You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, October 13th 2015, 4:55pm

Chile, Q2/1946



Industrial Allocation
- 8/9 factories producing 8,000t materials.
- 1,574 tons from stockpile.
- 716 tons from scrapping
- 10,290 tons materials total.
- 9,200 tons used.
- 1,090 tons stored for Q3/46.
- 0/9 factories dedicated to infrastructure.

Infrastructure Development
1 factory dedicated to producing infrastructure. 0.1 IP created, added to lengthen S1 slip in Talcahuano.

Naval Construction
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Light Cruiser Picunches refitting between October 1st 1945 and July 3rd, 1946. 4598 tons required to complete. 1500 tons added Q2/46 for a total of 4500 / 4598 tons. 98 / 4598 tons remaining.
S3.5: CLAA-16 Araucanía laid down January 1st, 1946. 1,500 tons added Q2/46 for a total of 3000 / 8000 tons. 5000 / 8000 tons remaining. Ship launched July 25th, 1946 and completed on May 31st, 1947.
D2.5: Destroyer Torres del Paine refitting between April 1st 1946 and June 28th. 1945. 676 tons required to complete. 676 tons added Q2/46 for a total of 676 / 676 tons. 0 / 676 tons remaining. Refit completed.
S2.5: CLAA-17 Los Lagos laid down January 1st, 1946. 1,500 tons added Q2/46 for a total of 3000 / 8000 tons. 5000 / 8000 tons remaining. Ship launched July 25th, 1946 and completed on May 31st, 1947.
D2: Destroyer Teniente Ibarra refitting between April 1st 1946 and June 19th. 1945. 362 tons required to complete. 362 tons added Q2/46 for a total of 362 / 362 tons. 0 / 362 tons remaining. Refit completed.
S1: Expanding to S1.5, 0.2 of 0.5 IP added at the end of quarter. 0.3 IP remaining.
D0: Idle.

Dockside:
- PA-04 Patria laid down July 1st, 1944. 2,200 tons added Q2/46 for a total of 17600 / 20000 tons. 2400 / 20000 tons remaining. Ship launched June 18th, 1945 and completed on December 1st, 1946.
- Dock landing ship Disembarkment of Pisagua laid down April 2nd, 1945. 5250 tons required. 850 tons added Q2/1946 for a total of 5250 / 5250. Ship launched September 21st, 1945 and completed on June 8th, 1946.

ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Idle.
S1: Idle.
D1: Destroyer Teniente Requelme refitting between April 1st 1946 and June 19th. 1945. 362 tons required to complete. 362 tons added Q2/46 for a total of 362 / 362 tons. 0 / 362 tons remaining. Refit completed.

Dockside:
N/A

ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Idle.
S0: Submarine chaser Cisnes laid down April 1st, 1946. 250 tons added Q2/1946 for a total of 250 / 250. Ship launched May 20th, 1946. Ship completed on August 8th, 1946.

Dockside:
- Submarine chaser Azopardo laid down January 1st, 1946. 0 tons added Q2/1946 for a total of 250 / 250. Ship launched February 20th, 1946. Ship completed on May 8th, 1946.

ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle.

Dockside:
None

from factories:
- N/A

On Trials
- Cruiser O'Higgins continues six months of builders trials.
- Submarine Marlin completes six months of builders trials.
- Submarine Esturión completes six months of builders trials.
- Submarine Bonito completes six months of builders trials.
- Subchaser Tinguiririca completes three months of builder's trials.

Scrapping
- Total tonnage in recycling until Q1/46: (2x179) = 352 tons
- Total tonnage in recycling until Q2/46: (4x179) = 716 tons

Transactions
None

Other Notes
Technology development and investigatory committees are working on the following projects:
- Proyecto-O: Proposed replacement for Marina Guardia Hyatt.

Six destroyers (Reserve Hull 011 through Reserve Hull 016) are disarmed and parked in Talcahuano awaiting free drydocks for scrapping.

Order of Battle (Armada de Chile) June 30th, 1946
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Primary Combatants:
Battlecruisers: 3(0)+0
Aircraft Carriers: 3(0)+1
Heavy Cruiser: 3(0)+0
Light Cruisers: 6(0)+2
Helicopter Cruisers: 1(0)+0
Large Destroyers: 8(0)+0 {3,000 tons std and up}
Medium Destroyers: 50(0)+0 {1,200-3,000 tons std}
Light Destroyers (Corvettes): 8(0)+0 {under 1,200 tons std}
Destroyer Escorts: 14(0)+0
Minelayer: 2(0)+0
Torpedo Boats: 25(0)+0
Submarines: 11(0)+0
Subchasers: 20(0)+1
Minesweepers: 27(0)+0
Arctic Patrol Vessel: 3(0)+0

Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0

Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0

Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Landing Ship Dock: 0(0)+1
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 2(0)+0
Landing Craft Tank: 2(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0

Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 12(0)+0
Museum Ships: 1(0)+0

Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)