[SIZE=5]Q1 1940[/size]
[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 2,986t from Stockpile
- 4,840t from Transactions
- 17,826t Total materials
- 17,390t used
- 436t stored for Q2/1940
[size=3]Infrastructure Development[/size]
Souda Bay:
- 0.5 IP (dedicated) added to Type 2 drydock at Souda Bay. 2.5 IP remaining.
[SIZE=3]Naval Construction[/SIZE]
Attica:
D3: Idle
D3: Idle
D2: Idle
S2: Idle
S2: Idle
S1: - D-98 Lefkada laid down January 2nd, 1940. 2,175 tons required; 584 / 2175t added Q1/40 for total 584 / 2175. 1,591 tons remaining.
S1: - D-99 Ithaki laid down January 5th, 1940. 2,175 tons required; 584 / 2175t added Q1/40 for total 584 / 2175. 1,591 tons remaining.
S0: Idle
S0: Idle
Dockside:
- B-6 Lysandros laid down January 1st, 1936. 37,000 tons required; 2868 / 37000 tons added Q1/40 for total 36518 / 37000. 482 tons remaining until completion. Launched.
- B-7 Perikles laid down January 1st, 1936. 37,000 tons required; 2868 / 37000 tons added Q1/40 for total 36518 / 37000. 482 tons remaining until completion. Launched.
- Banat, Romanian Cruiser laid down July 1st, 1939. 5,988 tons required; 1200 / 5988 added Q1/40 for total 3600 / 5988. 2,388 tons remaining until completion. Launched.
- Srbija, Yugoslavian Cruiser laid down October 1st, 1939. 4,549 tons required; 1820 / 4549 added Q1/40 for total 3640 / 4549. 909 tons remaining until completion. Launched.
- D-95 Eptanisa laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q1/40 for total 1752 / 2175. 423 tons remaining until completion. Launched.
- D-96 Kerkyra laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q1/40 for total 1752 / 2175. 423 tons remaining until completion. Launched.
Paros:
D1: Idle
D0: Idle
Dockside:
Patra:
D1: Idle
S1: - D-100 Kefalonia laid down January 3rd, 1940. 2,175 tons required; 584 / 2175t added Q1/40 for total 584 / 2175. 1,591 tons remaining until completion.
D0: Idle
Dockside:
- D-97 Paxi laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q1/40 for total 1752 / 2175. 423 tons remaining until completion. Launched.
Salamis:
D1: Idle
Dockside:
Souda Bay:
D4: Idle
S2: - M-7 Kos laid down January 4th, 1940. 2,743 tons required; 700 / 2743 added Q1/40 for total of 700 / 2743. 2,043 tons remaining until completion.
D2: Under construction
D1: Idle
D1: Idle
D1: Idle
Dockside:
- Crna Gora, Yugoslavian Cruiser laid down October 1st, 1939. 4,549 tons required; 1820 / 4549 added Q1/40 for total 3640 / 4549. 909t remaining until completion. Launched.
Thessaloniki:
D0: Idle
S0: Idle
S0: Idle
Volos:
D1: Idle
Dockside:
Limassol:
D3: Idle
D1: Idle
From factories:
- GB-33, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-34, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-35, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-36, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-37, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-38, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- CMSW-33, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-34, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-35, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-36, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-37, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-38, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
On Trails:
- C-36 Gaugamela laid down January 1st, 1938. Completed January 20th, 1940. Begins trails January 23rd, 1940. Completes trails July 30th, 1940.
[size=3]Transactions[/size]
Recieved 1,200t from Romania for cruiser contruction
Recieved 3,640 tons from Yugoslavia for cruiser construction
Sent 720 tons to Great Britain for Rhodos class fast minelayer construction
[size=3]Other Notes[/size]
Purchase from Great Britain also includes the buiders plans for the Rhodos Class, allowing sister ships to be built domestically.
[size=3]Order of Battle (Greek Navy) end of Q4 1939[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Fleet Combatants
Battleships 3(0)+2
Large Cruisers 4(0)+0
Carriers 6(0)+0
Training Carrier 1(0)+0
Heavy Cruisers 2(0)+0
Light Cruisers 14(0)+0
Escort Cruisers 6(0)+0
Flotilla Leaders 4(0)+0
Destroyers 59(0)+6
Submarines 46(0)+0
Torpedo Boats 10(0)+0
Small Combatants
Large Gunboats 14(0)+0)
Small Gunboats/Subchasers 38(0)+0
Minelayers 5(0)+1 (Plus 1 under construction in Great Britain)
Minesweepers 40(0)+0
Coastal Minesweepers 38(0)+0
Harbour Launches 3(0)+0
Other Small Combatants 145(0)+0
Auxiliaries
Special transports 5(0)+0
Landing Craft 32(0)+0
Training Ships 4(0)+0
Tenders 4(0)+0
Fleet Train 11(0)+0
This post has been edited 2 times, last edit by "Sachmle" (Nov 20th 2010, 9:02pm)