I had to lament that the timetable for the 25% life-extension refits for CV Talwar and Val, 1948-9, is probably just too soon to capture a proper angled deck, meaning they'll be back in the shop just a few years later for another 25% refit.
With all my core build and refit needs penciled in, I see I have around 25,000 t unallocated for 1946-9. I'm open to suggestions here.
As a matter of curiosity, my long, long, long-range plan suggests that Bharat's carrier force in 1960 will be:
-Talwar (16,000 t LD) in a training capacity
-Val (16,000 t) as an ASW/reserve carrier
-Bagh Nakh (27,000 t) as strike carrier
-CV1945 (40,000 t) as strike carrier
-CV1950 (40,000 t) as strike carrier
-CV1955 (~50,000 t) just finishing construction
Anyway, just blabbering here.