[SIZE=3]SAE Quarterly Reports [/SIZE]
No. 23 – July to September 1926
[SIZE=3]Transfers:[/SIZE]
None.
[SIZE=3]Factories: [/SIZE]
26 factories total can be used.
Fixed factories
9 factories will be fixed to produce infrastructure points for 1926.
Flexible factories
3917ts material transferred from Q2 (incl. material recovered from scrapyard).
16,828ts material necessary to be produced in this quarter (17 factories).
0 factory producing 0,0pts for infrastructure.
Infrastructure points used this quarter:
0,0pts put into a new Type 3 Dock in Daressalam for a total of 2,8pts at the end of Q3.
0,9pts to expand a Type 2 Dock in Port Louis for a total of 3,9pts at the end of Q3.
[SIZE=3]Ships: [/SIZE]
Minor vessels
Completed Units
4x UJ26-class ASW launch
13x Flower-class minesweeper
15x Tree-class minesweeper
12x Bush-class minesweeper
3x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops
5x River-class frigate
8x Pleiades-class light destroyers
6x Guard-class patrol crafts
4x Mimir-class floatplane carriers
On Trials
3x River-class Frigate
- Vaal running trials until July 26
- Lurio running trials until July 26
- Messalo running trials until September 26
Ordered Units
2x Bush-class minesweeper (10 month á 53ts material necessary per unit)
- Juniper laid down in Buenos Aires on a Type 0 slip in January, completed in October
- Clematis laid down in St. Helena on a Type 0 slip in June, completed in December
4x UJ26-class (1 month á 195ts material necessary per unit)
Refits
None
Scrapping
4x SL09-class (4 month total, 2 month in Type 0 dock)
- Jupiter scrapping in Cape Town starting in June, finished in September – 99ts received from hull for Q2/1927
- Mars scrapping in Durban starting in August, finished in September – 99ts received from hull for Q3/1927
- Venus scrapping in Durban starting in July, finished in September – 99ts received from hull for Q3/1927
- Mercury scrapping in Durban starting in September, finished in September – 99ts received from hull for Q3/1927
Destroyers
Completed Units
2x Bird-class torpedoboat
10x Cat-class torpedoboat
12x Hound-class torpedoboat
12x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
On Trials
1x TB16-class torpedo boat
- Ocelot running trials until July 26
2x Nymph-class destroyer
- Galene running trials until August 26
- Glaukonome running trials until August 26
Ordered Units
2x Nymph-class destroyer (Type 23 - 11 month á 127ts material necessary per unit)
- Halimene laid down in Durban on a Type 1 slip in January, completed in November
- Hippothoe laid down in Douala on a Type 1 slip in January, completed in November
6x Hound-class torpedo boat (Type 26 - 11 month á 126ts material necessary per unit)
- Beagle laid down in Majunga on a Type 1 slip in February, completed in December
- Beauceron laid down in Port Louis on a Type 1 slip in January, completed in November
- Berger Picard laid down in Montevideo on a Type 1 slip in January, completed in November
- Border Collie laid down in Buenos Aires on a Type 1 slip in January, completed in November
- Saint Bernard laid down in Buenos Aires on a Type 1 slip in March, completed in January 27
- Bobtail laid down in Mar del Plata on a Type 1 slip in May, completed in March 27
Rebuilds
2x TB16-class torpedo boat (6 month á 128ts material necessary per unit)
- Tiger entering a Type 1 dock in Montevideo in March. Leaving the dock in April, the torpedo boat will stay in the yard until August
- Jaguar entering a Type 1 dock in Buenos Aires in September. Leaving the dock in October, the torpedo boat will stay in the yard until February 27
Scrapping
8x TB13-class (4 month total, 2 month in Type 1 dock)
- Falcon scrapping in Port Elizabeth starting in December 25, finished in March 26 – 190ts received from hull for Q4/1926
- Goshawk scrapping in Daressalam starting in November 25, finished in February 26 – 190ts received from hull for Q4/1926
- Sparrow scrapping in Prince Eduard Islands starting in December 25, finished in March 26 – 190ts received from hull for Q4/1926
- Vulture scrapping in Douala starting in October 25, finished in January 26 – 190ts received from hull for Q4/1926
- Condor scrapping in Daressalam starting in February 26, finished in May 26 – 190ts received from hull for Q1/1927
- Sea Swollow scrapping in Douala starting in January 26, finished in April 26 – 190ts received from hull for Q1/1927
- Seagull sscrapping in Douala starting in February 26, finished in May 26 – 190ts received from hull for Q1/1927
- Albatross scrapping in Libreville starting in January 26, finished in April 26 – 190ts received from hull for Q1/1927
- Nighthawk scrapping in Port Elisabeth starting in March 26, finished in June 26 – 190ts received from hull for Q1/1927
Class B Cruisers
Completed Units
11x Insect-class torpedoboat
4x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
1x Aurora-class light cruiser
On Trials
None.
Ordered Units
3x CL24-class light cruiser (17 month á 465ts material necessary per unit)
- Bellona laid down in Port Elizabeth on a Type 2 slip in April 25, completed in August 26
- Carmenta laid down in Durban on a Type 2 slip in July 26, completed in November 27
- Dira laid down in Daressalam on a Type 2 slip in July 26, completed in November 27
Rebuilds
None
Scrapping
4x CL10-class (5 month total, 2 month in Type 2 dock)
- Blantyre scrapping in Montevideo starting in September 25, finished in January 26 – 574ts received from hull for Q4/1926, guns of first and second battery stored
- Pietermaritzburg scrapping in Buenos Aires starting in September 25, finished in January 26 – 574ts received from hull for Q4/1926, guns of first and second battery stored
- Beira scrapping in Mar Del Plata starting in November 25, finished in March 26 – 574ts received from hull for Q4/1926, guns of first and second battery stored
- Douala scrapping in Daressalam starting in July 26, finished in November 26 – 574ts received from hull for Q3/1927, guns of first and second battery stored
Class A Cruisers
Completed Units
1x Colony-class AC
2x General-class AC
4x Cape-class heavy cruiser
On Trials
None
Ordered Units
1x CA26-class heavy cruiser (19 month á 526ts material necessary per unit)
- Cape Infante laid down in Cape Town on a Type 3 slip in January 25, completed in July 27
Capital Units
Completed Units
2x Sao Tome-class
2x Hertog-class
4x King-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
On Trials
None
Ordered Units
2x BB24G-class (37 month á 808ts/month material necessary per unit)
- Ophion laid down on a Type 4 slip in Montevideo in January 24, completed in November 1927
- Hyperion laid down on a Type 4 slip in Durban in April 25, completed in February 29
Rebuilds
None
Scrapping
None
Coastal Defence Units
Completed Units
1x Nagelring-class
On Trials
None
Ordered Units
2x LCDS-class LCDS (11 month á 171ts material necessary per unit)
- Alswinn laid down in Durban on a Type 1 slip in March, completed in January 27
- Arwakr laid down in Cape Town on a Type 1 slip in March, completed in April 27
Carriers
Completed Units
1x Wim Kraash-class (converted freighter, rated as experimental, to be replaced by CV25B)
Ordered Units
1x CV25B-class fleet carrier (29 month á 690ts material necessary per unit)
- Hammer laid down in Durban on a Type 4 slip in January, completed in May 27
1x CV26-class fleet carrier (29 month á 690ts material necessary per unit)
- Forge laid down in Montevideo on a Type 4 slip in March, completed in July 28
Class A Submarines
Completed Units
12x E-class submarine
16x F-class submarine
4x J-class submarine
Ordered Units
None
Class B Submarines
Completed Units
14x G-class submarine
15x I-class submarine
12x H-class submarine
2x K-class submarine
On Trials
None.
Ordered Units
3x K-class submarine (10 month á 46ts material necessary per unit)
- K3 laid down in Caüe Town on a Type 2 slip in January, completed in Oktober
- K4 laid down in Cape Town on a Type 0 slip in January, completed in Oktober
- K5 laid down in Douala on a Type 0 slip in June, completed in March 27
Non-combatants
Completed Units
15x Bay-class tender (several different designs)
On Trials
None.
Ordered Units
1x TD25-class tender (12 month á 180ts material necessary per unit)
- Lambert´s Bay laid down in Daressalam on a Type 0 slip in January, completed in December
------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
40 minesweepers
61 small patrol crafts
43 TB/DDs (does not include 11 TBs with 15cm guns)
40 cruisers category b (does include 11 TBs with 15cm guns)
7 cruisers category a
14 capital units
1 experimental carrier (conversion)
43 submarines category b
32 submarines category a
4 floatplane carriers
15 armed tenders
plus numerous auxiliary vessels of all kind.