[SIZE=5]Report for Q3/1941[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 27/27 factories producing 27,000t materials.
- 0/27 factories producing infrastructure
- 5,441t from stockpile.
- 0t from transactions.
- 1724t from scrapping.
- 34,165t materials total.
- 29,626t used.
- 4,539t stored for Q4/41.
[SIZE=3]Infrastructure Development [/SIZE]
N/A
[SIZE=3]Naval Construction [/SIZE]
At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1941 for a total of 9000 / 33000 tons. 24000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 4 Slip #1 - Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1941 for a total of 9000 / 33000 tons. 24000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Dockside:
- Curaissier Libertie laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q3/1941 for a total of 45000 / 45986. 986 / 45986 tons remaining. Launched Q2/1940.
- Curaissier Justice laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q3/1941 for a total of 45000 / 45986. 986 / 45986 tons remaining. Launched Q2/1940.
- Heavy Cruiser Téméraire laid down January 1940. 17,079 tons required. 2100 tons added Q3/1941 for total of 14700 / 17,079 tons. 2379 / 17079 tons remaining until completion.
- Contre-Torpillieur Surcouf (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Kersaint (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Cassard (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Bouvet (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q3/1941 for a total of 2100 / 2669 tons. 569 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
- Contre-Torpillieur Sabre (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
- Contre-Torpillieur Baliste (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
- Coastal Oiler Malakoff converted from merchantman. 100 tons required. 100 tons added in Q3/41 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.
- Coastal Oiler Le Kremlin-Bicêtre converted from merchantman. 100 tons required. 100 tons added in Q3/41 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.
- Transport Tuyen Quang converted from merchantman into troopship. 211 tons required. 211 tons added in Q3/41 for a total of 211 / 211 tons. 0 / 211 tons remaining; conversion completes.
- Salvage Tug Cassiopee acquired as naval auxiliary. 223 tons required. 223 tons added in Q3/41 for a total of 223 / 223 tons. 0 / 223 tons remaining; conversion completes.
- Minesweeper Pâquerette laid down October 1, 1940. 578 tons required. 0 tons added in Q3/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q3/1941.
- Minesweeper Jasmine laid down October 1, 1940. 578 tons required. 0 tons added in Q3/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q3/1941.
At Brest (Cl 5)
Class 3 Drydock #1 - Contre-Torpillieur Sagaie (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 2 Drydock #1 - Contre-Torpillieur Casque (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 1 Drydock #1 - Falcon-class submarine Falcon #11 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
At Abidjan (Cl 5)
Class 3 Drydock #1 - Falcon-class submarine Falcon #12 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 1 Drydock #1 - Falcon-class submarine Falcon #13 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
At Marseilles (Cl 5)
Class 4 Drydock #1 - Falcon-class submarine Falcon #14 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #15 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #16 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #17 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #18 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - TCD-1 Châteaurenault laid down January 1st, 1941. 7,539 tons required. 1,500 tons added in Q3/1941 for a total of 4500 / 7539. 3039 / 7539 tons remaining until completion on May 17th, 1942.
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Contre-Torpillieur Bouclier (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 1 Slip #2 - Contre-Torpillieur Rapière (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
Class 1 Drydock #1 - Falcon-class submarine Falcon #19 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 0 Drydock #1 - Falcon-class submarine Falcon #20 scrapping. 1.78 months to scrap. 66 tons recovered Q3/41 for total of 66/66 tons recovered. 0 tons remaining.
Dockside:
- Aircraft Carrier Bucentaure laid down Q1/39. 35,000 tons required. 1000 tons added Q3/1941 for total of 31000 / 35000 tons. 4,000 / 35000 tons remaining until completion.
- Contre-Torpillieur Dehorter (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
- Contre-Torpillieur Javeline (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q3/1941 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
At Oran (Cl 5)
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Tunis (Cl 5)
Class 4 Drydock #1 - Vehicle Landing Ship Condorcet undergoing 25% reconstruction beginning June 1st 1941. 1319 tons required. 90 tons added in Q3/1941 for a total of 900 / 1319. 419 / 1319 tons remaining.
Class 3 Slip #1 - Four EDA-55 landing craft laid down end-to-end June 1st, 1941. 55 tons added to each for a total of 220 tons. Launched June 30th, 1941.
Class 1 drydock #1 - Four EA-13 landing craft laid down end-to-end June 1st, 1941. 13 tons added to each for a total of 65 tons. Launched June 30th, 1941.
Dockside:
- Aircraft Carrier Conquérant laid down Q2/39. 35,000 tons required. 3000 tons added Q3/1941 for total of 30000 / 35000 tons. 5000 / 35000 tons remaining until completion.
At Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Dockside:
- None
At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle
Class 1 Drydock - Idle
Class 1 Drydock #1 - Idle
Dockside:
- None
At Saigon (Cl 5)
Class 4 Drydock #1 - Vehicle Landing Ship Montebello undergoing 25% reconstruction beginning April 30th 1941. 1319 tons required. 419 tons added in Q3/1941 for a total of 1319 / 1319. 0 / 1319 tons remaining.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - EA-13 landing craft laid down June 1st; 13 tons added Q3/41. Completed June 30th, 1941, launched.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down June 1st; 8 tons added Q3/41. Completed June 30th, 1941, launched. Vedette FOM 11m laid down June 1st; 12 tons added Q3/41. Completed June 30th, 1941, launched.
Class 0 Slip #2 - Two craft laid down end to end. CDIC-200 C1 laid down June 1st; 185 tons added Q3/1941. Completed June 30th and launched. CDIC-200 C2 laid down June 1st; 185 tons added Q3/1941. Completed June 30th and launched.
Dockside:
- None
Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle
At New Caledonia (Cl 5)
Class 4 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Dockside:
- None
At Papeete (Cl 3)
Class 3.5 Drydock - Idle
Dockside:
- None
On Trials:
- CV Ocean until Q3/41.
[SIZE=3]From Factories[/SIZE]
N/A
[SIZE=3]Transactions [/SIZE]
- 95 tons for purchase of five Barracuda-class sailing yawls, 19 tons each. Two vessels gifted to Greece; remaining three used by French Navy.
- 248 tons for construction of triple 20cm turret to test automation machinery.
[SIZE=3]Other Notes [/SIZE]
The battleships Libertie and Justice have been launched by the naval yards in La Rochelle and are now under construction at the pierside.
[SIZE=3]Ships being scrapped [/SIZE]
- 10 Falcon-class submarines (66 tons per ship in Q3/41)
- Total tonnage in recycling until Q3/1941: (5x8)+(20x20)+(7x100)+(4x146) = 1,724 tons
- Total tonnage in recycling until Q4/1941: (7x8)+(4x20) = 136 tons
- Total tonnage in recycling until Q1/1942: (10x66) = 660
- Total tonnage in recycling until Q2/1942: (10x66) = 660
[SIZE=3]Updated Order of Battle, End of Q3/1941[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction
The Fleet
Battleships: 7(0)+2
Battlecruisers: 4(0)+0
Aircraft Carriers:6(0)+4
Heavy Cruisers: 13(0)+1
Light Cruisers: 30(0)+0
Coast Defense Ships: 5(0)+0
Destroyers: 76(0)+12
Sloops: 8(0)+0
Fleet Submarines: 39(0)+0
Coastal Submarines: 74(0)+0
Motor Torpedo Boats: 12(0)+0
River Gunboats: 34 (0)+0
Vedettes: 6(0)+0
Minesweepers: 28(0)+0
Fleet Train
Fast Oilers: 8(0)+0
Slow Oilers: 2(0)+0
Gasoline Tankers: 2(0)+0
Fleet Tenders: 0(0)+0
Repair Ships: 1(0)+0
Ammunition Ships: 0(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Transports: 0(0)+0
Fleet Tugs: 3(0)+0
Light Harbour Tugs: 0(0)+0
Netlayers: 0(0)+0
Oceanic Research Ship: 2(0)+0
Amphibious Forces:
Dock Landing Ship: 0(0)+1
Vehicle Landing Ship: 1(1)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 2(0)+0
Tank Landing Craft (EDA): 9(0)+0
Infantry Assault Craft (EA): 9(0)+0