You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, November 12th 2005, 1:23pm

Germany Q1, 1929

German Naval Developments – Q1/29

A. Industrial Allocation

Factory Allocation:

Warship Material: 3
Infrastructure (Committed): 23 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 0

Warship Material Produced: 3000 t
Stockpile: 524 t
Recycled Scrap: 0 t
Material Used on Construction: 2800 t
New Stockpile: 724 t

B. Infrastructure Development

Factory 27 receives 1 point, for 1 total.
Factory 28 receives 1 point, for 1 total.
Type 2 slipway at Bremerhaven upgrade to Type 3 receives 0.3 pts, for 1 total, completed.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle

At Bremerhaven

1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle

At Cuxhaven

1 Type 3 slip: CL Ersatz Amazone receives 1400t
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: Idle

At Kiel

1 Type 3 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: CL Ersatz Medusa receives 1400 t

D. Transactions

None

E. Other Notes

New Orders: CL Ersatz Amazone laid down at Cuxhaven

F. Updated Order of Battle, 31/3/29

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(0)+0
CL: 11(0)+2,
DD: 24(0)+0,
SL: 6(0)+0
AM: 10(0)+0

Note: PD = pre-dreadnought