Regarding the repairs in Chosen. Just put it in one report with the dates finished behind the ships rather than spreading it over two reports:
Chosen’s Naval Developments – Q3/1922
A. Industrial Allocation
4/4 factories producing warship material = 4,000 t. No stockpiled materials available. 4,000 t are used, no materials stockpiled.
0/4 factories are dedicated to producing infrastructure material, = 0 pts.
B. Infrastructure Development
Factory V at 1.9 points. No points received this quarter
C. Naval Construction
Ryojun
D0: idle
D1: repairs to Asakaze; receives 357 tons; finished October 22, 1922
Minor repairs to Harukaze; receives 268 tons; finished October 6, 1922
Minor repairs to Matsukaze; receives 223 tons; finished September 29, 1922
Dairen
D1: idle
D2: repairs to Tenryu; receives 1589 tons; finished December 20, 1922
Minor repairs to Asama; receives 1115 tons; finished October 15, 1922
Minor repairs to Tatsuta; receives 371 tons; finished September 7, 1922
Minor repairs to Akikaze; receives 77 tons; finished September 1, 1922
D. Transactions
none.
E. Other Notes
Repairs on damaged ships from the IJN began on August 1.
Ship damage:
Asama at 87%; Requires 1115 tons and 2.3 months
Tenryu at 70%; Requires 1589 tons and 4.5 months
Tatsuta at 93%; Requires 371 tons and 1 month
Akikaze at 95%; Requires 77 tons and 0.6 moths
Asakaze at 76%; Requires 357 tons and 2.6 months
Harukaze at 82%; Requires 268 tons and 2 months
Matsukaze at 85%; Requires 223 tons and 1.7 months
F. Updated Order of Battle, 30/9/22
Note:
Y)+Z = completed (under repair/refit) + under construction
Coast Defense Battleship: 1
1st class Cruiser: 2 (0) + 0
2nd class Cruiser: 3 (0) + 0
Protected Cruiser: 4 (0) + 0
Gunboats: 3 (0) + 0
River Gunboats: 3 (0) + 0
Destroyers 2nd class: 2 (0) + 0
Destroyers 3rd class: 6 (0) + 0
TPB 1st class: 6 (0) + 0
TPB 2nd class: 7 (0) + 0