[SIZE=3]
Industrial Allocation[/SIZE]
- 9/9 factories producing 9,000t materials.
- 3,607 tons from stockpile.
- 0 tons from transactions
- 0 tons from scrapping
- 12,607 tons materials total.
- 9,199 tons used.
- 3408 tons stored for Q4/42.
- 0/9 factories dedicated to infrastructure.
[SIZE=3]
Infrastructure Development[/SIZE]
None at present
[SIZE=3]
Naval Construction[/SIZE]
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Battleship
Almirante Cochrane begins scrapping. 1014 / 4055 tons recovered Q3/1942.
S3.5: BC-11
O'Higgins laid down August 1st, 1941. 2,300 tons added Q3/42 for a total of 10,800 / 28,385 tons. 17,585 / 28,385 tons remaining until completion on April 3rd, 1944. Ship will be renamed
Almirante Cochrane upon launch.
D2.5: CLD-21
Chipana (
Battle-class destroyer leader) laid down April 1st, 1942. 900 tons added Q3/42 for a total of 1800 / 3,575 tons. 1,775 / 3,575 tons remaining. Ship launched on September 1st 1942. Ship will complete on April 18th, 1943.
D2: DD-59
Caprichoso undergoing partial reconstruction. 350 tons added Q3/1942 for a total of 350/350 tons. 0/350 tons remaining until completion. Reconstruction completed.
S2: CLD-22
Talcahuano (
Battle-class destroyer leader) laid down July 1st, 1942. 900 tons added Q3/42 for a total of 900 / 3,575 tons. 2,675 / 3,575 tons remaining. Ship will launch on December 1st 1942. Ship will complete on July18th, 1943.
S1: Idle
D0: Idle
Dockside:
- BC-09
Almirante Blanco Encalada laid down January 1st, 1940. 1,750 tons added Q3/42 for a total of 25000 / 28,385 tons. 3385 / 28,385 tons remaining until completion on April 3rd, 1943. Launched June 19th, 1941.
- CLD-18
Punta Gruesa (
Battle-class destroyer leader) laid down July 1st, 1941. 0 tons added Q3/42 for a total of 3,575 / 3,575 tons. 0 / 3,575 tons remaining. Ship launched on December 1st 1941. Completed on July 18th, 1942.
- CLD-19
Casma (
Battle-class destroyer leader) laid down October 1st, 1941. 875 tons added Q3/42 for a total of 3,575 / 3,575 tons. 0 / 3,575 tons remaining. Ship launched on March 1st 1942. Will complete on November 18th, 1942.
- CLD-20
Papudo (
Battle-class destroyer leader) laid down January 1st, 1942. 900 tons added Q3/42 for a total of 2,700 / 3,575 tons. 875 / 3,575 tons remaining. Ship launched on June 1st 1942. Ship will complete on January 18th, 1943.
ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Sea Gunboat
Regulus laid down July 1st, 1942. 180 tons added Q3/42 for a total of 180 / 180. Completed and launched on July 31st, 1942.
S1: Sea Gunboat
Fomalhaut laid down July 1st, 1942. 180 tons added Q3/42 for a total of 180 / 180. Completed and launched on July 31st, 1942.
D1: DD-50
Cobrizo undergoing partial reconstruction. 344 tons added Q3/1942 for a total of 344/344 tons. 0/344 tons remaining until completion. Reconstruction completed.
Dockside:
None
ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Light minesweeper
YDM-3 laid down July 1st, 1942. 190 tons added Q3/42 for total of 190 / 190. Completed and launched on July 31st, 1942.
S0: Sea Gunboat
Hassaleh laid down July 1st, 1942. 180 tons added Q3/42 for a total of 180 / 180. Completed and launched on July 31st, 1942.
Dockside:
- Landing ship
Elicura laid down January 1st, 1942. 150 tons added Q3/42 for total of 450 / 487; 37 / 487 tons remaining until completion on September 15th, 1942. Ship launched on April 24th, 1942.
ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle
Dockside:
None
from factories:
- N/A
On Trials
- YTB
Lago Jeinimeni finishes six months of builders trials.
- LSI(M)-02
Presidente Errazuriz continues six months of builders trials.
Scrapping
- Total tonnage in recycling until Q4/1942: (2x411) = 822 tons
- Total tonnage in recycling until Q1/1943: (2x192) = 384 tons
- Total tonnage in recycling until Q2/1943: (1x1014) = 1014 tons
[SIZE=3]
Transactions[/SIZE]
- N/A
[SIZE=3]
Other Notes[/SIZE]
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date not set. Project is in study stages at Sisdef.
- "Coati": Target date of mid-1944 set. Project is in initial study stages at Sisdef.
- "Pudu": Project is in production at Sisdef and FAMAE.
- Design N1.
[SIZE=3]
Order of Battle (Armada de Chile) September 31st, 1942[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Dreadnought Battleships:............1(0)+0-1
Dreadnought Battlecruisers:........1(0)+2
Coast Defense Ships:.................0(0)+0
Aircraft Carriers:........................3(0)+0
Heavy Cruiser:...........................1(0)+0
Light Cruisers:...........................8(0)+0
Floatplane Cruisers:...................1(0)+0
Destroyer Leaders:.....................3(0)+4 {3,000 tons std and up}
Destroyers:...............................34(0)+0 {1,200-3,000 tons std}
Destroyer Escorts:.....................16(0)+0
Light Destroyers:.......................8(0)+0 {under 1,200 tons std}
Torpedo Boats:.........................10(0)+0
Submarines:.............................10(0)+0
Floatplane Carriers:...................2(0)+0
Subchasers:.............................24(0)+0
Minesweepers:.........................19(0)+0
Arctic Patrol Vessel:..................3(0)+0
Fleet Train:
Destroyer Tenders:...................4(0)+0
Subchaser Tenders:..................2(0)+0
Submarine Tenders:..................1(0)+0
General Fleet Tenders:..............4(0)+0
Fleet Oilers:.............................12(0)+0
Colliers:...................................1(0)+0
Auxiliaries:
Sail Training Sloop:....................2(0)+0
Attack Transports:......................4(0)+0
Transports:................................2(0)+0
Fleet Tugs:................................4(0)+0
Light Harbour Tugs:....................4(0)+0
Netlayers:.................................2(0)+0
Oceanic Research Ship:...............1(0)+0
Pilot Boats:................................6(0)+0
Training Yawls:..........................6(0)+0
Amphibious Forces:
Landing Ship Vehicle:..................1(0)+0
Beach Discharge Lighter:.............1(0)+0
Attack Transports:......................4(0)+0
Landing Ship Infantry (Med):.......1(0)+1
Landing Ship Tank:.....................2(0)+0
Landing Ship Mechanized:..........0(0)+1
Landing Craft Tank:....................0(0)+0
Landing Craft Mechanized:..........11(0)+0
Landing Craft Assault:.................54(0)+0
Emergency Use:
Patrol Boats:.............................4(0)+0
Naval Trawlers:.........................16(0)+0
Transports:...............................2(0)+0
Museum Ships:.........................1(0)+0
Foreign Orders and Exports (Totals):
Fleet Tugs:...............................6(0)+0 (to China)
Light Harbour Tugs:..................20(0)+0 (to China)