Well, since I'll be leaving for holiday on Thursday, I decided to post my Q3 stuff already.
Japan’s Naval Developments – Q3/1924
A. Industrial Allocation
15/27 factories producing warship material = 15,000 t. No stockpiled materials available. 15,000 t are used, no materials stockpiled.
12/27 factories are dedicated to producing infrastructure material, = 1.2 pts.
B. Infrastructure Development
Type 1 slip at
Kure Navy Yard receives 0.3 pts, for a total of 0.4 pts (designation Slip I-1B).
Type 1 slip at
Yokosuka Navy Yard receives 0.3 pts, for a total of 0.4 pts (designation Slip I-2B).
Type 1 slip at
Kawasaki Co. receives 0.3 pts, for a total of 0.4 pts (designation Slip I-3A).
Type 1 slip at
Mitsubushi Co. receives 0.3 pts, for a total of 0.4 pts (designation Slip I-4A).
C. Naval Construction
Kure Navy Yard, Kure (Honshu)
Slip V-1A => BB Kii receives 2379 tons
Slip I-1A => DD2 Fubuki receives 420 tons. Launched 8/15/1924
Slip I-1B => Under construction
Dock V-1A => idle
Yokosuka Navy Yard, Yokosuka (Honshu)
Slip V-2A => idle
Slip I-2A => idle
Slip I-2B => Under construction
Free-floating: GB Go ni Mk.1 IV receives 468 tons.
Kawasaki Co, Kobe (Honshu)
Slip V-3A => idle
Slip II-3A => DD3 Kirihime laid down 7/1/1924. Receives 174 tons.
Slip I-3A => Under construction
Dock II-3A => idle
Free-floating: GB Go ni Mk.2 I receives 762 tons.
Mitsubushi Co, Nagasaki (Kyushu)
Slip V-4A => idle
Slip II-4A => DD3 Ninaris laid down 7/1/1924. Receives 174 tons.
Slip I-4A => Under construction
Dock II-4A => idle
Free-floating: GB Go ni Mk.2 II receives 762 tons.
Fukuoka Navy Yard, Fukuoka (Kyushu)
Slip III-5A => CA Miyazawa Yukino receives 1,853 tons. Launched 9/29/1924
Slip II-5A => DD3 Belkut laid down 7/1/1924. Receives 174 tons.
Slip I-5A => DD2 Shirayuki receives 420 tons. Launched 8/15/1924
Dock III-5A => idle
Hakodate Navy Yard, Hakodate (Hokkaido)
Slip III-6A => CA Sakura Tsubaki receives 1,853 tons. Launched 9/29/1924
Slip II-6A => DD3 Syndra laid down 7/1/1924. Receives 174 tons.
Slip I-6A => DD2 Hatsuyuki receives 420 tons. Launched 8/15/1924
Aomori Navy Yard, Aomori (Honshu)
Slip III-7A => CDS Atatake laid down 7/1/1924. Receives 1239 tons.
Slip I-7A => DD2 Murakumo receives 420 tons. Launched 8/15/1924
Dock I-7A => idle
Kagoshima Navy Yard, Kagoshima (Kyushu)
Slip III-8A => DD3 Corona laid down. Receives 174 tons.
Slip I-8A => idle
Dock I-8A => idle
Slip 0-8A => idle
Slip 0-8B => idle
Dock 0-8A => idle
Free-floating: GB Go ni Mk.1 III receives 468 tons.
Wakayama Navy Yard, Wakayama (Honshu)
Slip III-9A => DD3 Lapis laid down 7/1/1924. Receives 174 tons.
Slip I-9A => DD2 Akatsuki receives 426 tons. Launched 8/15/1924
Dock I-9A => idle
Tokushima Navy Yard, Tokushima (Shikoku)
Slip III-10A => DD3 Hugtrang laid down 7/1/1924. Receives 174 tons.
Slip I-10A =>DD2 Hibiki receives 426 tons. Launched 8/15/1924
Dock I-10A => idle
Niigata Navy Yard, Niigata (Honshu)
Slip I-11A => idle
Slip I-11B => DD2 Inazuma receives 426 tons. Launched 8/15/1924
Dock III-11A => idle
Free-floating: GB Go ni Mk.1 V receives 468 tons.
Niihama Navy Yard, Niihama (Shikoku)
Slip I-12A => idle
Slip I-12B => DD2 Ikazuchi receives 426 tons. Launched 8/15/1924
Dock III-12A => idle
Free-floating: GB Go ni Mk.1 VI receives 468 tons.
D. Transactions
none.
E. Other Notes
DD3 Urazen Sie, Poesche Nomien, Sharie Randers Krötenschwanz, Bijotorn Corlala, State Ballo Kaiedia, Nu. Suoad Graphight, Iemrah Lout Jajas, Mishalu Ha Lonn, John Weinzel, Allen Braford, Maximum Holtfors Balance Kaien, Qukey, and Bugle de Leizer complete shakedown cruises.
DD3 Ko Fan Shiemar, Amaterasu dis Greens Ooe LED, Huselles Carliey, Eidrian Tag, Myoury Kinky, Sir Bester Orbit, Picking Harres, Vralgo Kentauri, Blreno Canzian, Barbaluse V., Trao Ballanka, Mell Sacheir, Mell Rince Usare Tama, Zoom, Daizina Meister, Label Judah, Maiyu Sukat, Iler the Bishop, Palu Suyene, Viscount Huah von Hitter, Muse van Reyback, Meeth Silver, Dimor Hiahraki, Jabo Beat, Senkoukei Tomoe, Michael Lester, and Dougulus Kaien continue shakedown cruises.
New units laid down this quarter:
Coast Defense Ship Atatake requires 7499 tons and 16.5 months
Destroyers Syndra, Belkut, Kirihime, Ninaris, Corona, Lapis, Hugtrang of the FSS: F class require 581 tons and 10 months
F. Updated Order of Battle, 31/9/24
Note:
Y)+Z = completed (under repair/refit) + under construction
Limited warships:
Battleships: 6(0)+1
Aircraft Carriers: 3(0)+0
Heavy Cruisers: 4(0)+2
Light Cruisers: 14(0)+0
Destroyers class 1: 0(0)+0
Destroyers class 2: 22(0)+8
Submarines: 7(0)+0
Coast Defense Vessels: 3(0)+1
Museum ships: 2(0)+0
Non-limited Warships
Destroyers class 3: 175(0)+7
Gunboats: 26(0)+6
Minelayers: 27(0)+0
Minesweepers: 18(0)+0
Submarine Chasers class 1: 30(0)+0
Submarine Chasers class 2: 42(0)+0
Corvettes: 30(0)+0
Auxiliaries:
Ammunition ships: 3
Oilers: 9
Cargo ships: 32
Transport ships: 16
Tenders: 7
Repair ships: 5
Netlayer and target towing vessel: 4
Naval Tugs: 12