You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, November 13th 2014, 1:01am

Chile, Q3/1945



Industrial Allocation
- 8/9 factories producing 8,000t materials.
- 2,359 tons from stockpile.
- 662 tons from scrapping
- 11,021 tons materials total.
- 9,048 tons used.
- 1,973 tons stored for Q4/45.
- 1/9 factories dedicated to infrastructure.

Infrastructure Development
1 factory dedicated to infrastructure; produces 0.1 IP, which goes to upgrading the Talcahuano S2 into an S2.5.

Naval Construction
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Reserve Hull 008 finishes scrapping July 1st through August 7th, 1945. 179 / 179 tons recovered Q3/1945. Reserve Hull 010 finishes scrapping August 15th through September 25th, 1945. 179 / 179 tons recovered Q3/1945.
S3.5: Dock landing ship Disembarkment of Pisagua laid down April 2nd, 1945. 5250 tons required. 1100 tons added Q3/1945 for a total of 2200 / 5250. 3050 / 5250 tons remaining until completion. Ship launched September 21st, 1945 and completed on June 8th, 1946.
D2.5: Reserve Hull 007 finishes scrapping July 1st through August 7th, 1945. 179 / 179 tons recovered Q3/1945. Reserve Hull 009 finishes scrapping August 15th through September 25th, 1945. 179 / 179 tons recovered Q3/1945.
D2: Destroyer Cerro Fitz Roy refitting between July 1st 1945 and September 28th. 1945. 676 tons required to complete. 676 tons added Q3/45 for a total of 676 / 676 tons. 0 / 676 tons remaining. Refit completed.
S2: Upgrading to S2.5. 0.3 of 0.5 IP added.
S1: Idle.
D0: Idle.

Dockside:
- PA-04 Patria laid down July 1st, 1944. 2,200 tons added Q3/45 for a total of 11000 / 20000 tons. 9000 / 20000 tons remaining. Ship launched June 18th, 1945 and completed on December 1st, 1946.
- CP-05 O'Higgins laid down April 1st, 1944. 2,400 tons added Q3/45 for a total of 14400 / 14525 tons. 125 / 14525 tons remaining. Ship launched on January 15th, 1945. Ship completed on February 6th, 1946.
- DE-32 Salinas laid down October 1st, 1944. 220 tons added Q3/45 for a total of 1195 / 1195 tons. 0 / 1195 tons remaining. Ship launched on February 3rd 1945. Ship completed on August 6th, 1945.

ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Idle.
S1: Idle.
D1: Destroyer Aldea II refitting between July 1st 1945 and September 19th. 1945. 362 tons required to complete. 362 tons added Q3/45 for a total of 362 / 362 tons. 0 / 362 tons remaining. Refit completed.

Dockside:
- Fleet submarine Marlin (SO-04) laid down January 1st, 1945. 550 tons added Q3/45 for a total of 1650 / 1650 tons. 0 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.
- Fleet submarine Esturión (SO-05) laid down January 1st, 1945. 550 tons added Q3/45 for a total of 1650 / 1650 tons. 0 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.
- Fleet submarine Bonito (SO-06) laid down January 1st, 1945. 550 tons added Q3/45 for a total of 1650 / 1650 tons. 0 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.

ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Light minesweeper YDM-15 laid down July 1st, 1945. 190 tons added Q3/1945 for a total of 190 / 190. Completed and launched on July 30th, 1945.
S0: Submarine chaser Pascua laid down April 1st, 1945. 250 tons added Q3/1945 for a total of 250 / 250. Ship launched August 20th, 1945. Ship will complete on August 8th, 1945.

Dockside:
- Submarine chaser Itata laid down April 1st, 1945. 0 tons added Q3/1945 for a total of 250 / 250. Ship launched May 20th, 1945. Ship will complete on August 8th, 1945.

ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle.

Dockside:
None

from factories:
- N/A

On Trials
- CP-04 Almirante Latorre completes six months of builders trials.
- DE-30 Troncoso completes six months of builders trials.
- DE-31 Litton continues six months of builders trials.
- DE-32 Salinas begins six months of builders trials.
- Subchaser Rapel completes three months of builder's trials.
- Subchaser Itata begins three months of builder's trials.

Scrapping
- Total tonnage in recycling until Q3/45: (2x152) + (2x179) = 662 tons
- Total tonnage in recycling until Q4/45: (2x179) = 352 tons
- Total tonnage in recycling until Q1/46: (2x179) = 352 tons
- Total tonnage in recycling until Q2/46: (4x179) = 716 tons

Transactions
None

Other Notes
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date December 1945. Project is in prototype stages at Sisdef.
- Proyecto-M: Light Antiaircraft Cruiser prepared for January 1946 keel-laying.

Order of Battle (Armada de Chile) September 30th, 1945
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Primary Combatants:
Battlecruisers: 3(0)+0
Aircraft Carriers: 3(0)+1
Heavy Cruiser: 2(0)+1
Light Cruisers: 6(0)+0
Helicopter Cruisers: 1(0)+0
Large Destroyers: 8(0)+0 {3,000 tons std and up}
Medium Destroyers: 50(0)+0 {1,200-3,000 tons std}
Light Destroyers (Corvettes): 8(0)+0 {under 1,200 tons std}
Destroyer Escorts: 14(0)+0
Minelayer: 2(0)+0
Torpedo Boats: 25(0)+0
Submarines: 8(0)+3
Subchasers: 18(0)+1
Minesweepers: 27(0)+0
Arctic Patrol Vessel: 3(0)+0

Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0

Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0

Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Landing Ship Dock: 0(0)+1
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 2(0)+0
Landing Craft Tank: 0(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0

Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 12(0)+0
Museum Ships: 1(0)+0

Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)