Chosen’s Naval Developments – Q1/1929
A. Industrial Allocation
1/4 factories producing warship material = 1,000 t. 0t stockpiled materials available. 1000 t are used, 0 tons materials stockpiled.
3/4 factories are dedicated to producing infrastructure material, = 0.3 pts.
B. Infrastructure Development
F1 at Agana (Guam), receives 0.3 points. Total 2.6
C. Naval Construction
Ryojun
S1: idle
D0: idle
D1: idle
Free-floating: C-D-10 receives 110 tons. Completed 6/3/1929
Dairen
D0: idle
D1: idle
D2: Brad Crawford laid down 1/1/1929. Receives 780 tons.
Free-floating: C-D-11 receives 110 tons.
D. Transactions
BC Dairen transferred from Japan to Royal Chosen Navy.
E. Other Notes
C-D-10 and C-D-11 starting shakedown cruise.
New units laid down this quarter:
Light cruiser Brad Crawford of the WSS class require 3629 tons and 13 months. (for design see report Japan)
F. Updated Order of Battle, 3/31/29
Note:
Y)+Z = completed (under repair/refit) + under construction
Battle Cruiser: 1(0)+0
Carrier: 1(0)+0
Heavy Cruiser: 1(0)+0
Armored Cruiser: 1(0)+0
1st class Cruiser: 2(0)+0
Light Cruiser: 2(0)+1
2nd class Cruiser: 3(0)+0
Protected Cruiser: 4(0)+0
Gunboats: 2(1)+0
River Gunboats: 2(0)+0
Destroyers 2nd class: 11(0)+2
Destroyers 3rd class: 6(0)+0
TPB 1st class: 6(0)+0
TPB 2nd class: 7(0)+0