[SIZE=3]SAE Quarterly Reports[/SIZE]
No. 5 – January to March 1922
Transfers:
0,8pts transferred from Indian factories in Q4.
[SIZE=3]Factories:[/SIZE]
25 factories total can be used.
Fixed factories
5 factories will be fixed to produce infrastructure points for 1922.
Flexible factories
101ts material transferred from Q4/21
19,432ts material necessary to be produced in this quarter (20 factories).
0 factory producing 0,0pts for infrastructure.
Infrastructure points used this quarter:
1,3pts put into a new factory (#26) for a total of 6,9pts at the end of Q1
0,0pts put into a new Type 1 Dock in Daressalam for a total of 0,2pts at the end of Q1
[SIZE=3]Ships:[/SIZE]
Minor vessels (unlimited tonnage)
Completed Units
13x Flower-class minesweeper
15x Tree-class minesweeper
7x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops
Ordered Units
7x Bush-class Minesweeper (11 month á 53ts material necessary per unit)
- Ivy laid down in Durban on a Type 0 slip in June 21, completed in March 22
- Syringa laid down in Durban on a Type 0 slip in July 21, completed in April 22
- Hazel laid down in Cape Town on a Type 0 slip in November 21, completed August 22
- Barberry laid down in Daressalam on a Type 0 slip in December 21, completed in September 22
- Blackberry laid down in Montevideo on a Type 0 slip in January
- Buddleia laid down in Montevideo on a Type 0 slip in January
- Ash laid down in Buenos Aires on a Type 0 slip in January
4x Guard-class Patrol Craft (11 month á 175ts material necessary per unit)
- Alerter laid down in Durban on a Type 3 slip in January
- Guard laid down in Cape Town on a Type 3 slip in February
- Look-Out laid down in Montevideo on a Type 4 slip in January
- Minder laid down in St. Helena on a Type 1 dock in January
3x Mimir-class Floatplane Carrier (11 month á 180ts material necessary per unit)
- Mimir (yet to be named) laid down in Cape Town on a Type 3 slip in February
- Trym laid down in Buenos Aires on a Type 3 slip in January
- Gymir laid down in Mare del Plata on a Type 2 slip in February
Destroyers (42,996ts of 176,000ts used – class b only – for completed units)
Completed Units
11x Bird-class torpedoboat
12x Cat-class torpedoboat
3x Hound-class torpedoboat
4x Nymph-class destroyer
Ordered Units
6x Nymph-class destroyer (11 month á 129ts material necessary per unit)
- Doris laid down in Majunga on a Type 1 slip in October 21, completed in August 22
- Doto laid down in Port Louis on a Type 1 slip in November 21, completed in September 22
- Dynamene laid down in Durban on a Type 1 slip in January
- Eione laid down in Durban on a Type 1 slip in January
- Erato laid down in Port Elizabeth on a Type 1 slip in February
- Euagora laid down in Daressalam on a Type 1 dock in January
8x Hound-class torpedoboat (11 month á 104ts material necessary per unit)
- Dachshund laid down in Montevideo on a Type 1 slip in March 21, completed January 22
- Terrier laid down in St. Helena on a Type 1 slip in March 21, completed January 22
- Husky laid down in Cape Town on a Type 1 slip in May 21, completed in February 22
- Greyhound laid down in Douala on a Type 1 slip in February
- Spaniel laid down in Montevideo on a Type 1 slip in March
- Borzoi laid down in Buenos Aires on a Type 1 slip in February
- Basenji laid down in Mar del Plata on a Type 1 dock in January
- Basset Fauve de Bretagne laid down in St. Helena on a Type 1 dock in March
Class B Cruisers (134,678ts of 308,000ts used for completed units)
Completed Units
11x Insect-class torpedoboat
4x Nampula-class light cruiser
5x Pietermaritzburg-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
Ordered Units
4x Libreville-class light cruiser (15 month á 355ts material necessary per unit)
- Libreville laid down in Daressalam on a Type 2 slip in January 21, completed in March 22
- Maroua laid down in Port Louis on a Type 2 slip in February 21, completed in April 22
- St. Denis laid down in Montevideo on a Type 2 slip in June 22, completed in August 22
- Iringa laid down in Buenos Aires on a Type 2 slip in July 21, completed in September 22
3x Rosario-class light cruiser (17 month á 457ts material necessary per unit)
- Rosario laid down in Durban on a Type 2 slip in February
- San Lorenzo laid down in Cape Town on a Type 2 slip in January
- Koumba laid down in Port Elizabeth on a Type 2 slip in March
Class A Cruisers (34,019ts of 132,000ts used for completed units)
Completed Units
1x Colony-class AC
2x General-class AC
Ordered Units
None
Capital Units (345,807ts of 440,000ts used for completed units)
Completed Units
1x Madagascar-class
2x Sao Tome-class
2x Hertog-class
4x King-class
2x Mauritius-class
2x South Africa-class
Ordered Units
2x Mocambique-class (768ts/month material necessary per unit)
- Mocambique building on a Type 4 slip in Durban until 1923
- Rhodesia building on a Type 4 slip in Durban until 1924
Coastal Defence Units (0ts of 40,000ts used for completed units)
Completed Units
Nonce
Ordered Units
None
Carriers (0ts of 110,000ts used for completed units)
Completed Units
1x Wim Kraash-class (converted freighter, rated as experimental)
Ordered Units
None
Class A Submarines (28,248ts (32 hulls) of 39,450ts (32 hulls) used for completed units)
Completed Units
12x E-class submarine
16x F-class submarine
4x J-class submarine
Ordered Units
None
Class B Submarines (18,114ts of 39,450ts used for completed units)
Completed Units
14x G-class submarine
15x I-class submarine
12x H-class submarine
Ordered Units
Non-combatants (unlimited tonnage)
Completed Units
14x Bay-class tender (several different designs)
Ordered Units
None