You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, November 11th 2011, 8:55pm

France, Q3/1941

[SIZE=5]Report for Q3/1941[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 27/27 factories producing 27,000t materials.
- 0/27 factories producing infrastructure
- 5,441t from stockpile.
- 0t from transactions.
- 1724t from scrapping.
- 34,165t materials total.
- 29,626t used.
- 4,539t stored for Q4/41.

[SIZE=3]Infrastructure Development [/SIZE]
N/A

[SIZE=3]Naval Construction [/SIZE]

At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1941 for a total of 9000 / 33000 tons. 24000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 4 Slip #1 - Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1941 for a total of 9000 / 33000 tons. 24000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Dockside:
- Curaissier Libertie laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q3/1941 for a total of 45000 / 45986. 986 / 45986 tons remaining. Launched Q2/1940.
- Curaissier Justice laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q3/1941 for a total of 45000 / 45986. 986 / 45986 tons remaining. Launched Q2/1940.
- Heavy Cruiser Téméraire laid down January 1940. 17,079 tons required. 2100 tons added Q3/1941 for total of 14700 / 17,079 tons. 2379 / 17079 tons remaining until completion.
- Contre-Torpillieur Surcouf (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Kersaint (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Cassard (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Bouvet (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Sabre (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
- Contre-Torpillieur Baliste (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
- Coastal Oiler Malakoff converted from merchantman. 100 tons required. 100 tons added in Q3/41 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.
- Coastal Oiler Le Kremlin-Bicêtre converted from merchantman. 100 tons required. 100 tons added in Q3/41 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.
- Transport Tuyen Quang converted from merchantman into troopship. 211 tons required. 211 tons added in Q3/41 for a total of 211 / 211 tons. 0 / 211 tons remaining; conversion completes.
- Salvage Tug Cassiopee acquired as naval auxiliary. 223 tons required. 223 tons added in Q3/41 for a total of 223 / 223 tons. 0 / 223 tons remaining; conversion completes.
- Minesweeper Pâquerette laid down October 1, 1940. 578 tons required. 0 tons added in Q3/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q3/1941.
- Minesweeper Jasmine laid down October 1, 1940. 578 tons required. 0 tons added in Q3/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q3/1941.

At Brest (Cl 5)
Class 3 Drydock #1 - Contre-Torpillieur Sagaie (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 2 Drydock #1 - Contre-Torpillieur Casque (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 1 Drydock #1 - Falcon-class submarine Falcon #11 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.

At Abidjan (Cl 5)
Class 3 Drydock #1 - Falcon-class submarine Falcon #12 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 1 Drydock #1 - Falcon-class submarine Falcon #13 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.

At Marseilles (Cl 5)
Class 4 Drydock #1 - Falcon-class submarine Falcon #14 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #15 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #16 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #17 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #18 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - TCD-1 Châteaurenault laid down January 1st, 1941. 7,539 tons required. 1,500 tons added in Q3/1941 for a total of 4500 / 7539. 3039 / 7539 tons remaining until completion on May 17th, 1942.
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Contre-Torpillieur Bouclier (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 1 Slip #2 - Contre-Torpillieur Rapière (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 1 Drydock #1 - Falcon-class submarine Falcon #19 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 0 Drydock #1 - Falcon-class submarine Falcon #20 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.

Dockside:
- Aircraft Carrier Bucentaure laid down Q1/39. 35,000 tons required. 1000 tons added Q3/1941 for total of 31000 / 35000 tons. 4,000 / 35000 tons remaining until completion.
- Contre-Torpillieur Dehorter (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
- Contre-Torpillieur Javeline (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.

At Oran (Cl 5)
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Tunis (Cl 5)
Class 4 Drydock #1 - Vehicle Landing Ship Condorcet undergoing 25% reconstruction beginning June 1st 1941. 1319 tons required. 90 tons added in Q3/1941 for a total of 900 / 1319. 419 / 1319 tons remaining.
Class 3 Slip #1 - Four EDA-55 landing craft laid down end-to-end June 1st, 1941. 55 tons added to each for a total of 220 tons. Launched June 30th, 1941.
Class 1 drydock #1 - Four EA-13 landing craft laid down end-to-end June 1st, 1941. 13 tons added to each for a total of 65 tons. Launched June 30th, 1941.

Dockside:
- Aircraft Carrier Conquérant laid down Q2/39. 35,000 tons required. 3000 tons added Q3/1941 for total of 30000 / 35000 tons. 5000 / 35000 tons remaining until completion.

At Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

Dockside:
- None

At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle
Class 1 Drydock - Idle
Class 1 Drydock #1 - Idle

Dockside:
- None

At Saigon (Cl 5)
Class 4 Drydock #1 - Vehicle Landing Ship Montebello undergoing 25% reconstruction beginning April 30th 1941. 1319 tons required. 419 tons added in Q3/1941 for a total of 1319 / 1319. 0 / 1319 tons remaining.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - EA-13 landing craft laid down June 1st; 13 tons added Q3/41. Completed June 30th, 1941, launched.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down June 1st; 8 tons added Q3/41. Completed June 30th, 1941, launched. Vedette FOM 11m laid down June 1st; 12 tons added Q3/41. Completed June 30th, 1941, launched.
Class 0 Slip #2 - Two craft laid down end to end. CDIC-200 C1 laid down June 1st; 185 tons added Q3/1941. Completed June 30th and launched. CDIC-200 C2 laid down June 1st; 185 tons added Q3/1941. Completed June 30th and launched.

Dockside:
- None

Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle

Dockside:
- None

At Papeete (Cl 3)
Class 3.5 Drydock - Idle

Dockside:
- None

On Trials:
- CV Ocean until Q3/41.

[SIZE=3]From Factories[/SIZE]
N/A

[SIZE=3]Transactions [/SIZE]
- 95 tons for purchase of five Barracuda-class sailing yawls, 19 tons each. Two vessels gifted to Greece; remaining three used by French Navy.
- 248 tons for construction of triple 20cm turret to test automation machinery.

[SIZE=3]Other Notes [/SIZE]
The battleships Libertie and Justice have been launched by the naval yards in La Rochelle and are now under construction at the pierside.

[SIZE=3]Ships being scrapped [/SIZE]
- 10 Falcon-class submarines (66 tons per ship in Q3/41)

- Total tonnage in recycling until Q3/1941: (5x8)+(20x20)+(7x100)+(4x146) = 1,724 tons
- Total tonnage in recycling until Q4/1941: (7x8)+(4x20) = 136 tons
- Total tonnage in recycling until Q1/1942: (10x66) = 660
- Total tonnage in recycling until Q2/1942: (10x66) = 660

[SIZE=3]Updated Order of Battle, End of Q3/1941[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction

The Fleet
Battleships: 7(0)+2
Battlecruisers: 4(0)+0
Aircraft Carriers:6(0)+4
Heavy Cruisers: 13(0)+1
Light Cruisers: 30(0)+0
Coast Defense Ships: 5(0)+0
Destroyers: 76(0)+12
Sloops: 8(0)+0
Fleet Submarines: 39(0)+0
Coastal Submarines: 74(0)+0
Motor Torpedo Boats: 12(0)+0
River Gunboats: 34 (0)+0
Vedettes: 6(0)+0
Minesweepers: 28(0)+0

Fleet Train
Fast Oilers: 8(0)+0
Slow Oilers: 2(0)+0
Gasoline Tankers: 2(0)+0
Fleet Tenders: 0(0)+0
Repair Ships: 1(0)+0
Ammunition Ships: 0(0)+0

Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Transports: 0(0)+0
Fleet Tugs: 3(0)+0
Light Harbour Tugs: 0(0)+0
Netlayers: 0(0)+0
Oceanic Research Ship: 2(0)+0

Amphibious Forces:
Dock Landing Ship: 0(0)+1
Vehicle Landing Ship: 1(1)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 2(0)+0
Tank Landing Craft (EDA): 9(0)+0
Infantry Assault Craft (EA): 9(0)+0