Yugoslavia 4Q49 Sim Report
A. Factories
Factories : 2
Producing Warship Material : 2
Tonnage Produced : 2,000
Producing Infrastructure (Committed) : 0
Producing Infrastructure (Non - Committed) : 0
Infrastructure Points Produced : 0.00
Bonus IP for Committed Factories : 0.00
Total IP Available : 0.00
Tonnage Produced : 2,000
Tonnage Transferred In : 0
Tonnage Received in Payment : 0
Tonnage Reclaimed From Scrap : 0
Tonnage Previously Stockpiled : 381
Total Tonnage Available : 2,381
Tonnage Paid : 0
Tonnage Used in Construction : 2,310
Tonnage Remaining for Stockpile : 71
B. Infrastructure Development
At Bar: None
At Belgrade: None
C. Naval Development and Construction
At Bar:
Dock No.1 (Type 2.0): Project 1949 Beta – Frigate C – Laid down 1 July 1949; requires 1,460 tons, 365 tons previously committed; receives 365 tons, 730 tons remaining. Launched 16 November 1949.
Dock No.2 (Type 0.0): Idle
Slip No.1 (Type 1.5): Project 1949 Beta – Frigate D – Laid down 1 July 1949; requires 1,460 tons, 365 tons previously committed; receives 365 tons, 730 tons remaining. Launched 16 November 1949.
Slip No.2 (Type 0): Idle
Slip No.3 (Type 0): Idle
Dockside:
Project 1949 Beta Frigate A – Launched 31 May 1949; requires 1,460 tons, 1,095 tons previously committed; receives 365 tons, 0 tons remaining. Completed 16 November 1949 and commissioned as Belava.
Project 1949 Beta – Frigate B – Launched 31 May 1949; requires 1,460 tons, 1,095 tons previously committed; receives 365 tons, 0 tons remaining. Completed 16 November 1949 and commissioned as Devica.
Project 1949 Theta - Minesweeper C – Launched 6 September 1949; requires 450 tons, 225 tons previously committed; receives 225 tons, 0 tons remaining. Completed 28 November 1949 and commissioned as Paučko.
Project 1949 Theta - Minesweeper D – Launched 6 September 1949; requires 450 tons, 225 tons previously committed; receives 225 tons, 0 tons remaining. Completed 28 November 1949 and commissioned as Humci.
At Belgrade:
Dock No.1 (Type 0): Idle
Slip No.1 (Type 0): Idle
Pierside
At Durres:
Floating Dock No.1 (Type 1.0): - Idle
At Kotor:
Floating Dock No.1 (Type 0.0) - Idle
Small Craft Construction
None
D. Transactions
Submarine A ordered from French shipyard. Projected to lay down 1 October 1949. Cost 450 tons plus 50 tons for design/development/overhead. Light tonnage 450 tons of which 400 tons paid this quarter.
E. Refits
None
Ships Laid Down This Quarter
At Bar:
Noe
At Belgrade:
None
Foreign Yards:
Submarine A
Ships Launched This Quarter
At Bar:
Project 1949 Beta - Frigate C
Project 1949 Beta - Frigate D
At Belgrade:
None
Ships Completed This Quarter
At Bar:
Project 1949 Beta - Frigate A - Belava
Project 1949 Beta - Frigate B – Devica
Project 1949 Theta - Minesweeper C - Paučko
Project 1949 Theta - Minesweeper D - Humci
At Belgrade:
None
Ships Undergoing Trials
Project 1949 Beta - Frigate A - Belava
Project 1949 Beta - Frigate B – Devica
Project 1949 Theta - Minesweeper C - Paučko
Project 1949 Theta - Minesweeper D – Humci
Ships Completing Trials
Project 1948 Alpha - Auxiliary C - Rama
Project 1948 Alpha - Auxiliary D – Sana
F. Scrappage Report
None
Updated Order of Battle
Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 4 + 0 + 0 + 0 = 4
Destroyer Leaders : 3 + 0 + 0 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Frigates : 0 + 2 + 2 + 0 = 4
Escort Sloops : 8 + 0 + 0 + 0 = 8
Corvettes : 8 + 0 + 0 + 0 = 8
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Gunboat-Minelayers : 2 + 0 + 0 + 0 = 2
Minecraft : 14 + 2 + 0 + 0 = 16
Motor Torpedo Boats : 36 + 0 + 0 + 0 = 36
Fleet Tender : 2 + 0 + 0 + 0 = 2
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Ammunition Auxiliaries : 4 + 0 + 0 + 0 = 4
Landing Ships : 8 + 0 + 0 + 0 = 8
Netlayers : 4 + 0 + 0 + 0 = 4
Riverine Monitors : 8 + 0 + 0 + 0 = 8
River Tugs : 2 + 0 + 0 + 0 = 2