You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, January 16th 2007, 3:06am

Denmark, Quarter 2, 1933

Danish Naval Developments Q2 1933

a/ Industrial Allocation
8/11 factories producing materiel for shipbuilding = 8000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts
0/11 Factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Slip No.6 (Type 0) at Aalborg extending to type 1, receives 0.2 IP = Total 0.2 IP points, balance 0.1 pt
Drydock No.2 (Type 0) Former Siamese site at Phuket commences extension , receives 0.1 IP (Danish) and 0.1 IP (Iberian) = Total 0.2 IP points, balance 0.8 IP points
Drydock No.1 (Type 0) at Berbera, commences construction, receives 0.1 IP (Iberian)
= Total 0.1 IP, balance 0.8 IP points
Drydock No.1 (Type 0) at St. Thomas, commences construction, receives 0.1 IP (Iberian) = Total 0.1 IP, balance 0.8 IP points

c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Eias, CA, laid down 02/08/32, receives 1769 tons, balance 5857 tons
No.2 type 2 slip - Skalmold, CL, laid down 02/10/32, receives 1164 tons, balance 2218 tons
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.1 type 3 drydock - Idle
Dock side - Idle

Aarhus-
No.1 type 3 slip - Einmyria, CA, laid down 02/02/32, receives 1,749 tons, balance 2319 tons
No.2 type 2 slip - Herja, CL, laid down 02/10/32, receives 1165 tons, balance 2218 tons
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
Dock side - Idle

Aalborg-
No.1 type 1 slip - Diana, DD, laid down 02/01/33, receives 536 tons, balance 884 tons
No.2 type 1 slip - William Tell, DD, laid down 02/01/33, receives 536 tons, balance 884 tons
No.3 type 1 slip - Lancer (k), DDL, laid down 02/01/33, receives 400 tons, balance 746 tons
No.4 type 1 slip - Lancer (j), DDL, laid down 02/01/33, receives 400 tons, balance 746 tons
No.5 type 1 slip - Lancer (i), DDL, laid down 02/01/33, receives 400 tons, balance 746 tons
No.6 type 0 slip - EXTENDING
Dock side - Idle

Phuket-
No.1 type 0 drydock - Idle
No.2 type 0 drydock - EXTENDING

Berbera-
No.1 type 0 drydock - BUILDING

St. Thomas-
No.1 type 0 drydock - BUILDING

d/ Transactions
None

e/ Other Notes

KDM Herfjotur commissions on 14/06/1933
KDM e(Lancer) continues sea trials until 11/08/1933
KDM f(Lancer) continues sea trials until 11/08/1933
KDM g(Lancer) continues sea trials until 11/08/1933
KDM h(Lancer) continues sea trials until 11/08/1933
KDM Ull continues sea trials until 23/08/1933
KDM Artemis continues sea trials until 23/08/1933

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 3000 tons

f/ Order of Battle
Note: X (Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 02 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 2/0 (0)
CL = 20 (0) + 2/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 30 (0) + 11/0 (0)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)

Hopefully no errors!

This post has been edited 1 times, last edit by "Commodore Green" (Jan 28th 2007, 9:23pm)