You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, September 30th 2013, 2:41pm

Brazil, Q4/1943

[SIZE=3]Brazil, Q4/1943[/SIZE]
- 7000 tons from 7/7 factories producing naval materials
- 4739 tons from stockpile
- 760 tons from scrapping
- 0 tons from transactions
- 12499 tons total for Q3/1943
- 8202 tons used in Q4/1943.
- 4297 tons left for Q1/44.

0/7 factories committed for Quarter to infrastructure development
0/7 factories committed for Year to infrastructure development

Infrastructure Development
N / A

[SIZE=3]Naval Construction[/SIZE]

Arsenal de Marinha do Rio de Janeiro
- Class 3 Slipway: Idle
- Class 1 Slipway: Destroyer Belém laid down July 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Londrina laid down July 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Feira de Santana laid down July 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Contagem laid down October 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched February 15, 1944. Completed September 7th, 1944.
- Class 3.5 Drydock: Cruiser Amazonas scrapping. 545 tons to be recovered. Ship requires 4.2 months to scrap. 156 tons recovered in Q4/1943.
- Class 3 Drydock: Cruiser Bahia continues reconstruction. 1580 tons required. 750 tons added in Q4/1943 for a total of 1500/1580 tons. 80 tons remaining until completion. Ship requires 6.1 months to reconstruct. Reconstruction completed January 4th, 1944.

Dockside:
- CL Mosqueteiro begins Level 1 refit (to install dradis) on October 1st, 1943. 496 tons required. 496 tons added Q4/1943 for a total of 496/496 tons. 0 tons remaining until completion. Refit requires 0.95 months to complete. Refit completes October 30th, 1943.
- Destroyer Niterói laid down January 1st, 1943. 2,200 tons required. 250 tons added Q4/1943 for a total of 2200/2200 tons. 0 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Destroyer Uberlândia laid down January 1st, 1943. 2,200 tons required. 250 tons added Q4/1943 for a total of 2200/2200 tons. 0 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Destroyer Teresina laid down January 1st, 1943. 2,200 tons required. 250 tons added Q4/1943 for a total of 2200/2200 tons. 0 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Destroyer Fortaleza laid down April 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.

Arsenal de Marinha do Macapa
- Class 1 Slipway: Patrol Craft Beberebi laid down October 1st, 1943. 108 tons needed to complete. 108 tons added Q4/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on October 31st, 1943.
- Class 1 Slipway: Patrol Craft Grajaú laid down October 1st, 1943. 108 tons needed to complete. 108 tons added Q4/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on October 31st, 1943.
- Class 1 Slipway: Idle
- Class 1 Slipway: Idle
- Class 1 Slipway: Destroyer Maceió laid down October 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched February 15, 1944. Completed September 7th, 1944.
- Class 1 Slipway: Destroyer Belford Roxo laid down October 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched February 15, 1944. Completed September 7th, 1944.
- Class 0 Drydock: Idle

Dockside:
- Destroyer Campinas laid down April 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Destroyer Recife laid down April 1st, 1943. 2,200 tons required. 650 tons added Q4/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.

Arsenal de Marinha do Manaus
- Class 0 Slipway:
- Class 0 Slipway: Idle
- Class 0 Drydock: 70 ton river patrol craft BPR-07 laid down October 1st, 1943. 70 tons added. Launched complete on October 31st, 1943.
- Class 0 Drydock: 70 ton river patrol craft BPR-08 laid down October 1st, 1943. 70 tons added. Launched complete on October 31st, 1943.

Dockside:
- River hospital ship Oswaldo Cruz (NAH-2) laid down July 1st, 1943. 250 tons required. 0 tons added Q4/1943 for a total of 250/250 tons. 0 tons remaining until completion. Ship requires 4.25 months to construct. Launched August 20th, 1943. Completed November 10th, 1943.

On Trials:
Submarines B-6, B-7, and B-8 complete trials.
Hospital ship Compaixao completes trials.
River tanker Potengi completes trials.
River construction ship Caboclo completes trials.

Transactions
- None

Scrapping
- 1x Amazonas-class cruiser scrapping. (1x389=389t)

760 tons in recycling until Q4/1943.
254 tons in recycling until Q1/1944.
389 tons in recycling until Q2/1944.
156 tons in recycling until Q3/1944.

[SIZE=3]Order of Battle[/SIZE]
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

The Fleet
Battleships: 1(0)+0
Aircraft Carriers: 4(0)+0
Battlecruisers: 2(0)+0
Light Cruisers: 9(1)+0
Destroyers: 26(0)+9
Submarines: 36(0)+0
Patrol Craft: 8(0)+0
Gunboats: 0(0)+0
Minelayers: 0(0)+0
Minesweepers: 20(0)+0

Fleet Train
Oilers: 3(0)+0
Tenders: 1(0)+0
Training Ships: 1(0)+0

Riverine Forces
River Gunboats: 8(0)+0
Barracks Ship: 1(0)+0
River Construction Tender: 1(0)+0
River Hospital Ship: 2(0)+0