You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, March 31st 2007, 8:09am

Turkey Q1/34

*subject to editing*

A. Industrial Allocation

2/6 factories (non-fixed) to naval materials: 2,000 tons created for Q1/1934 + 0 tons stockpiled from Q4/33 = 2,000 tons

1,417 tons used, 583 tons stockpiled for next quarter

1/6 factories (fixed) to infrastructure development: 0.1 points for Q1/1934

3/6 factories (non-fixed) to infrastructure development: 0.3 points for Q1/1934

Total 0.4 points created for Q1/34 for total of 0.4 IP's for use in Q1/34


B. Infrastructure Development

0.1 points added to one Type 3 Drydock at Icel
0.1 points added to Type 0 Slip at Icel

C. Naval Construction

Istambul
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 1 slip #3 - Idle
Type 0 slip #1 - PB-22 Laid down, 449 tons needed, 249 tons used, 200 tons added
Type 0 slip #2 - PB-23 Laid down, 449 tons needed, 249 tons used, 200 tons added


Izmit

Type 3 drydock #1 - Idle
Type 2 slip #1- Idle
Type 1 drydock #1 - Idle
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle

CL Istambul building 6,943 tons needed, 6,326 tons used, 617 tons added

Samsun

Type 3 drydock #1 - Idle
Type 1 drydock #1 - Idle
Type 0 drydock #2 - Idle


Icel

Type 1 slip #1 - PB-24 Laid down, 449 tons needed, 249 tons used, 200 tons added
Type 1 slip #2 - PB-25 Laid down, 449 tons needed, 249 tons used, 200 tons added
Type 3 drydock #1 under construction, 4.0 points needed, 3.8 points used, 0.1 points added
Type 0 slip #1 - under construction, 0.5 Ip's needed, 0.4 IP used, 0.1 IP added
Type 0 drydock #1 - Idle


Trabzon

Type 1 drydock #1 - Idle


Launched ships being completed:

None

Ships completed/transfered and on trials

PB-14 through 17 complete trials
PB-18 through 21 on trials

Summary of ship building/repairs/rebuilds and convertions.

CL Istambul building (617 tons)
4xPB-14 class Patrol boats building (800 tons)

D. Transactions

0.2 IP's to India

E. Other Notes

None

F. Updated Order of Battle, 1/1/34

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 2(0)1 * Mahmudieh building in India
BC: 1(0)0
PD: 2(0)0
AC: 1(0)0
CA: 1(0)0
PC: 2(0)0
CL: 5(0)1
DD: 25(0)0
Torpedo boats: 28(0)0
Sloops: 1(0)0
Frigates: 0(0)0
Moniters:0(0)0
Torpedo gunboats: 2(0)0
Gunboats 8(0)0
Patrol vessels 20(0)4
MTB's: 18(0)0
Mine sweepers 6(0)0
Minelayers 3(0)0
Mine warfare ships 4(0)0
Sub chasers 36(0)0
Motor Launches 39(0)0
Motor Launche/minlayers 10(0)0
Fleet Submarine: 0(0)0
Coastal Submarine:0(0)0
Floatplane carrier/tenders 0(0)0
destroyer depot ships 2(0)0
Submarine depot ships 0(0)0
Auxillary's N/A