Edited to fix error's
A. Industrial Allocation
15/30 factories to naval materials: 15,000 tons created for Q4/1925 plus 24 tons stockpiled from Q4/25 for 15,024 total tons.
14,892 tons used for ship building, 132 tons stockpiled for next quarter.
15/30 factories (fixed) to infrastructure development: 1.5 points for Q4/1925
B. Infrastructure Development
1.5 points added to ports at Cleito, Illissus and Phelleus.
0.5 points added to 1 type 1 slip at Cleito
0.5 points added to 1 type 1 slip at Illissus
0.2 points added to 1 type 0 slip at Illissus
0.3 points added to 1 type 0 slip at Cleito
C. Naval Construction
At Cleito Type 4 port (7/9)
Class 4 Slip #1 -CV Alioth building, 1000 tons used, 1000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - BB Aggamemnon converting to Gunnery training ship, 4450 tons needed, 10150 tons used, 1000 tons added in Q4/24
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - SS R-62 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #2 - SS R-63 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #3 - SS R-64 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 slip #4 -under construction, 0.5 points used
At Eridanus Type 4 port (8/9)
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - MS-20 building. 355 tons needed, 200 tons used, 200 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
At Duecalion type 3 port (6/7)
Class 3 Slip #1 - CL Ares laid down, 1000 tons added
Class 3 Slip #2 - CL Oceanus laid down, 1000 tons added
Class 3 Drydock #1 - AC Cape Verde converting to training ship, 4800 tons needed, 3903 tons used, construction halted
Class 2 Slip #1 - MS-21 building. 355 tons needed, 200 tons used, 200 tons added
Class 2 Slip #1 - MS-22 building. 355 tons needed, 200 tons used, 200 tons added
Class 2 Drydock #1 - Idle
3x115 ton E class subchaser/patrol boats also being constructed.
At Illissus type 3 port (7/7)
Class 3 Slip #1 - CA Astyanax, 5,696 tons needed, 5000 tons used, 1000 tons added.
Class 3 Slip #2 - CA Sarpedon, 5,696 tons needed, 5000 tons used, 1000 tons added.
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - MS-23 building, 355 tons needed, 200 tons used, 200 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 slip #2 - under construction, 0.5 points used
Class 0 Slip #1 - Idle
Class 0 slip #2 - under construction, 0.2 points used
3x115 ton E class subchaser/patrol boats also being constructed.
At Phelleus type 5 port (9/11)
Class 3 Slip #1 - CL Persephone laid down, 1000 tons added
Class 3 Slip #2 - CL Artemis laid down, 1000 tons added
Class 3 Drydock #1 - AC Venezuela converting to training ship, 4800 tons needed, 3903 tons used, construction halted
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - SS R-65 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #2 - SS R-66 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #3 - SS R-67 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Under construction, 0.3 points used
3x115 ton E class subchaser/patrol boats also being constructed.
At Lycabettus type 4 port (8/9)
Class 2 Slip #1 -MS-24 building, 355 tons needed, 200 tons used, 200 tons added
Class 2 Slip #2 - MS-25 building, 355 tons needed, 200 tons used, 200 tons added
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - SS R-68 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #2 - SS R-69 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #3 - Idle
Class 1 Drydock #1 - Idle
3x115 ton E class subchaser/patrol boats also being constructed.
At Maracaibo type 3 port (5/7)
Class 3 Drydock #1 - Idle
Class 1 Slip #1 - SS R-70 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #2 - SS R-71 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #3 - MPSS ship Efficax building, 6473 tons needed, 1441 tons used, 1000 tons added
Class 1 Slip #4 - Idle
At Safi type 2 port (4/5)
Class 2 Drydock #1 - Idle
Class 1 Slip #1 -SS R-72 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Slip #2 - SS R-73 laid down, 260 tons needed, 150 tons used, 160 tons added
Class 1 Drydock #1 - Idle
Launched ships being completed:
CA's Menelaus and Peleus freefloating, 696 tons needed, 10,000 tons used, 696 tons added
MPSS ship Patronus freefloating, 1,000 tons needed, 6914 tons used, 1000 tons added in Q4/25
Ships completed and on trials
DD's Goshawk, Greyhound, Grenade, Grey, Goldfinch, Gladiator, Gambler and Gazelle completed
Mine sweepers MS-14-19
Summary of ship building/repairs/rebuilds and convertions.
BB Aggamemnon converting to gunnery training ship
AC's Cape Verde and Venezuela converting to training ships, work suspended.
CV Alioth building
CA's Astyanax and Sarpedon building
CA's Menelaus and Peleus fitting out
4xAres class CL's laid down
12xR-62 class coastal subs building
MPSS Patronus building
MPSS Efficax building
12 E class sub chasers building
D. Transactions
None.
E. Other Notes
BB Aggamemnon and AC's *Cape Verde and *Venezuela converting to gunnery training ships.
*conversions susspended
CVX Evamon scrapping
Brencis class scout cruisers scrapping
Nereus class CL's scrapping
F. Updated Order of Battle, 1/1/26
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 9(1)0
BC: 2(0)0
CV: 3(0)1
CA: 10(0)4
CAE:0(0)0
CL: 49(0)4
DD: 138(0)0
Torpedo boats: N/A
Sloops: N/A
Frigates: N/A
Moniters:2(0)0
Torpedo gunboats: 32(0)0
Gunboats 12(0)0
Patrol vessels 50(0)0
Mine sweepers 18 (0) 6
Sub chasers 252(0)12
Fleet Submarine: 20(0)0
Coastal Submarine: 60(0)12
Floatplane carrier/tenders 4(0)0
destroyer depot ships 2(0)0
Submarine depot ships 1(0)2
Repair ships 2(0)0
Auxillary's N/A