You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, September 26th 2005, 12:00am

Turkey Q4/28

*To be revised if needed*

A. Industrial Allocation

1/6 factories (non-fixed) to naval materials: 1,000 tons created for Q4/1928 + 247 tons stockpiled from Q3/28 = 1,247 tons, 1,236 tons used, 11 tons stockpiled for next quarter

2/6 factories (fixed) to infrastructure development: 0.2 points for Q4/1928 + 0.2 bonus points
3/6 factories (non-fixed) to infrastructure development: 0.3 points for Q4/1928
Total 0.7 points created for Q4/28

B. Infrastructure Development

0.0 points put into new factory # 7, 9.2 points needed, 0.8 points used, 0.0 points added, construction suspended
0.5 points put into type 1 slip at Izmit, 0.2 points used, 0.5 points added
0.5 points put into type 1 drydock at Samsun, 1.0 points needed, 0.3 points used, 0.2 points added

C. Naval Construction

Istambul Type 2 port (4/5)

type 3 drydock #1 - Torpedo boat Giresun building, 601 tons needed, 200 tons used, 161 tons added
type 1 drydock #1 - Torpedo boat Gümüshane building, 601 tons needed, 200 tons used, 161 tons added
type 0 slip #1 - Idle
type 0 slip #2 - Idle

Izmit Type 3 Port

type 3 drydock #1 -
type 1 drydock #1 - Torpedo boat Isparta laid down, 601 tons needed, 200 tons added
type 1 slip #1 under construction, 1.0 points needed, 0.2 points used, 0.5 points added


Samsun

type 3 drydock #1 - Idle
type 0 drydock #1 - upgrading to type 1 drydock, 1.0 points needed, 0.5 points used, 0.2 points added
type 0 drydock #2 - Muin-I-Zaffer scrapping

Icel Type 1 Port (3/3)

type 1 slip #1 - Torpedo boat Hakkari building, 601 tons needed, 200 tons used, 161 tons added
type 1 slip #2 - Torpedo boat Karaman laid down, 601 tons needed, 200 tons added
type 0 drydock #1 - Idle


Trabzon Type 1 port (1/3)

type 1 drydock #1 - Torpedo boat Konya laid down, 601 tons needed, 200 tons added


Launched ships being completed:

3xAgri class Torpedo Boats, Agri, Ardahan and Balýkesir completed
3xAgri class Torpedo Boats launched, Çankırı, Düzce, Elazığ 601 tons needed, 550 tons used, 51 tons added to each


Ships completed and on trials

3xAgri class Torpedo Boats, Agri, Ardahan and Balýkesir begin trials

Summary of ship building/repairs/rebuilds and convertions.

9xAgri class Torpedo Boats, Giresun, Gümüshane, Hakkari, Çankırı, Düzce, Elazığ Isparta, Karaman, Konya building

D. Transactions

None


E. Other Notes

Armoured cruiser Muin-I-Zaffer scrapping
Gunboats Marmaris and Malatia, beached at Samsun scrapping


F. Updated Order of Battle, 1/4/27

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 2(0)0 *Hairedin Babarossa (Dante Alighieri) leased from Italy*
BC: 1(0)0
PD: 2(0)0
AC: 1(0)0 *San Marco leased from Italy*
CA: 1(0)0
PC: 2(0)0
CL: 4(0)0
DD: 16(0)0
Torpedo boats: 9(0)9
Sloops: 1(0)0
Frigates: 0(0)0
Moniters:0(0)0
Torpedo gunboats: 2(0)0
Gunboats 8(0)0
Patrol vessels 12(0)0
Mine sweepers 6(0)0
Minelayers 3(0)0
Mine warfare ships 4(0)0
Sub chasers 24(0)0
Motor Launches 9(0)0
Fleet Submarine: 0(0)0
Coastal Submarine:0(0)0
Floatplane carrier/tenders 0(0)0
destroyer depot ships 2(0)0
Submarine depot ships 0(0)0
Auxillary's N/A