A. Industiral Allocation
9/11 factories (non-fixed) to naval materials: 9000 tons created for Q4/1947
2/11 factories (fixed) to infrastructure materials: 0.2 pts created for Q4/1947
Stockpile after Q3/1947: 1472 tons
used for Transaction: 0 tons
received from others: 0 tons
warmaterial recycling: 0 tons (first quarter)
warmaterial recycling: 0 tons (second quarter)
Summary:
9000 tons (manufactured) + 1472 tons (stockpiled) + 0 tons (recycled) - 0 tons (transaction) + 0tons (received) = 10472 tons
used at Tianjin: 3334 tons
used at Shanghai: 802 tons
used at Zhanjiang: 1004 tons
used at Kao-hsiung: 524 tons
used at Taipei: 1904 tons
used at Mako: 457 tons
used at Dairen: 314 tons
used for small vessels: 0 tons
Stockpile after Q4/1947: 2133 tons
B. Infrastructure Development
C. Naval Construction
Built Type 0 Slip at Mako 0.4 pts needed; 0.2 pts. Received
Bohai Shipbuilding at Tianjin:
S2 - #1: not in use
S1 - #1:
U-107 ; Guiyu-Class; 1504tons needed; 500tons received
S1 - #2:
U-108 ; Guiyu-Class; 1504tons needed; 500tons received
S0 - #1:
HICMS Hai Ou-7; 511tons needed; 255tons received
S0 - #2:
HICMS Hai Ou-8; 511tons needed; 255tons received
S0 - #3:
HICMS Hai Ou-9; 511tons needed; 255tons received
S0 - #4:
HICMS Hai Ou-10; 511tons needed; 255tons received
D2 - #1:
U-109 ; Guiyu-Class; 1504tons needed; 500tons received
D1 - #1:
U-110 ; Guiyu-Class; 1504tons needed; 500tons received
D0 - #2: not in use
Freefloating / in completation:
Xia-Class (reserved name "Yaofeng"); 314tons needed; 314tons received; finished start trials
Kiangnan Dock & Engineering Works at Shanghai:
S2 - #1: not in use
S1 - #1:
HICMS Houbei-1; 1158tons needed; 300tons received
S0 - #1:
HICMS Linchong-2; 451tons needed; 251tons received
S0 - #2:
HICMS Linchong-3; 451tons needed; 251tons received
D4 - #1: not in use
D2 - #1: not in use
Freefloating / in completation:
Hudong-Zhonghua Shipbuilding at Zhanjiang:
S1 - #1:
HICMS Houbei-2; 1158tons needed; 300tons received
S0 - #1:
HICMS Luhai-9; 202tons needed; 202tons received; finished start trials
S0 - #2:
HICMS Luhai-10; 202tons needed; 202tons received; finished start trials
D1 - #1:
HICMS Houbei-3; 1158tons needed; 300tons received
Freefloating / in completation:
Waigaoqiao Shipbuilding at Kaoshiung:
D0 - #1:
HICMS China – 2; 462tons needed; 262tons received
D0 - #2:
HICMS China – 3; 462tons needed; 262tons received
D1 - #1: not in use
Freefloating / in completation:
Quindao Beihai Shipbuilding at Taipei:
S0 - #1:
HICMS Luhai-7; 202tons needed; 202tons received; finished start trials
S0 - #2:
HICMS Luhai-8; 202tons needed; 202tons received; finished start trials
D2 - #1: not in use
D3 - #1: Refit
BC Liu Xing; 1500tons needed; 1500tons received; finished start trials
Freefloating / in completation:
Sun Yat Sen Shipbuilding at Mako:
S0 - #1:
HICMS Luhai-6; 202tons needed; 202tons received; finished start trials
S0 - #2:
HICMS Hai Ou-6; 511tons needed; 255tons received
S0 - #3;
building
D0 - #1: not in use
Freefloating / in completation:
Zjiangjin Shipbuilding at Dairen:
D0 - #1: not in use
D1 - #1: not in use
D2 - #1: not in use
Freefloating / in completation:
Xia-Class (reserved name "Suhitou"); 314tons needed; 314tons received; finished start trials
D. Transactions
Export: 0 tons
Import: 0 tons
Conversion:
E. Other Notes
stored guns:
F. Small vessels
Small vessels built by factories:
Small vessels built in drydocks:
G. Shakedown cruises
small trials = 3 month:
great trials (ships over 500tons) = 6 month:
start trials:
CL Suhitou
CL Yaofeng
HICMS Luhai-6
HICMS Luhai-7
HICMS Luhai-8
HICMS Luhai-9
HICMS Luhai-10
BC Liu Xing
in trials:
BC Tai-Pei
finished trials:
HICMS Huangfen 622
HICMS Huangfen 623
HICMS Huangfen 624
HICMS Huangfen 625
taken in service:
HICMRV Nanjizhou
##################################
Hope there is no fault ... OOB is in work
##################################