Dear visitor, welcome to WesWorld.
If this is your first visit here, please read the Help. It explains in detail how this page works.
To use all features of this page, you should consider registering.
Please use the registration form, to register here or read more information about the registration process.
If you are already registered, please login here.
Italy Q1/1939
[SIZE=5]Report on Italian naval construction Q1 1939[/SIZE]
Available Factories; 13.5 producing 13,500tons of warship material, 10 dedicated to producing IP, producing 1.0IP
[SIZE=4]Ships under construction[/SIZE]
|
Source code
|
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
|
Ship Name:Andrea Doria
Laid down:01/01/39 Completion:07/11/42 Launched:16/07/40
Amount built:0 Amount added:3000 Amount Needed:34879
Ship Name:Roma - Completed
Laid down:01/01/35 Completion:10/01/39 Launched:11/08/36
Amount built:40026 Amount added:0 Amount Needed:0
Ship Name:Tripolitania
Laid down:01/01/37 Completion:17/05/41 Launched:01/10/38
Amount built:20000 Amount added:2000 Amount Needed:22236
Ship Name:Cirenaica
Laid down:01/01/37 Completion:17/05/41 Launched:01/10/38
Amount built:20000 Amount added:2000 Amount Needed:22236
Ship Name:Cavour - Completed
Laid down:01/01/36 Completion:20/02/39 Launched:03/04/37
Amount built:29201 Amount added:0 Amount Needed:0
Ship Name: Cacciatorpidiniere Pesante x 4
Laid down:01/01/39 Completion:01/02/40 Launched:08/06/39
Amount built:0 Amount added:0 Amount Needed:4224
Ship Name: 1938 Type Frigate x 6
Laid down:01/01/39 Completion:04/11/39 Launched:04/05/39
Amount built:0 Amount added: Amount Needed:1253
Ship Name: 1938 Type Dragamine x 4
Laid down:01/01/39 Completion:04/11/39 Launched:04/05/39
Amount built:0 Amount added:404 Amount Needed:0
|
OTO La Spezia
1 Type 3 Slipway Cacciatorpidiniere Pesante
1 Type 3 Slipway Cacciatorpidiniere Pesante
1 Type 3 Drydock
1 Type 3 Drydock
1 Type 1 Slipway 1938 Type Frigate
1 Type 1 Drydock
Orlando Taranto
1 Type 4 Slipway Andrea Doria
1 Type 4 Drydock
1 Type 3 Slipway Cacciatorpidiniere Pesante
1 Type 3 Drydock
1 Type 3 Drydock
1 Type 1 Slipway 1938 Type Frigate
1 Type 1 Drydock
Tripolitania
Roma - Completed
Napoli di Castellammare
1 Type 3 Slipway Cacciatorpidiniere Pesante
1 Type 3 Drydock
1 Type 1 Slipway 1938 Type Frigate
1 Type 1 Drydock
Marghera Fincantieri, Venezia
1 Type 3 Slipway
1 Type 3 Slipway
1 Type 3 Drydock
1 Type 1 Slipway 1938 Type Frigate
1 Type 1 Drydock
CRDA Trieste
1 Type 4 slipway
1 Type 4 slipway 1938 Type Dragamine x 4
Cirenaica
Cavour – Completed
Messina di Castellammare
1 Type 4 Drydock
1 Type 3 Slipway
1 Type 3 Slipway
1 Type 3 Drydock
1 Type 1 Slipway 1938 Type Frigate
Fincantieri Cagliari
Type 3 Drydock
Type 1 Drydock 1938 Type Frigate
13.5 factories produce 13.500t of material
2.000t transferred from Ethiopia
1.500t transferred from Latvia
1.208tons used from stockpile
18.208tons of material available in total
1 x Pisa Class Cruiser being reconstructed into Portaaerei – 2000t
10.616tons of material needed
New stockpile of 7.592tons
10 factories produce 1.0IP, spent on Factory 22
Factory 22 1.0IP built
[size=3]Fleet Strength[/size]
BB. 8(0)+2
CV. 12(0)+2
ACR.6(0)+0
CA. 3(0)+0
CL. 39(0)+0
CDA. 4(0)+0
DD. 74(0)+4
TB. 33(0)+0
Submarines. a) 31(0)+0
b) 107(0)+0
Escorts. 77(0)+6
MAS. 370(0)+0
[SIZE=5]Ethiopia Q1 1939[/SIZE]
2 Factories produce 2.000tons of warship materials
Massawa
1 Type 3 Drydock
1 Type 1 Slipway
1 Type 1 Drydock
Mogadishu
1 Type 1 Drydock
2.000t transferred to Italy
[size=3]Fleet Strength[/size]
1(0)+0 Cruisers
2(0)+0 Coastal Defence ships
1(0)+0 Submarine
20(0)+0 MAS
This post has been edited 1 times, last edit by "Red Admiral" (Mar 7th 2010, 3:32pm)
Basically the same ship designs as the previous year. Scaled back on naval construction in favour of growing the economy and slowly building factories.
You forgot the 1,500 tons I'm going to send you.
Originally posted by TexanCowboy
You forgot the 1,500 tons I'm going to send you.
Good point.