*subject to corrections*
A. Industrial Allocation
17/31 factories (non fixed) to naval materials: 17,000 tons created for Q2/1934 plus 307 tons stockpiled from Q1/34, plus 500 tons transfered from Mexico plus 1,370 tons transfered from Colombia
Total warship materials: 19,177 (1,870 tons from foreign sources)
18,312 tons used for ship building, 865 tons stockpiled for next quarter.
10/31 factory's (fixed) to infrastructure development: 1.0 points for Q2/1934
4/31 factory's (non-fixed) to infrastructure development: 0.4 IP's for Q2/34
Total: 1.4 infrastructure points created for Q2/34
B. Infrastructure Development
0.3 points transfered to Colombia
0.3 points transfered to Byzantium
0.4 points transfered to Mexico
0.4 points put into new naval infrastructure at Palinerus
C. Naval Construction
At Cleito
Class 4 Slip #1 - CA- Daedalus laid down, 11,466 tons needed, 1,000 tons added
Class 4 Slip #2 - Battleship Philomedes building, 39,089 tons needed, 26,900 tons used, 2,000 tons added
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - MGB-32 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - MGB-33 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - MGB-34 laid down, 177 tons needed, 177 tons added
Class 0 Slip #4 - MGB-35 laid down, 177 tons needed, 177 tons added
DD's Joust, Jubilant, Judge and Juggernaut completed, begin trials
2 MTB building (MTB-202 type)
MGB's 22 through 25 begin trials
At Eridanus
Class 4 Slip #1 - CA- Laomedon laid down, 11,466 tons needed, 1,000 tons added
Class 4 Slip #2 - Battleship Eumelos building, 39,089 tons needed, 26,900 tons used, 2,000 tons added
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - CLAA Danaus building 5,695 tons needed, 600 tons used, 0 tons added, building postponed
Class 2 Drydock #1 - idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
2 MTB building (MTB-202 type)
At Duecalion
Class 3 Slip #1 - CL Acestus building, 7,963 tons needed, 3,600 tons used, 1,000 tons added
Class 3 Slip #2 - CL Brencis building, 7,963 tons needed, 3,600 tons used, 1,000 tons added
Class 3 Drydock #1- Idle
Class 2 Slip #1 - CLAA Arcesius building 5,695 tons needed, 600 tons used, 0 tons added building postponed
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 0 slip #1 - MGB-36 laid down, 177 tons needed, 177 tons added
Class 0 slip #2 - MGB-37 laid down, 177 tons needed, 177 tons added
Class 0 slip #3 - MGB-38 laid down, 177 tons needed, 177 tons added
Class 0 slip #4 - MGB-39 laid down, 177 tons needed, 177 tons added
MGB 26 through 29 begin trials
At Illissus
Class 3 Slip #1 - CA- Deiphobus laid down, 11,466 tons needed, 1,000 tons added
Class 3 Slip #2 - CL Maturin building, 7,963 tons needed, 3,600 tons used, 1,000 tons added
Class 3 Drydock #1 - BBT Aggamemnon scrapping
Class 2 Slip #1 - CLAA Callosus building 5,695 tons needed, 600 tons used, 0 tons added building postponed
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - MGB-40 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - MGB-41 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - Type 4 SC #1 laid down, 111 tons needed, 111 tons added
Class 0 Slip #4 - Type 4 SC #2 laid down, 111 tons needed, 111 tons added
Training carrier Nautica completed, begins trials
MGB 30 and MGB 31 begin trials
Midgit subs MSS-3 through 7 completed, begin trials
At Palinerus
Type 2 Drydock #1 - under construction, 3.0 IP's needed, 2.8 IP's used, 0.2 IP's added
Type 0 Drydock #1 - completed
Type 0 Drydock #2 - completed
Type 0 Drydock #3 - under construction, 1.0 IP's needed, 0.8 IP's used, 0.2 IP's added
The drydocks of this facility are to be enclosed in concrete structures so as to facilitate the construction, repair and maintinence of submarines.
At Phelleus
Class 3 Slip #1 - CL Promethius building, 7,963 tons needed, 3,600 tons used, 1,000 tons added
Class 3 Slip #2 - CA- Aeneas laid down, 11,466 tons needed, 1,000 tons added
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Type 4 SC #3 laid down, 111 tons needed, 111 tons added
Class 0 Slip #2 - Type 4 SC #4 laid down, 111 tons needed, 111 tons added
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Midgit subs MSS-8 through 12 completed, begin trials
At Lycabettus type 4 port (8/9)
Class 2 Slip #1 - CLAA Alcestus building 5,695 tons needed, 600 tons used, 0 tons added building postponed
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - DD Junta launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #2 - DD Jupiter launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #3 - DD Jury launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #4 - DD Justice launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Drydock #1 - Idle
At Maracaibo type 3 port (5/7)
Class 3 Drydock #1 - Idle
Class 1 Slip #1 - DD San Jacinto building, 1,583 tons needed, 800 tons used, 400 tons added
Class 1 Slip #2 - DD San Onofre building, 1,583 tons needed, 800 tons used, 400 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - 2 type 2 motor launches building
Class 0 Slip #2 - 2 type 2 motor launches building
Class 0 Slip #3 - Type 4 SC #5 laid down, 111 tons needed, 111 tons added
Class 0 Slip #4 - Type 4 SC #6 laid down, 111 tons needed, 111 tons added
3 MTB building (MTB-202 type)
At Safi type 2 port (4/5)
Class 2 Drydock #1 - 3 MTB building (MTB-202 type)
Class 1 Slip #1 - 3 type 2 motor launches building
Class 1 Slip #2 - 3 type 2 motor launches building
Class 1 Drydock #1 - Idle
Class 0 Slip #1 - Type 4 SC #7 laid down, 111 tons needed, 111 tons added
Class 0 Slip #2 - Type 4 SC #8 laid down, 111 tons needed, 111 tons added
Class 0 Slip #3 - Type 4 SC #9 laid down, 111 tons needed, 111 tons added
Class 0 Slip #4 - Type 4 SC #10 laid down, 111 tons needed, 111 tons added
Launched ships/freefloating ships being completed:
4 J class DD's building
Ships completed and on trials:
BB's Memnon and Emathion complete trials
Training carrier Nautica begins trials
DD's Joust, Jubilant, Judge and Juggernaut begin trials
10xMGB type 1 begin trials
10xMGB complete trials
Summary of ship building/repairs/rebuilds and convertions.
2 Eumelos class battleships building (4,000 tons)
4 Daedalus class CA's laid down (4,000 tons)
4 Acestus class CL's building (4,000 tons)
4 Magnus class CLAA's building suspended (0 tons)
4 J class DD's building (1,532 tons)
2 J class DD's building for Colombia (800 tons)
10 MGB-1 class Motor gunboats built (1,770 tons)
10 Type 4 Subchasers laid built (1,110 tons)
10 motor launchs built (600 tons)
10 MTB-202 class Motor Torpedo Boats built (500 tons)
D. Transactions
0.3 IP's transfered to Byzantium
0.3 IP's transfered to Colombia
0.4 IP's transfered to Mexico
1,120 tons transfered from Colombia for 2 DD's
500 tons transfered from Mexico for purchase of BB Poseidon
E. Other Notes
BBT Aggamemnon scrapping
Magnus class CLAA building suspended pending redesign
F. Miscellaneous Works
Developement: Port of Palinerus begins construction of a new Submarine building and repair base
0.5 points used. One Type 2 Drydock and three type 0 drydocks under construction. Drydocks are part of hardened concrete structure used to repair, replenish and maintain submarines of various types.
G. Updated Order of Battle, 10/1/33
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................10(0)2
Battlecruisers:.............................2(0)0
CV:............................................3(0)0
Training battleship:......................0(0)0
Training CV's:..............................1(0)1
Training cruisers:.........................2(0)0
CA:............................................8(0)4
Escort Cruisers:...........................2(0)0
CL:............................................38(0)8
DD: type A................................16(0)0
DD: type B................................128(0)8
Torpedo boats:...........................N/A
Moniters:...................................2(0)0
Fleet Submarine:........................32(0)0
Coastal Submarine:.....................84(0)0
Mini subs...................................12(0)0
Experimental submarine:..............1(0)0
Non-Treaty Limited Ships
DDE: (type C/ escorts).................70(0)0
Sloops:.......................................N/A
Frigates:.....................................8(0)0
Corvettes:...................................N/A
Torpedo gunboats:......................32(0)0
Gunboats:.................................12(0)0
Patrol vessels:...........................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0
Sub chasers:.............................312(0)10
Coastal Motor Torpedo Boats:.....80(0)0
Motor Gunboats:..........................30(0)10
Motor Torpedo Boats:................210(0)10
Motor Launchs:.........................170(0)10
Motor Launchs/minlayers:..........40(0)0
Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)0
Small craft depot ships:..............4(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0
Landing Craft Infantry:................80(0)0
Landing Craft Mechanized..........20(0)0
landing Craft Tank.....................10(0)0
Infantry launches:......................38(0)0 *18 transfered to Byzantean fleet