You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, February 4th 2006, 11:29pm

Denmark, Quarter 1, 1929

Danish Naval Developments Q1 1929

a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts
0/11 Factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Factory No.11 Completed last qtr. Now in production.
Slip No.3 (Type 0) at Aalborg extending to Type 1 recieves 0.1 IP = Total 0.1 IP
Slip No.4 (Type 0) at Aalborg extending to Type 1 recieves 0.1 IP = Total 0.1 IP

c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Idle
No.2 type 2 slip – Brynhildr, CL, laid down 01/07/28, receives 1,064 tons, balance 2,560 tons
No.3 type 1 slip – Rose, SL, laid down 02/01/29, receives 349 tons, balance 835 tons
No.4 type 1 slip – Lily, SL, laid down 02/01/29, receives 349 tons, balance 835 tons
No.1 type 2 drydock – Idle
Dock side – Vali, BB, laid down 15/01/27, receives 2005 tons, balance 6,936 tons
Dock side – Broholmer, DD, laid down 02/04/28, receives 222 tons to complete

Aarhus-
No.1 type 3 slip –
No.2 type 2 slip – Sigrdrifa, CL, laid down 02/01/29, receives 1170 tons, balance 4582 tons
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
Dock side – Tyr, BB, laid down 02/01/27, receives 2005 tons, balance 6936 tons
Dock side – Granddanois, DD, laid down 02/04/28, receives 222 tons to complete

Aalborg-
No.1 type 1 slip – Violet, SL, laid down 02/01/29, receives 349 tons, balance 835 tons
No.2 type 1 slip – Daisy, SL, laid down 02/01/29, receives 349 tons, balance 835 tons
No.3 type 0 slip – Extending
No.4 type 0 slip - Extending
Dock side – Falk, DD, laid down 02/04/28, receives 354 tons to complete
Dock side – Hog, DD, laid down 02/04/28, receives 354 tons to complete

Bangkok-
No.1 type 1 slip – Idle
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side – Fiskeorn, DD, laid down 02/04/28, receives 354 tons to complete

d/ Transactions
None

e/ Other Notes

KDM Tyrhund commissions on 08/02/29
KDM Vognmand continues sea trials until 18/04/1929
KDM Broholmer commences sea trials on 12/02/209
KDM Granddanois commences sea trials on 12/02/209
KDM Falk commences sea trials on 25/02/29
KDM Hog commences sea trials on 25/02/29
KDM Fiskeorn commences sea trials on 25/02/29

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 766 tons

f/ Order of Battle
Note: X(Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 01 (0) + 2/0 (0)
AC = 00 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 0/0 (0)
CL = 11 (0) + 4/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 22 (0) + 4/0 (0)
SL = 03 (0) + 4/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 13 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 07 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)