You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, January 8th 2006, 2:43pm

Germany Q3, 1929

German Naval Developments – Q3/29, subject to update

A. Industrial Allocation

Factory Allocation:

Warship Material: 3
Infrastructure (Committed): 23 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 0

Warship Material Produced: 3000 t
Stockpile: 4781 t
Recycled Scrap: 426 t
Material Used on Construction: 5470 t
Received from sales: 838 t (Turkey)
New Stockpile: 3575 t

B. Infrastructure Development

Factory 27 receives 1 point, for 3 total.
Factory 28 receives 1 point, for 3 total.
Type 3 slipway at Kiel upgrade to Type 4 receives 0.3 pts, for 0.6 total.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: PD Hessen conversion to target vessel receives 3000t
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle

At Bremerhaven

1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle

At Cuxhaven

1 Type 3 slip: CL Ersatz Amazone receives 1400t, launched
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: Idle

At Kiel

1 Type 3 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slips: Idle
1 Type 0 slip: Idel
1 Type 0 drydock: Idle
Free-floating: CL Ersatz Medusa receives 1070t, complete, commissioned as CL Liepzig

D. Transactions
PD Hanover begins conversion to target vessel

E. Other Notes
CL Liepzig begins her shakedown cruise

S-1, S-2, S-3, S-4 continue their shakedown cruises.

F. Updated Order of Battle, 30/9/29

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 1(0)+0
CL: 12(0)+1,
DD: 18(0)+0,
SL: 6(0)+0
AM: 10(0)+0
TB: 4(0)+0

Note: PD = pre-dreadnought