*Edited for scrapping of Muin-I-Zaffer, Marmaris and Malatia*
A. Industrial Allocation
1/6 factories (non-fixed) to naval materials: 1,000 tons created for Q3/1928 + 450 tons stockpiled from Q2/28 = 1,450 tons, 1203 tons used, 247 tons stockpiled for next quarter
2/6 factories (fixed) to infrastructure development: 0.2 points for Q2/1928
3/6 factories (non-fixed) to infrastructure development: 0.3 points for Q2/1928
Total 0.5 points created for Q2/28
B. Infrastructure Development
0.0 points put into new factory # 7, 9.2 points needed, 0.8 points used, 0.0 points added, construction suspended
0.2 points added to new type 1 slip at Izmit
0.2 points added to upgrade of type 0 drydock at Samsun
0.1 points added to two type 0 slips at Icel upgrading to type 1 slips
C. Naval Construction
Istambul Type 2 port (4/5)
type 3 drydock #1 - Torpedo boat Giresun laid down, 601 tons needed, 200 tons added
type 1 drydock #1 - Torpedo boat Gümüshane laid down, 601 tons needed, 200 tons added
type 0 slip #1 - Idle
type 0 slip #2 - Idle
Izmit Type 3 Port
type 3 drydock #1 - Torpedo boat Çankırı building, 601 tons needed, 400 tons used, 150 tons added
type 1 drydock #1 - Idle
type 1 slip #1 construction begins, 1.0 points needed, 0.2 points added
Samsun
type 3 drydock #1 - Torpedo boat Düzce launched, 601 tons needed, 400 tons used, 150 tons added
type 0 drydock #1 - upgrading to type 1 drydock, 1.0 points needed, 0.3 points used, 0.2 points added
type 0 drydock #2 - Muin-I-Zaffer scrapping
Icel Type 1 Port (3/3)
type 1 slip #1 - completed Torpedo boat Hakkari laid down, 601 tons needed, 200 tons added
type 0 slip #2 - upgrading to type 1 slip, 0.5 points needed, 0.4 points used, 0.1 points added
type 0 drydock #1 - Idle
Trabzon Type 1 port (1/3)
type 1 drydock #1 -Torpedo boat Elazığ launched, 601 tons needed, 400 tons used, 150 tons added
Launched ships being completed:
3xAgri class Torpedo Boats, Agri, Ardahan and Balýkesir601 tons needed, 550 tons used, 51 tons added to each
3xAgri class Torpedo Boats building, Çankırı, Düzce, Elazığ 601 tons needed, 400 tons used, 150 tons added to each
Ships completed and on trials
Protected Cruiser Ulic Ali Reis completes trials end of quarter
Protected Cruiser Hamidieh completes trials end of quarter
Protected Cruiser Medjidieh completes trials end of quarter
4x Timsah class Minelayers Timsah, Reshanieh, Malatia and Idjlalieh on trials
Summary of ship building/repairs/rebuilds and convertions.
3xAgri class Torpedo Boats, Giresun, Gümüshane, Hakkari laid down
D. Transactions
None
E. Other Notes
4x Timsah class Minelayers, Timsah, Reshanieh, Malatia and Idjlalieh complete trials end of quarter
Armoured cruiser Muin-I-Zaffer officially begins scrapping at Samsun
Gunboats Marmaris and Malatia , beached at Samsun, scrapping
F. Updated Order of Battle, 1/4/27
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 2(0)0 *Hairedin Babarossa (Dante Alighieri) leased from Italy*
BC: 1(0)0
PD: 2(0)0
AC: 1(0)0 *San Marco leased from Italy*
CA: 1(0)0
PC: 2(0)0
CL: 4(0)0
DD: 16(0)0
Torpedo boats: 6(0)9
Sloops: 1(0)0
Frigates: 0(0)0
Moniters:0(0)0
Torpedo gunboats: 2(0)0
Gunboats 8(0)0
Patrol vessels 12(0)0
Mine sweepers 6(0)0
Minelayers 3(0)0
Mine warfare ships 4(0)0
Sub chasers 24(0)0
Motor Launches 9(0)0
Fleet Submarine: 0(0)0
Coastal Submarine:0(0)0
Floatplane carrier/tenders 0(0)0
destroyer depot ships 2(0)0
Submarine depot ships 0(0)0
Auxillary's N/A