Iberian Naval Developments Q3 1945
TL;DR
New Construction: 1 CL, 1 APA, 2 LCT, 2 ATH, 1 AN, 16 LCM
New Scrapping: N/A
New Refits: 1 CV (25%), 1 CL (5%)
A. Industrial Allocation
20/24 factories producing materiel for shipbuilding = 20,000 tons + 4,993 t surplus + 1,856 t scrap = 26,849 t
Material Used: 24,513 t
Stockpiled Material: 2,336 t
4/24 factories (fixed) producing infrastructure materiel = 0.4 IP
0/24 factories producing infrastructure materiel = 0.0 IP
B. Infrastructure Development
Type 0 floating drydock underway at Haikou, San Hainando: Receives 0.1 IP for 0.3 IP of 0.5 required
Type 0 floating drydock underway at Haikou, San Hainando: Receives 0.1 IP for 0.3 IP of 0.5 required
Type 1 floating drydock underway at Haikou, San Hainando: Receives 0.2 IP for 0.6 IP of 1.0 required
C. Naval Construction
At Cadiz
No.1 type 5 slip: Idle
No.2 type 4 slip: Idle
No.3 type 3 slip: Idle
No.4 type 2 slip: Idle
No.5 type 2 slip: Idle
No.6 type 2 slip: Idle
No.1 type 4 drydock: Idle
No.2 type 3 drydock: Idle
Dockside: BB Saturn receives 2,541 t, to complete 11/45
Dockside: BB Jupiter receives 1,515 t, completed 8/45
Dockside: LSD Arlaban receives 1,573 t, completed 8/45
Dockside: LSD Gravelines receives 1,200 t, to complete 11/45
Dockside: LSD Vittoria receives 1,200 t, to complete 2/46
Dockside DD D-180 receives 160 t, to complete 10/45
At Barreiro
No.1 type 4 slip: CV Lisbon receives 2,400 t, to complete 12/48
No.2 type 3 slip: Idle
No.3 type 3 slip: CL Sable laid down, receives 1,227 t, to complete 9/46
No.4 type 1 slip: Idle
No.5 type 1 slip: Idle
No.6 type 1 slip: Idle
No.1 type 5 drydock: AC Nina completes scrapping
No.2 type 3 drydock: CV Cordoba begins 25% refit, receives 2,500 t, to completes refit 12/45
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle
Dockside: CA El Oso receives 1,932 t, to complete 11/45
Dockside: SS Sf-1 receives 400 t, to complete 10/45
At Porto
No.1 type 4 slip: Idle
No.2 type 3 slip: CL Arcabuz receives 1,227 t, launched, to complete 6/46
No.3 type 3 slip: APA Isidoro de Sevilla laid down to civilian standards, receives 300 t, to complete 9/46
No.4 type 0 slip: Idle
No.5 type 0 slip: Idle
No.6 type 0 slip: Idle
No.7 type 0 slip: Idle
Dockside: CL Accio undergoes 5% refit, receives 388 t
Dockside: APA San Longino receives 300 t, to complete 3/46
At La Coruna
No.1 type 2 slip: APA Cornelio el Centurion receives 300 t, launched, to complete 6/46
No.2 type 1 slip: Idle
No.3 type 0 slip: Idle
No.4 type 0 slip: Idle
No.5 type 0 slip: LCT L-33 laid down, receives 277 t, launched, to complete 11/45
No.6 type 0 slip: LCT L-34 laid down, receives 277 t, launched, to complete 11/45
No.1 type 2 drydock: Idle
No.2 type 1 drydock: Idle
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle
Dockside: LCT L-31 receives 0 t, completed 8/45
Dockside: LCT L-32 receives 0 t, completed 8/45
At Santander
No.1 type 4 slip: Idle
No.2 type 2 slip: Idle
No.3 type 1 slip: Idle
No.4 type 1 slip: Idle
No.5 type 1 slip: Idle
No.6 type 1 slip: Idle
No.1 type 2 drydock: Idle
Dockside: CL Chafarote receives 1,228 t, completed 9/45
Dockside: CL Alabarda receives 1,228 t, completed 9/45
Dockside: AR Reconstructor receives 200 t, completed 8/45
At Santiago De Cuba, Cuba
No.1 type 2 slip: Idle
No.2 type 1 slip: AN N-14 laid down, receives 500 t, to complete 4/46
No.3 type 1 slip: AN N-13 receives 0 t, launched, to complete 1/46
No.1 type 4 drydock: Idle
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle
Dockside: AN N-12 receives 0 t, to complete 10/45
Dockside: AN N-11 receives 0 t, completed 7/45
At San Lorenzo, Honduras
No.1 type 4 drydock: Idle
No.2 type 1 drydock: Idle
At Panama, Panama
No.1 type 2 slip: Idle
No.2 type 1 slip: ATH-27 laid down, receives 400 t, launched, to complete 11/45
No.3 type 1 slip: ATH-28 laid down, receives 400 t, launched, to complete 11/45
No.4 type 1 slip: Idle
No.5 type 1 slip: Idle
No.1 type 4 drydock:
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle
Dockside: ATH H-25 receives 0 t, completed 8/45
Dockside: ATH H-26 receives 0 t, completed 8/45
At Luanda, Angola
No.1 type 1 slip: Idle
No.2 type 1 slip: Idle
No.3 type 1 slip: Idle
No.4 type 1 slip: Idle
No.1 type 4 drydock: Idle
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle
At Haikou, San Hainando
No.1 type 4 drydock: Idle
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle
Other Construction
16 x LCM built, total cost 400 t
D. Transactions
Nothing
E. Other Notes
None
F. Order of Battle
Note: W (X) +Y = In Service (under repair/refit) + building
Combattants
CV = 7 (1) + 1
BB = 12 (0) + 1
BC = 02 (0) + 0
CE = 04 (0) + 0
CA = 13(0) + 1
CL = 43 (0) + 2
DD = 97 (0) + 1
SS = 146(0) + 1
Patrol, Escort and Mine Warfare
Sloop (SL) = 112 (0) + 0
Corvette (CO) = 120 (0) + 0
Mine Warfare Ship (MWS) = 32 (0) + 0
Light Forces
MTB: 300 (0) + 0
MGB: 300 (0) + 0
Ampibious Forces
Landing ship (Dock): 1(0) + 2
Troopship (LSI): 6 (0) + 3
Tank Landing Ship (LST): 6(0) + 0
Tank Landing Craft (LCT): 30(0) + 2
Landing Craft Medium (LCM): 96(0) + 0
Landing Craft (LCI): 72 (0) + 0
Assault Boat (LCA): 48 (0) + 0
Fleet Train
Depot Ships (AD): 11(0) + 0
Hospital Ship (AH): 2 (0) + 0
Netlayer (AN): 11(0) + 3
Oiler (AO): 13(0) + 0
Repair Ship (AR): 1(0) + 1
Sealift Vessel (ASL): 2 (0) + 0
Harbour Tug (ATH): 26(0) + 2