German Naval Developments - Q4/21
A. Industrial Allocation
5/11 factories to naval materials; 5,000 t created, plus a stockpile of 768 t for 5768 tons. 5041 t of which is used, while 727 t is stockpiled.
2/11 factories (committed) to infrastructure development, produce their bonus pts this turn.
4/11 factories (non-committed) to infrastructure development; total 0.8 infrastructure points produced
B. Infrastructure Development
0.8 pts are used to further a Type 1 DD at Cuxhaven; 2.0 pts installed to date, completing the job.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock:
1 Type 1 slip: idle
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle
At Bremerhaven
1 Type 2 slip:
1 Type 1 slip: idle
1 Type 1 drydock: idle
1 Type 0 slip: idle
Free-floating: CL
Emden receives 1,110 t, to complete 1/6/22
At Cuxhaven
1 Type 3 slip: idle
1 Type 3 drydock:
1 Type 2 slip: CL
Munchen receives 1,110 t, to complete 1/9/22; ship launched 15/12/21
1 Type 1 slip: idle
1 Type 0 slip: idle
At Kiel
1 Type 2 drydock: PD
Schliesen refitting, receives 1,371 t, completed 11/21
1 Type 1 slips: idle
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle
Commericial shipyards build three 150 t coastal minesweepers.
D. Transactions
As per the Kobe Protocol, 1,000 t of warship material are delivered to Japan as compensation for the loss of the
Augsburg . This material will be available in Q1/22. In total, Germany owed 4,000 t of material to Japan; this obligation is now completed.
E. Other Notes
Markgraf ’s shakedown cruise will last into early 1922.
F. Updated Order of Battle, 31/12/21
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(1)+0
CL: 8(1)+2
DD: 24
Note: PD = pre-dreadnought