German Naval Developments – Q3/29, subject to update
A. Industrial Allocation
Factory Allocation:
Warship Material: 3
Infrastructure (Committed): 23 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 0
Warship Material Produced: 3000 t
Stockpile: 4781 t
Recycled Scrap: 426 t
Material Used on Construction: 5470 t
Received from sales: 838 t (Turkey)
New Stockpile: 3575 t
B. Infrastructure Development
Factory 27 receives 1 point, for 3 total.
Factory 28 receives 1 point, for 3 total.
Type 3 slipway at Kiel upgrade to Type 4 receives 0.3 pts, for 0.6 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: PD
Hessen conversion to target vessel receives 3000t
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
At Cuxhaven
1 Type 3 slip: CL Ersatz Amazone receives 1400t, launched
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: Idle
At Kiel
1 Type 3 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slips: Idle
1 Type 0 slip: Idel
1 Type 0 drydock: Idle
Free-floating: CL Ersatz Medusa receives 1070t, complete, commissioned as CL
Liepzig
D. Transactions
PD
Hanover begins conversion to target vessel
E. Other Notes
CL
Liepzig begins her shakedown cruise
S-1, S-2, S-3, S-4 continue their shakedown cruises.
F. Updated Order of Battle, 30/9/29
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 1(0)+0
CL: 12(0)+1,
DD: 18(0)+0,
SL: 6(0)+0
AM: 10(0)+0
TB: 4(0)+0
Note: PD = pre-dreadnought