials: 0.3pts created for Q1/1940

Stockpile after Q4/1939: 1771 tons

used for Transaction: 4565tons
received from others: 0tons

warmaterial recycling: 596tons (first quarter)
warmaterial recycling: 0 tons (second quarter)


Summary:
8000 tons (manufactured) + 1771tons (stockpiled) + 0 tons (recycled) - 4565tons (transaction) + 0 tons (received) = 5206tons

used at Tianjin: 0tons
used at Shanghai: 0tons
used at Zhanjiang: 1239tons
used at Kao-hsiung: 320tons
used at Taipei: 1260tons
used at Dairen: 500tons
used for small vessels: 0tons


Stockpile after Q1/1940: 1887tons


[Size=3]B. Infrastructure Development[/Size]

upgrading D3 - #1 in Shanghai to D4 - #1; 1.0pts needed, 0.3pts received


[Size=3]C. Naval Construction[/Size]

Bohai Shipbuilding at Tianjin:
S2 - #1: not in use
S1 - #1: reserved for Maoke-Class DD (reserved name: HICMS Bàozi); 1428tons needed; 0tons received
S1 - #2: reserved for Maoke-Class DD (reserved name: HICMS Lièbào); 1428tons needed; 0tons received
S0 - #1: not in use
S0 - #2: not in use
S0 - #3: not in use
S0 - #4: not in use
D1 - #1: reserved for Maoke-Class DD (reserved name: HICMS Hú); 1428tons needed; 0tons received
D0 - #1: not in use
D0 - #2: not in use


Freefloating / in completation:


Kiangnan Dock & Engineering Works at Shanghai:
S2 - #1: not in use
S1 - #1: reserved for Maoke-Class DD (reserved name: HICMS Níngmao); 1428tons needed; 0tons received
S0 - #1: not in use
S0 - #2: not in use
D3 - #1: upgrading to a Type4 drydock
D2 - #1: not in use


Freefloating / in completation:


Hudong-Zhonghua Shipbuilding at Zhanjiang:
S1 - #1: reserved for Maoke-Class DD (reserved name: HICMS Meizhoushi); 1428tons needed; 0tons received
S0 - #1: not in use
S0 - #2: not in use
D1 - #1: refit HICMS Juijang; ex Yugo-Class DD; 180tons needed; 180tons received; finished; start trials


Freefloating / in completation:
HICMS Chukou; 1059tons needed; 1059tons received; finished; start trials


Waigaoqiao Shipbuilding at Kaoshiun:
D0 - #1: refit HICMS Chang De (ex-Nagercoil); 70tons needed; 70tons received; finished; start trials
D0 - #2: refit HICMS Chung De (ex-Nagercoil); 70tons needed; 70tons received; finished; start trials
D1 - #1: refit HICMS Jujong; ex Yugo-Class DD; 180tons needed; 180tons received; finished; start trials


Freefloating / in completation:


Quindao Beihai Shipbuilding at Taipei:
S0 - #1: not in use
S0 - #2: not in use
S0 - #3: not in use
D0 - #1: not in use
D2 - #1: not in use
D3 - #1: not in use


Freefloating / in completation:
HICMS Pirooz II.; 1260tons needed; 1260tons received; finished; start trials


Zjiangjin Shipbuilding at Dairen:
D0 - #1: not in use
D1 - #1: not in use
D2 - #1: rebuilt HICMS Tsugaru; 4695tons needed; 500tons received


Freefloating / in completation:


[Size=3]D. Transactions[/Size]
Export: 4565tons

1500 tons to Philipinnes for seaplane cruiser (HICMS Shanton)

1800 tons to Yugoslavia for purchasing some vessels

665 tons to Italy for purchasing B-Class Frigates (first payment)

400 tons to Chile for purchasing Sampson Class DD

200 tons to Bharat for purchasing 2 S-107 Class Sloops



Import: 0tons


Conversion:
None this quarter.


[Size=3]E. Other Notes [/Size]
stored guns:
from scrapping PC Chao Ho & PC Ying Jui
4x 152mm
4x 102mm
4x 100mm




[Size=3]F. Small vessels [/Size]
Small vessels built by factories:
None

Small vessels built in drydocks:
None


[Size=3]G. Shakedown cruises[/Size]
small trials = 3 month:
None


great trials (ships over 500tons) = 6 month:
HICMS Song finished trials
HICMS Huangshi 402 in trials
HICMS Huangshi 403 in trials
HICMS Meizhouhu in trials
HICMS Liáng in trials
HICMS Horie in trials after 25% refit
HICMS Iwao in trials after 25% refit
HICMS Míngrén in trials
HICMS Heibào in trials
HICMS Láohù in trials
ABT-01 in trials
ABT-02 in trials
HICMS Chang De start trials after 25% refit
HICMS Chung De start trials after 25% refit
HICMS Jujong start trials after 25% refit
HICMS Juijiang start trials after 25% refit

######################
hope there is no fault in my report
######################

This post has been edited 1 times, last edit by "parador" (Dec 13th 2010, 11:14pm)