You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, October 1st 2013, 2:22pm

Iberia, Q2/1942

Iberian Naval Developments Q2 1942

A. Industrial Allocation

24/24 factories producing materiel for shipbuilding = 24,000 tons + 5,219 t surplus = 29,219 t
Material Used: 23,273 t
Stockpiled Material: 5,946 t
0/24 factories (fixed) producing infrastructure materiel = 0.0 IP
0/24 factories producing infrastructure materiel = 0.0 IP


B. Infrastructure Development

None


C. Naval Construction

At Cadiz
No.1 type 5 slip: BB Saturno, receives 2,541 tons, due to complete 11/45
No.2 type 4 slip: BB Jupiter, receives 2,541 tons, due to complete 8/45
No.3 type 3 slip: AR Transformar laid down to civilian standards, receives 300 t, to complete 8/43
No.4 type 2 slip: CL Nivelle receives 802 tons, due to complete 10/42
No.5 type 2 slip: CL Ordal receives 802 tons, due to complete 10/42
No.6 type 2 slip: AOR Asistencia laid down to civilian standards, receives 300 t, to complete 6/43
No.1 type 4 drydock: Idle
No.2 type 3 drydock: CA Zorro receives 1,327 t, completes 25% refit

At Barreiro
No.1 type 4 slip:
No.2 type 3 slip: CL Orthez receives 802 tons, due to complete 1/43
No.3 type 3 slip: CL Roliça receives 802 tons, due to complete 1/43
No.4 type 1 slip: Netlayer N-1 laid down , receives 500 t, to complete 1/43
No.5 type 1 slip: Idle
No.6 type 1 slip: Idle
No.1 type 5 drydock: BB Portugal continues scrapping, materials to return Q1/43
No.2 type 3 drydock: CA Inigo Montoya receives 1,327 t, completes 25% refit
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle
Dockside: CV Barcelona undergoes 5% refit, receives 1,681 t, completed 3/42

At Porto
No.1 type 4 slip: Idle
No.2 type 3 slip: CL Dos de Mayo receives 234 t, completed 4/42
No.3 type 3 slip: CL Espinosa receives 234 t, completed 4/42
No.4 type 0 slip:
No.5 type 0 slip:
No.6 type 0 slip:
No.7 type 0 slip:
Dock side: BB Mars receives 2,402 t, completed 6/42

At La Coruna
No.1 type 2 slip: AOR Confianza receives 300 t, launched, to complete 3/43
No.2 type 1 slip: ATH H-1 laid down, receives 400 t, launched, to complete 8/42
No.3 type 0 slip: Idle
No.4 type 0 slip: Idle
No.5 type 0 slip: LCT L-3 laid down, receives 150 t, launched, to complete 8/42
No.6 type 0 slip: LCT L-4 laid down, receives 150 t, launched, to complete 8/42
No.1 type 2 drydock:
No.2 type 1 drydock: Idle
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle
Dockside: CL San Hainando receives 5% refit, receives 267 t

At Santander
No.1 type 4 slip: CA El Jefe laid down, receives 1,932 t, to complete 5/44
No.2 type 2 slip: AD Patina laid down to civilian standards, receives 350 t, to complete 9/43
No.3 type 1 slip: ATH H-2 laid down, receives 400 t, launched, to complete 8/42
No.4 type 1 slip: LST L-1 laid down, receives 250 t, to complete 1/43
No.5 type 1 slip: LST L-2 laid down, receives 250 t, to complete 1/43
No.6 type 1 slip: Idle
No.1 type 2 drydock: Idle

At Santiago De Cuba, Cuba
No.1 type 2 slip: CL Fuentes de Oñoro receives 802 t, to complete 7/42
No.2 type 1 slip: AD Casado laid down to civilian standards, reveives 225 t, to complete 5/43
No.3 type 1 slip: Idle
No.1 type 4 drydock: BB Equador continues scrapping, materials to be received Q1/43
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle

At San Lorenzo, Honduras
No.1 type 4 drydock: Idle
No.2 type 1 drydock: Idle

At Panama, Panama
No.1 type 2 slip: CL Grijó receives 802 t, to complete 7/42
No.2 type 1 slip: Idle
No.3 type 1 slip: Idle
No.4 type 1 slip: Idle
No.5 type 1 slip: Idle
No.1 type 4 drydock: CL Angola completes scrapping, material to return Q4/42
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle

At Luanda, Angola
No.1 type 1 slip: Idle
No.2 type 1 slip: Idle
No.3 type 1 slip: Idle
No.4 type 1 slip: Idle
No.1 type 4 drydock: CL El Salvador completes scrapping, material to return Q1/43
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle

At Haikou, San Hainando
No.1 type 4 drydock: Idle
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle

Other Construction

-One half of the D152 class destroyers receive a 5% refit, costing 954 t.
-Four LCM built at 25 t each.


D. Transactions

None


E. Other Notes

None


F. Order of Battle
Note: W (X) +Y = In Service (under repair/refit) + building

Combattants

CV = 08 (0) + 0
BB = 13 (0) + 2
BC = 04 (0) + 0
CE = 05 (0) + 0
CA = 10 (0) + 1
CL = 41 (0) + 6
DD = 97 (0) + 0
SS = 146(0) + 0

Patrol, Escort and Mine Warfare

Sloop (SL) = 112 (0) + 0
Corvette (CO) = 120 (0) + 0
Mine Warfare Ship (MWS) = 32 (0) + 0

Light Forces

MTB: 300 (0) + 0
MGB: 300 (0) + 0

Ampibious Forces

Troopship (LSI): 6 (0) + 0
Tank Landing Ship (LST): 0(0) + 2
Tank Landing Craft (LCT): 0(0) + 2
Landing Craft Medium (LCM): 4(0) + 0
Landing Craft (LCI): 72 (0) + 0
Assault Boat (LCA): 48 (0) + 0

Fleet Train

Depot Ships (AD): 0(0) + 2
Hospital Ship (AH): 2 (0) + 0
Netlayer (AN): 0(0) + 1
Oiler (AO): 7 (0) + 2
Repair Ship (AR): 0(0) + 1
Sealift Vessel (ASL): 2 (0) + 0
Harbour Tug (ATH): 0(0) + 2