You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Wednesday, March 19th 2008, 10:23pm

South Africa #58 Report

[SIZE=3]SAE Quarterly Reports[/SIZE]

No. 58  April to June 1935


[SIZE=3]Transfers/Notes:[/SIZE]


The SAE switched to war-time production in Q1/35 due to events in South America. Factory output will be increased starting Q3/35.


[SIZE=3]Factories:[/SIZE]

26 factories total can be used.

Fixed factories

2 factories will be fixed to produce infrastructure points for 1935.

Flexible factories

530ts material transferred from Q1 (incl. material recovered from scrapyard).

23,703ts of material need to be produced in this quarter (24 factories).

0 factories will produce infrastructure points this quarter.

Infrastructure points used this quarter:

0,2pts put into factory #27 for a total of 3,2pts at the end of Q2/35.


[SIZE=3]Ships:[/SIZE]

Minor vessels


Completed Units

43x UJ26-class ASW launch
34x UJ30-class ASW launch

42x R28-class motor launch
24x R31-class motor launch

12x S34-class motor torpedo boat

8x Tree-class minesweeper (Type 16)
13x Bush-class minesweeper (Type 21)
11x Cactus-class minesweeper (Type 28)

8x S-class sloops
4x Circe-class sloops
4x Polar II-class sloops

15x River-class frigate

8x Pleiades-class light destroyers
8x Planet-class light destroyers

4x Guard-class patrol crafts

On Trials

3x Bush-class minesweeper
- Blackberry running trials until May 35
- Ash running trials until July 35
- Buddleia running trials until September 35

1x Guard-class patrol craft
- Alerter running trials until May 35

1x UJ30-class ASW launch
- UJ55 running trials until May 35

4x S34-class motor torpedo boat
- S9-S12 running trials until May 35

Ordered Units

2x LD35-class light destroyer (10 month á 71ts material necessary per unit)
- LD35-1 Goshawk laid down in Douala on a Type 1 slip in January, completed in October 35
- LD35-2 Buzzard laid down in Daressalam on a Type 1 slip in February, completed in November 35

8x S34-class motor torpedo boat (1 month á 60ts material necessary per unit)
- S13-S16 laid down in Lüderitz in April, completed in April 35
- S17-S20 laid down in Lüderitz in June, completed in June 35

1x GB35-class river gun boat (1 month á 123ts material necessary per unit)
- Viktor Garcia laid down in Buenos Aires in May, completed in May 35

Rebuilds/Refits/Repairs

1x Cactus-class minesweeper (2 month á 39ts/month material necessary per unit)
- Fenestraria entering the yards in Montevideo in June. The vessel will stay in the yard until July 35

1x Cactus-class minesweeper (2 month á 42ts/month material necessary per unit)
- Faucaria entering the yards in Buenos Aires in June, the vessel will stay in the yard until July 35

1x R28-class motor launch (1 month á 23ts/month material necessary per unit)
- R13 entering a Type 0 dock in Mar del Plata in April, the vessel will stay in the yard until April 35

Scrapping

None


Destroyers

Completed Units

12x Cat-class torpedoboat (Type 16)
9x Hound-class torpedoboat (Type 21)
11x Hound-class torpedoboat (Type 26)

8x Nymph-class destroyer (Type 21)
10x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
6x Snake-class destroyer (Type 32)

8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)

On Trials

1x DD32-class destroyer
- Sidewinder running trials until August 35
- Pit Viper running trials until August 35

Ordered Units

None

Rebuilds/Refits/Repairs

1x TB21-class torpedoboat (3 month á 83ts/month material necessary per unit)
- Borzoi entering a Type 1 dock in Buenos Aires in February. Leaving the dock in February, the torpedoboat will stay in the yard until April 35

1x DD21-class destroyer (2 month á 71ts/month material necessary per unit)
- Amphitrite entering the yard in Montevideo in April, the destroyer will stay in the yard until May 35

1x DD23-class destroyer (3 month á 116ts/month material necessary per unit)
- Galene entering a Type 1 dock in Port Elizabeth in June. Leaving the dock in July, the destroyer will stay in the yard until August 35

Scrapping

None


Class B Cruisers

Completed Units

2x Nampula-class light cruiser (Type 08)
4x Port Shepstone-class light cruiser (Type 13)
6x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
2x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
4x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
4x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)

5x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)

On Trials

1x CL21-class light cruiser
- St. Denis running trials until September 35

1x Diana-class destroyer leader (Type 34)
- Diana running trials until September 35

Ordered Units

1x DL34C-class destroyer leader (11 month á 239ts material necessary per unit)
- Uller laid down in Durban on a Type 2 slip in February, completed in January 36

2x CLAA34-class anti-aircraft cruiser (14 month á 347ts material necessary per unit)
- Daphne laid down in Cape Town on a Type 2 slip in July, completed in August 35
- Dione laid down in Montevideo on a Type 2 slip in July, completed in August 35

Rebuilds/Refits

1x CL21-class light cruiser (4 month á 334ts/month material necessary per unit)
- Iringa entering a Type 2 dock in Durban in April. Leaving the dock in May, the cruiser will stay in the yard until July 35

Scrapping

None


Class A Cruisers

Completed Units

1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
2x Dragon-class (Type 29)
1x Hero-class (Type 33)

On Trials

None

Ordered Units

2x CA34F-class heavy cruiser (26 month á 666ts material necessary per unit)
- Radiance laid down in Port Elizabeth on a Type 4 slip in April, completed in May 36
- Brilliance laid down in Durban on a Type 4 slip in July, completed in August 36

1x Hero-class heavy cruiser (21 month á 555ts material necessary per unit)
- Belerophon laid down in Buenos Aires on a Type 3 slip in October, completed in June 36

Refits

None

Scrapping

None


Capital Units

Completed Units

2x Hertog-class
2x Koning-class
2x Mauritius-class
1x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class

On Trials

2x BB29O-class battleship
- Imperator running trials until May 35
- Conqueror running trials until May 35

1x South Africa-class battleship
- Cameroon running trials until July 35

Ordered Units

2x BB33Lh-class battleship (48 month á 796ts material necessary per unit)
- Monarch laid down in Montevideo on a Type 4 slip in January, completed in December 36
- Sovereign laid down in Buenos Aires on a Type 4 slip in January, completed in December 37

Rebuilds/Refits

None

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class
1x Tyrfing-class
1x Gungnir-class

2x LCDS-class
2x LCDS-2-class

On Trials

None

Ordered Units

1x CDS8-class CDS (17 month á 467ts material necessary per unit)
- Excalibur laid down in Cape Town on a Type 3 slip in April, completed in August 36


Carriers

Completed Units

1x Hammer-class fleet carrier (Type 25B)
1x Forge-class fleet carrier (Type 26)

2x Anvil-class light fleet carrier (Type 30)

On Trials

None

Ordered Units

2x CV34-class carrier (30 month á 687ts material necessary per unit)
- Thomas van Deen laid down in Durban on a Type 3 slip in April, completed in September 36
- Cornelis Keser laid down in Cape Town on a Type 3 slip in October, completed in March 37

Rebuilds/Refits

None


Class A Submarines

Completed Units

11x E-class submarine
15x F-class submarine
4x J-class submarine
2x L-class submarine

On Trials

None

Ordered Units

2x M-class fleet submarine (11 month á 99ts material necessary per unit)
- M1 laid down in Durban on a Type 0 slip in January, completed in November 35
- M2 laid down in Durban on a Type 0 slip in February, completed in December 35


Class B Submarines

Completed Units

15x I-class submarine
10x H-class submarine
16x K-class submarine

On Trials

None

Ordered Units

None

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
0x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)

4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier

1x FV32-class fleet support ship

On Trials

None

Ordered Units

1x TD35-class tender (15 month á 363ts material necessary per unit)
- TD35-1 Montevideo Bay laid down in Daressalam on a Type 2 slip in January, completed in March 36

Rebuilds/Refits

2x Bay-class tender (5 month á 418ts/month material necessary per unit)
- Delagoa Bay entering a Type 2 dock in Montevideo in December. Leaving the dock in January, the tender will stay in the yard until April 35
- Algoa Bay entering a Type 2 dock in Montevideo in May. Leaving the dock in June, the tender will stay in the yard until September 35

-----------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

77 ASW launches
66 motor launches
12 motor torpedo boats
32 minesweepers
51 small patrol crafts
103 TB/DD/DLs of less than 2,000ts
42 cruisers category b
10 cruisers category a
14 capital units
7 costal defence ships
4 fleet carrier
41 submarines category b
32 submarines category a
8 floatplane carriers
17 armed tenders
1 fleet support ship

plus numerous auxiliary vessels of all kind.