Iberian Naval Developments Q2 1933
a/ Industrial Allocation
14/24 factories producing materiel for shipbuilding =14000 tons
10/24 factories (fixed) producing infrastructure materiel =1.0 pts
00/24 factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Transfer of 0.3 pts to Denmark for development of naval infrastructure
Transfer of 0.3 pts to Peru for development of naval infrastructure
0.4 pts diverted to I.C.E.
c/ Naval Construction
Cadiz-
No.1 type 5 slip - San Sebastian, TS, laid down 02/01/32, receives 667 tons to complete
No.2 type 4 slip - Los Estallas, BB, laid down 02/01/33, receives 2220 tons, balance 21144 tons
No.3 type 3 slip - San Francisco, TS, laid down 02/01/32, receives 667 tons to complete
No.4 type 2 slip - Idle
No.5 type 2 slip - Idle
No.6 type 2 slip - Idle
No.1 type 4 drydock - Idle
No.2 type 3 drydock - Idle
Dock side - Idle
Dock side - Idle
Barreiro-
No.1 type 4 slip - Idle
No.2 type 3 slip - Idle
No.3 type 3 slip - Idle
No.4 type 1 slip - EDA 01 - EDA 03, each receive 20 tons to complete.
No.5 type 1 slip - EDA 04 - EDA 06, each receive 20 tons to complete.
No.6 type 1 slip - EDA 07 - EDA 09, each receive 20 tons to complete.
No.1 type 5 drydock - Idle
No.2 type 3 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Porto-
No.1 type 4 slip - Idle
No.2 type 3 slip - La Luna, BB, laid down 01/10/32, receives 2220 tons, balance 18924 tons
No.3 type 3 slip - Idle
Dock side - Idle
La Coruna-
No.1 type 2 slip - San Diego, TS, laid down 02/01/32, receives 667 tons to complete
No.2 type 1 slip - EDA 10 - EDA 12, each receive 20 tons to complete.
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Santander-
No.1 type 3 slip - San Juan, TS, laid down 02/01/32, receives 667 tons to complete
No.2 type 2 slip - Idle
No.3 type 1 slip - EDA 13 - EDA 15, each receive 20 tons to complete.
No.4 type 1 slip - EDA 16 - EDA 18, each receive 20 tons to complete.
No.5 type 1 slip - EDA 19 - EDA 21, each receive 20 tons to complete.
No.6 type 1 slip - EDA 22 - EDA 24, each receive 20 tons to complete.
No.1 type 2 drydock - Idle
Dock side - Idle
Dock side - Idle
Santiago De Cuba-
No.1 type 2 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.1 type 4 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
Dock side - Idle
Dock side - Idle
San Lorenzo-
No.1 type 3 drydock - Idle
No.2 type 1 drydock - Idle
Dock side - Idle
Panama-
No.1 type 2 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.5 type 1 slip - Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Dock side - Idle
Luanda-
No.1 type 1 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Dock side - Idle
San Hainando-
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
d/ Transactions
1400 tons to Italy as part payment for 2 x "Hercules" class sea-lift vessels
e/ Other Notes
Breaking of the following ships:-
None
Re-Fitting (25%) of the following ships:-
None
Re-Building (50%) of the following ships:-
None
Assault Boats -
EDA 01 - EDA 24 = 24 x 20 tons = 480 tons to complete
(due to metal construction, they are assembled on available type 1 slips)
Sea trials of the following vessels:-
Goteo continue sea trials until 19/07/1933
Diluvio continue sea trials until 19/07/1933
Envasar continue sea trials until 19/07/1933
Empapar continue sea trials until 19/07/1933
Derramar continue sea trials until 19/07/1933
San Sebastian commences sea trials on 10/05/1933
San Francisco commences sea trials on 10/05/1933
San Diego commences sea trials on 10/05/1933
San Juan commences sea trials on 10/05/1933
Commissioning of the following vessels:-
BDT277- BDT288 commission on 01/05/1933
C103 - C112 commissions on 03/05/1933
Tonnage from scrapping = 0
Tonnage Carried Over From This Quarter = 5031 tons
Total Tonnage Carried Over From This Quarter = 5031 tons
f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)
BB = 08 (0) + 2/0 (0)
BC = 04 (0) + 0/0 (0)
CDS(CE) = 05 (0) + 0/0 (0)
CA = 10 (0) + 0/0 (0)
CL = 44 (0) + 0/0 (0)
CV = 04 (0) + 0/0 (0)
DD = 99 (0) + 0/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 92 (0) + 0/0 (0)
SL = 10 (0) + 10/0 (0)
SUB = 54 (0) + 0/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 276 (0) + 12/0 (0)
TS = 02 (0) + 4/0 (0)
TK = 02 (0) + 5/0 (0)
SLV = 00 (0) + 0/2 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo
TS = Troop Ship
TK = Tanker
SL = Sloop
SLV = Sea-Lift Vessel
Hopefully no errors!