Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, January 3rd 2010, 1:07am

Denmark, Quarter 2, 1938

Danish Naval Developments Q2 1938

a/ Industrial Allocation
8/11 factories producing materiel for shipbuilding = 8000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts
0/11 Factories producing infrastructure materiel = 0.0 points


b/ Infrastructure Development
Dry Dock No.1 (Type 0) at Guinea Bisseau, continues extension to Type 1, receives 0.1 IP point, 0.3 IP required to complete.
Dry Dock No.1 (Type 3) at Aarhus, commences extension to Type 3.5, receives 0.1 IP point, 0.3 IP required to complete.


c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Idle
No.2 type 2 slip – Ue 10, Ue 11, Ue 12, SUB, laid down 02/01/1938, receives 109 tons each complete
No.3 type 1 slip – Ue 15, Ue 16, SUB, laid down 02/04/1938, receives 244 tons each, require 109 tons each to complete
No.4 type 1 slip – Ue 17, Ue 18, SUB, laid down 02/04/1938, receives 244 tons each, require 109 tons each to complete
No.1 type 3 drydock – Idle

Dock side - Idle


Aarhus-
No.1 type 3.5 slip – Thor, BB, laid down 01/07/1937, receives 2464 tons, balance 31,472 tons
No.2 type 2 slip – Ue 7, Ue 8, Ue 9, SUB, laid down 02/01/1938, receives 109 tons each to complete
No.3 type 1 slip – Gemini, Experimental Sub, laid down 01/07/1937, receives 163 tons to complete
No.4 type 1 slip – Ue 13, Ue 14, SUB, laid down 02/04/1938, receives 244 tons each, require 109 tons each to complete
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle

Dock side – Extending


Aalborg-
No.1 type 1 slip – Misericorde, DD, laid down 02/01/1938, receives 331 tons, balance 579 tons
No.2 type 1 slip – Navaja, DD, laid down 02/01/1938, receives 331 tons, balance 579 tons
No.3 type 1 slip – Okapi, DD, laid down 02/01/1938, receives 331 tons, balance 579 tons
No.4 type 1 slip – Pugio, DD, laid down 02/04/1938, receives 331 tons, balance 910 tons
No.5 type 1 slip – Qama, DD, laid down 02/04/1938, receives 331 tons, balance 910 tons
No.6 type 1 slip - Rondel, DD, laid down 02/04/1938, receives 331 tons, balance 910 tons

Dock side - Gladius, DD, laid down 01/07/1937, receives 248 tons to complete
Dock side - Hachiwara, DD, laid down 01/07/1937, receives 248 tons to complete
Dock side - Ishakke, DD, laid down 01/07/1937, receives 248 tons to complete
Dockside - Jambiya, DD, laid down 01/10/1937, receives 331 tons, balance 248 tons
Dockside – Khanjali, DD, laid down 01/10/1937, receives 331 tons, balance 248 tons
Dockside – Løvblad, DD, laid down 01/10/1937, receives 331 tons, balance 248 tons

Roskilde-
Wood yard- Klattrup, CGC/PB, laid down 02/04/1938, receives 190 tons to complete
Wood yard- Koldkaer, CGC/PB, laid down 02/04/1938, receives 190 tons to complete
Wood yard- Lystrup, CGC/PB, laid down 02/04/1938, receives 190 tons to complete
Wood yard- Lyngsa, CGC/PB, laid down 02/04/1938, receives 190 tons to complete

Phuket-
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle

Berbera-
No.1 type 1 drydock – Idle

St. Thomas-
No.1 type 1 drydock – Idle

Guinea Bisseau-
No.1 type 0 drydock – Extending

d/ Transactions
0.1 IP points to Siam

e/ Other Notes
KDM Klattrup commissions on 30/06/1938
KDM Koldkaer commissions on 30/06/1938
KDM Lystrup commissions on 30/06/1938
KDM Lyngsa commissions on 30/06/1938
KDM Acinaces commissions on 02/06/1938
KDM Baselard commissions on 02/06/1938
KDM Cinquedea commissions on 02/06/1938
KDM Dirk continues sea trials until 01/09/1938
KDM Øredaggert continues sea trials until 01/09/1938
KDM Facón continues sea trials until 01/09/1938
KDM Ue 7 commence sea trials on 02/05/1938
KDM Ue 8 commence sea trials on 02/05/1938
KDM Ue 9 commence sea trials on 02/05/1938
KDM Ue 10 commence sea trials on 02/05/1938
KDM Ue 11 commence sea trials on 02/05/1938
KDM Ue 12 commence sea trials on 02/05/1938
KDM Gladius commences sea trials on 03/06/1938
KDM Hachiwara commences sea trials on 03/06/1938
KDM Ishakke commences sea trials on 03/06/1938
KDM Gemini commences sea trials on 15/06/1938

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 2496 tons

f/ Order of Battle
Note: X (Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 02 (0) + 1/0 (0)
CDS = 04 (0) + 0/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 02 (0) + 0/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 41 (0) + 15/0 (0)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
CGC = 20 (0) + 4/0 (0)
STC = 36 (0) + 0/0 (0)
MTC = 100 (0) + 0/0 (0)
SUB = 19 (0) + 13/0 (5)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
SRV = 03 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat/Escort
CGC = Coast Guard Cutter/Patrol Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
SRV = Submarine Recovery Vessel


Hopefully no mistakes......EDIT - DOH!!!

This post has been edited 5 times, last edit by "Commodore Green" (Jan 11th 2010, 12:12am)


2

Sunday, January 3rd 2010, 1:00pm

RE: Denmark, Quarter 2, 1938

Quoted

Originally posted by Commodore Green
Danish Naval Developments Q2 1938

......

Aarhus-
No.1 type 3.5 slip – Thor, BB, laid down 01/07/2009, receives 2464 tons, balance 31,472 tons

.......
Hopefully no mistakes......



?( Really the right date ?????? ;)

3

Sunday, January 3rd 2010, 1:46pm

I think he was checking to see if anyone was looking!

4

Sunday, January 3rd 2010, 4:23pm

Ahhh crap!! :(

Sorted! :]