[SIZE=3]SAE Quarterly Reports[/SIZE]
No. 58 April to June 1935
[SIZE=3]Transfers/Notes:[/SIZE]
The SAE switched to war-time production in Q1/35 due to events in South America. Factory output will be increased starting Q3/35.
[SIZE=3]Factories:[/SIZE]
26 factories total can be used.
Fixed factories
2 factories will be fixed to produce infrastructure points for 1935.
Flexible factories
530ts material transferred from Q1 (incl. material recovered from scrapyard).
23,703ts of material need to be produced in this quarter (24 factories).
0 factories will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,2pts put into factory #27 for a total of 3,2pts at the end of Q2/35.
[SIZE=3]Ships:[/SIZE]
Minor vessels
Completed Units
43x UJ26-class ASW launch
34x UJ30-class ASW launch
42x R28-class motor launch
24x R31-class motor launch
12x S34-class motor torpedo boat
8x Tree-class minesweeper (Type 16)
13x Bush-class minesweeper (Type 21)
11x Cactus-class minesweeper (Type 28)
8x S-class sloops
4x Circe-class sloops
4x Polar II-class sloops
15x River-class frigate
8x Pleiades-class light destroyers
8x Planet-class light destroyers
4x Guard-class patrol crafts
On Trials
3x Bush-class minesweeper
- Blackberry running trials until May 35
- Ash running trials until July 35
- Buddleia running trials until September 35
1x Guard-class patrol craft
- Alerter running trials until May 35
1x UJ30-class ASW launch
- UJ55 running trials until May 35
4x S34-class motor torpedo boat
- S9-S12 running trials until May 35
Ordered Units
2x LD35-class light destroyer (10 month á 71ts material necessary per unit)
- LD35-1 Goshawk laid down in Douala on a Type 1 slip in January, completed in October 35
- LD35-2 Buzzard laid down in Daressalam on a Type 1 slip in February, completed in November 35
8x S34-class motor torpedo boat (1 month á 60ts material necessary per unit)
- S13-S16 laid down in Lüderitz in April, completed in April 35
- S17-S20 laid down in Lüderitz in June, completed in June 35
1x GB35-class river gun boat (1 month á 123ts material necessary per unit)
- Viktor Garcia laid down in Buenos Aires in May, completed in May 35
Rebuilds/Refits/Repairs
1x Cactus-class minesweeper (2 month á 39ts/month material necessary per unit)
- Fenestraria entering the yards in Montevideo in June. The vessel will stay in the yard until July 35
1x Cactus-class minesweeper (2 month á 42ts/month material necessary per unit)
- Faucaria entering the yards in Buenos Aires in June, the vessel will stay in the yard until July 35
1x R28-class motor launch (1 month á 23ts/month material necessary per unit)
- R13 entering a Type 0 dock in Mar del Plata in April, the vessel will stay in the yard until April 35
Scrapping
None
Destroyers
Completed Units
12x Cat-class torpedoboat (Type 16)
9x Hound-class torpedoboat (Type 21)
11x Hound-class torpedoboat (Type 26)
8x Nymph-class destroyer (Type 21)
10x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
6x Snake-class destroyer (Type 32)
8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
On Trials
1x DD32-class destroyer
- Sidewinder running trials until August 35
- Pit Viper running trials until August 35
Ordered Units
None
Rebuilds/Refits/Repairs
1x TB21-class torpedoboat (3 month á 83ts/month material necessary per unit)
- Borzoi entering a Type 1 dock in Buenos Aires in February. Leaving the dock in February, the torpedoboat will stay in the yard until April 35
1x DD21-class destroyer (2 month á 71ts/month material necessary per unit)
- Amphitrite entering the yard in Montevideo in April, the destroyer will stay in the yard until May 35
1x DD23-class destroyer (3 month á 116ts/month material necessary per unit)
- Galene entering a Type 1 dock in Port Elizabeth in June. Leaving the dock in July, the destroyer will stay in the yard until August 35
Scrapping
None
Class B Cruisers
Completed Units
2x Nampula-class light cruiser (Type 08)
4x Port Shepstone-class light cruiser (Type 13)
6x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
2x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
4x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
4x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
5x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
On Trials
1x CL21-class light cruiser
- St. Denis running trials until September 35
1x Diana-class destroyer leader (Type 34)
- Diana running trials until September 35
Ordered Units
1x DL34C-class destroyer leader (11 month á 239ts material necessary per unit)
- Uller laid down in Durban on a Type 2 slip in February, completed in January 36
2x CLAA34-class anti-aircraft cruiser (14 month á 347ts material necessary per unit)
- Daphne laid down in Cape Town on a Type 2 slip in July, completed in August 35
- Dione laid down in Montevideo on a Type 2 slip in July, completed in August 35
Rebuilds/Refits
1x CL21-class light cruiser (4 month á 334ts/month material necessary per unit)
- Iringa entering a Type 2 dock in Durban in April. Leaving the dock in May, the cruiser will stay in the yard until July 35
Scrapping
None
Class A Cruisers
Completed Units
1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
2x Dragon-class (Type 29)
1x Hero-class (Type 33)
On Trials
None
Ordered Units
2x CA34F-class heavy cruiser (26 month á 666ts material necessary per unit)
- Radiance laid down in Port Elizabeth on a Type 4 slip in April, completed in May 36
- Brilliance laid down in Durban on a Type 4 slip in July, completed in August 36
1x Hero-class heavy cruiser (21 month á 555ts material necessary per unit)
- Belerophon laid down in Buenos Aires on a Type 3 slip in October, completed in June 36
Refits
None
Scrapping
None
Capital Units
Completed Units
2x Hertog-class
2x Koning-class
2x Mauritius-class
1x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
On Trials
2x BB29O-class battleship
- Imperator running trials until May 35
- Conqueror running trials until May 35
1x South Africa-class battleship
- Cameroon running trials until July 35
Ordered Units
2x BB33Lh-class battleship (48 month á 796ts material necessary per unit)
- Monarch laid down in Montevideo on a Type 4 slip in January, completed in December 36
- Sovereign laid down in Buenos Aires on a Type 4 slip in January, completed in December 37
Rebuilds/Refits
None
Scrapping
None
Coastal Defence Units
Completed Units
1x Nagelring-class
1x Tyrfing-class
1x Gungnir-class
2x LCDS-class
2x LCDS-2-class
On Trials
None
Ordered Units
1x CDS8-class CDS (17 month á 467ts material necessary per unit)
- Excalibur laid down in Cape Town on a Type 3 slip in April, completed in August 36
Carriers
Completed Units
1x Hammer-class fleet carrier (Type 25B)
1x Forge-class fleet carrier (Type 26)
2x Anvil-class light fleet carrier (Type 30)
On Trials
None
Ordered Units
2x CV34-class carrier (30 month á 687ts material necessary per unit)
- Thomas van Deen laid down in Durban on a Type 3 slip in April, completed in September 36
- Cornelis Keser laid down in Cape Town on a Type 3 slip in October, completed in March 37
Rebuilds/Refits
None
Class A Submarines
Completed Units
11x E-class submarine
15x F-class submarine
4x J-class submarine
2x L-class submarine
On Trials
None
Ordered Units
2x M-class fleet submarine (11 month á 99ts material necessary per unit)
- M1 laid down in Durban on a Type 0 slip in January, completed in November 35
- M2 laid down in Durban on a Type 0 slip in February, completed in December 35
Class B Submarines
Completed Units
15x I-class submarine
10x H-class submarine
16x K-class submarine
On Trials
None
Ordered Units
None
Scrapping
None
Non-combatants
Completed Units
1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
0x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
1x FV32-class fleet support ship
On Trials
None
Ordered Units
1x TD35-class tender (15 month á 363ts material necessary per unit)
- TD35-1 Montevideo Bay laid down in Daressalam on a Type 2 slip in January, completed in March 36
Rebuilds/Refits
2x Bay-class tender (5 month á 418ts/month material necessary per unit)
- Delagoa Bay entering a Type 2 dock in Montevideo in December. Leaving the dock in January, the tender will stay in the yard until April 35
- Algoa Bay entering a Type 2 dock in Montevideo in May. Leaving the dock in June, the tender will stay in the yard until September 35
-----------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
77 ASW launches
66 motor launches
12 motor torpedo boats
32 minesweepers
51 small patrol crafts
103 TB/DD/DLs of less than 2,000ts
42 cruisers category b
10 cruisers category a
14 capital units
7 costal defence ships
4 fleet carrier
41 submarines category b
32 submarines category a
8 floatplane carriers
17 armed tenders
1 fleet support ship
plus numerous auxiliary vessels of all kind.