You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, January 21st 2007, 11:03pm

Canada, Eh? Q3/33

Candian Industrial Report  Q3/ 1933
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 0t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10000t
__________________________________

Infrastructure Development
None.
__________________________________

Naval Construction
HMCS Canada recieves 4500 tons.
HMCS Excelsior recieves 4500 tons.
The Empire of Atlantis recieves 1000 tons.
__________________________________

Esquimault, British Columbia (Messrs. Yarrow Ltd. at Lang's Cove)
Type 1 Slip: Idle
Type 0 Slip: Idle
Type 0 Slip: Idle
Type 4 Drydock: Idle

Montreal, Quebec (Versatile Vickers [Canadian Vickers])
Type 2 Slip: Idle
Type 2 Slip: Idle
Type 2 Slip: Idle
Type 0 Slip: Idle
Type 3 Drydock: HMCS Canada 15,316/40,319 40/49 months remaining
Type 2 Drydock: Idle
Type 2 Drydock: Idle
Dockside: HMCS Nova Scotia Shakedown
Dockside: HMCS New Brunswick Shakedown



Quebec City, Quebec
Type 4 Drydock: Idle

Halifax, Nova Scotia (Halifax Royal Naval Dockyard)
Type 3 Drydock: HMCS Excelsior 15,316/40,319 40/49 months remaining
Type 0 Drydock: Idle

Saint John, New Brunswick
Type 1 drydock: Idle

__________________________________

Transactions

1000 tons transferred to Atlantis: Payments complete

__________________________________

Other Notes

7.5"/55 (19 cm) QF Mark VII Project ongoing at Canadian Vickers

9.2"/55 (23.4 cm) Mark XIV Project ongoing at ShinRa Munitions.

2

Sunday, January 21st 2007, 11:17pm

Quoted

HMCS Canada recieves 4500 tons.


How?

Max of 3000tons per quarter can be built into a ship.

3

Monday, January 22nd 2007, 12:24am

Possibly a typo? Then again both BB's recieve the same tonnage.

4

Monday, January 22nd 2007, 4:21am

I've been doing my reports on a more simplified basis;

Due to mandatory build times, it doesn't matter how much material I put into the ships, I can't get them finished any sooner. The material listed on the my reports is what's been produced and allocated to the ship(s), with the actual installation happening throughout the mandatory building time. Doing it this way makes it easier to keep track of when I've got enough material produced for each ship, and move on to the next building program.