You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, November 13th 2011, 1:17am

Chile, Q3/1941



[SIZE=3]Industrial Allocation[/SIZE]
- 9/9 factories producing 9,000t materials.
- 6,617t from stockpile.
- 1,000 tons from transactions
- 0 tons from scrapping
- 16,617t materials total.
- 13,481t used.
- 3136t stored for Q4/41.
- 0/9 factories dedicated to infrastructure.

[SIZE=3]Infrastructure Development[/SIZE]
None at present

[SIZE=3]Naval Construction[/SIZE]
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: BB-10 Capitan Prat undergoing minor refit beginning January 1st, 1941. 1,500 tons added Q3/1941 for a total of 4500/4856 tons. 356/4856 tons remaining until completion on November 11th, 1941.
S3.5: BC-11 O'Higgins laid down August 1st, 1941. 1,600 tons added Q3/41 for a total of 1,600/28,385 tons. 26,785/28,385 tons remaining until completion on April 3rd, 1944. Launched June 19th, 1941.
D2.5: CLAA-13 Chillán undergoing 50% reconstruction beginning January 1st, 1941. 722 tons added Q3/41 for a total of 3,322/3,322 tons. 0/3,322 tons remaining until completion on August 25th, 1941.
D2: DD-56 Voluntario undergoing partial reconstruction. 350 tons added Q3/1941 for a total of 350/350 tons. 0/350 tons remaining until completion. Reconstruction completed.
S2: CLD-18 Punta Gruesa (Battle-class destroyer leader) laid down July 1st, 1941. 900 tons added Q3/41 for a total of 900/3,575 tons. 2,675/3,575 tons remaining. Ship will launch on December 1st 1941. and complete on July 18th, 1942.
S1: Idle
D0: Idle

Dockside:
- BC-09 Almirante Blanco Encalada laid down January 1st, 1940. 3,000 tons added Q3/41 for a total of 15,500/28,385 tons. 12,413/28,385 tons remaining until completion on April 3rd, 1944. Launched June 19th, 1941.
- CL-14 Magallanes laid down January 1st, 1940. 1,710 tons added Q3/41 for a total of 12,000/12,000 tons. 0/12,000 tons remaining until completion. Ship launched August 15, 1940 and completed on September 3, 1941.
- CLD-16 Angamos (Battle-class destroyer leader) laid down July 1st, 1940. 0 tons added Q3/41 for a total of 3,575/3,575 tons. 0/3,575 tons remaining. Ship launched on December 1st 1940. and completed on July 18th, 1941.
- CLD-17 Iquique (Battle-class destroyer leader) laid down October 1st, 1940. 875 tons added Q3/41 for a total of 3,575/3,575 tons. 0/3,575 tons remaining until completion on October 18th, 1941. Ship launched on March 1st 1941.
- DD-40 Capitan Rodríguez undergoing minor refit. 84 tons added Q3/1941 for a total of 84/84 tons. 0/84 tons remaining until completion. Refit completed.
- DD-41 General Mackenna undergoing minor refit. 84 tons added Q3/1941 for a total of 84/84 tons. 0/84 tons remaining until completion. Refit completed.

ASMAR - Astillero de Valparaíso (Valparaiso):
S1: LSI(M)-02 Presidente Errazuriz laid down July 1st, 1941. 550 tons added Q3/41 for total of 550/2650; 2100/2650 tons remaining until completion on May 15th, 1942. Ship will launch on December 21st, 1941.
S1: Idle
D1: DD-46 Magnífico undergoing partial reconstruction. 344 tons added Q3/1941 for a total of 344/344 tons. 0/344 tons remaining until completion. Reconstruction completed.

Dockside:
- LSI(M)-01 Ministro Zentento laid down January 1st, 1941. 700 tons added Q3/41 for a total of 2100/2650 tons. 550/2650 tons remaining until completion on December 21st, 1941. Ship launched on May 21st, 1941.
- Landing Ship Tank Chacabuco laid down January 1st, 1941. 275 tons added Q3/41 for a total of 825/1039 tons. 214/1039 tons remaining until completion on November 14th, 1941. Ship launched on May 6th, 1941.

ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Idle
S0: YTB-08 Lago Jeinimeni laid down April 1st, 1941. 300 tons added Q3/41 for a total of 600/1000 tons. 400/1000 tons remaining until completion on January 18th, 1942. Ship launched on July 26th, 1941.

Dockside:
- YTB-07 Valle de la Luna laid down January 1st, 1941. 300 tons added Q3/41 for a total of 900/1000 tons. 100/1000 tons remaining until completion on October 18th, 1941. Ship launched on April 26th, 1941.

ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle

Dockside:
None

from factories:
- 37 tons for 130mm automatic DP gun on test stand (coast defense AA mounting)

On Trials
- CLAA Chillán begins three months of post-reconstruction trials.
- CL Magellanes begins six months of builders trials.
- CLD Angamos begins six months of builders trials.
- BMS Almirante José Toribio Merino Saavedra continues builders trials.

[SIZE=3]Transactions[/SIZE]
- 1,000 tons from Argentina for battleship Almirante Gideon.

[SIZE=3]Other Notes[/SIZE]
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date not set. Project is in study stages at Sisdef.
- "Coati": Target date of mid-1944 set. Project is in initial study stages at Sisdef.
- "Pudu": Project is in production at Sisdef and FAMAE.

[SIZE=3]Order of Battle (Armada de Chile) September 30th, 1941[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Dreadnought Battleships:............2(0)+0
Dreadnought Battlecruisers:........0(1)+2
Coast Defense Ships:.................0(0)+0
Aircraft Carriers:........................3(0)+0
Armoured Cruisers:....................1(0)+0
Heavy Cruiser:...........................1(0)+0
Light Cruisers:...........................8(0)+0
Floatplane Cruisers:...................1(0)+0
Destroyer Leaders:.....................1(0)+2 {3,000 tons std and up}
Destroyers:...............................34(0)+0 {1,200-3,000 tons std}
Destroyer Escorts:.....................16(0)+0
Light Destroyers:.......................8(0)+0 {under 1,200 tons std}
Torpedo Boats:.........................1(0)+0
Submarines:.............................10(0)+0
Floatplane Carriers:...................2(0)+0
Subchasers:.............................24(0)+0
Minesweepers:.........................16(0)+0
Arctic Patrol Vessel:..................2(0)+0

Fleet Train:
Destroyer Tenders:...................4(0)+0
Subchaser Tenders:..................2(0)+0
Submarine Tenders:..................1(0)+0
General Fleet Tenders:..............4(0)+0
Fleet Oilers:.............................12(0)+0
Colliers:...................................1(0)+0

Auxiliaries:
Sail Training Sloop:..................2(0)+0
Attack Transports:....................4(0)+0
Transports:..............................2(0)+0
Fleet Tugs:..............................2(0)+2
Light Harbour Tugs:..................4(0)+0
Netlayers:...............................2(0)+0
Oceanic Research Ship:.............1(0)+0
Pilot Boats:..............................6(0)+0
Training Yawls:........................6(0)+0

Amphibious Forces:
Landing Ship Vehicle:.................1(0)+0
Beach Discharge Lighter:............1(0)+0
Attack Transports:.....................4(0)+0
Landing Ship Infantry (Med):.......0(0)+2
Landing Ship Tank:....................1(0)+1
Landing Craft Tank:...................0(0)+0
Landing Craft Mechanized:.........11(0)+0
Landing Craft Assault:................54(0)+0

Emergency Use:
Patrol Boats:............................4(0)+0
Transports:..............................2(0)+0
Museum Ships:.........................1(0)+0

Foreign Orders and Exports (Totals):
Fleet Tugs:...............................6(0)+0 (to China)
Light Harbour Tugs:..................20(0)+0 (to China)

[SIZE=3]Summary[/SIZE]
The battlecruiser Capitan Prat continues her modernization of her dradis, fire-control, and AA suite. The battlecruiser Almirante Blanco Encalada, recently launched, continues construction at the dockside, and her sistership O'Higgins is laid down in the vacated slip. The light cruiser Magallanes is completed and begins trials, as does the destroyer leader Angamos. Construction on the destroyer leader Iquique draws close to completion, while her sistership Punta Gruesa begins.