You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, September 30th 2013, 2:40pm

Brazil, Q3/1943

[SIZE=3]Brazil, Q3/1943[/SIZE]
- 7000 tons from 7/7 factories producing naval materials
- 5441 tons from stockpile
- 0 tons from scrapping
- 0 tons from transactions
- 12441 tons total for Q3/1943
- 7702 tons used in Q3/1943.
- 4739 tons left for Q4/43.

0/7 factories committed for Quarter to infrastructure development
0/7 factories committed for Year to infrastructure development

Infrastructure Development
N / A

[SIZE=3]Naval Construction[/SIZE]

Arsenal de Marinha do Rio de Janeiro
- Class 3 Slipway: Idle
- Class 1 Slipway: Destroyer Belém laid down July 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Londrina laid down July 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Feira de Santana laid down July 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Fortaleza laid down April 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 3.5 Drydock: Cruiser Amazonas scrapping. 545 tons to be recovered. Ship requires 4.2 months to scrap. 389 tons recovered in Q3/1943.
- Class 3 Drydock: Cruiser Bahia begins reconstruction. 1580 tons required. 750 tons added in Q3/1943 for a total of 750/1580 tons. 830 tons remaining until completion. Ship requires 6.1 months to reconstruct. Reconstruction completed January 4th, 1944.

Dockside:
- CL Esgrimsta begins Level 1 refit (to install dradis) on April 1st, 1943. 496 tons required. 496 tons added Q2/1943 for a total of 496/496 tons. 0 tons remaining until completion. Refit requires 0.95 months to complete. Refit completes April 30, 1943.
- Destroyer Niterói laid down January 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Destroyer Uberlândia laid down January 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Destroyer Teresina laid down January 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.

Arsenal de Marinha do Macapa
- Class 1 Slipway: Patrol Craft Cananéia laid down July 1st, 1943. 108 tons needed to complete. 108 tons added Q3/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on July 31st, 1943.
- Class 1 Slipway: Patrol Craft Paratí laid down July 1st, 1943. 108 tons needed to complete. 108 tons added Q3/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on July 31st, 1943.
- Class 1 Slipway: Destroyer Campinas laid down April 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 1 Slipway: Destroyer Recife laid down April 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 1 Slipway: Idle
- Class 1 Slipway: Idle
- Class 0 Drydock: Idle

Dockside:
N/A

Arsenal de Marinha do Manaus
- Class 0 Slipway: River hospital ship Oswaldo Cruz (NAH-2) laid down July 1st, 1943. 250 tons required. 250 tons added Q3/1943 for a total of 250/250 tons. 0 tons remaining until completion. Ship requires 4.25 months to construct. Launched August 20th, 1943. Completed November 10th, 1943.
- Class 0 Slipway: Idle
- Class 0 Drydock: 70 ton river patrol craft BPR-05 laid down July 1st, 1943. 70 tons added. Launched complete on July 31st, 1943.
- Class 0 Drydock: 70 ton river patrol craft BPR-06 laid down July 1st, 1943. 70 tons added. Launched complete on July 31st, 1943.

Dockside:
N/A

On Trials:
Submarines B-6, B-7, and B-8 complete trials.
Hospital ship Compaixao completes trials.
River tanker Potengi completes trials.
River construction ship Caboclo completes trials.

Transactions
- None

Scrapping
- 1x Amazonas-class cruiser scrapping. (1x389=389t)

760 tons in recycling until Q4/1943.
254 tons in recycling until Q1/1944.
389 tons in recycling until Q2/1944.

[SIZE=3]Order of Battle[/SIZE]
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

The Fleet
Battleships: 1(0)+0
Aircraft Carriers: 4(0)+0
Battlecruisers: 2(0)+0
Light Cruisers: 9(1)+0-1
Destroyers: 23(0)+9
Submarines: 36(0)+0
Patrol Craft: 6(0)+0
Gunboats: 0(0)+0
Minelayers: 0(0)+0
Minesweepers: 20(0)+0

Fleet Train
Oilers: 3(0)+0
Tenders: 1(0)+0
Training Ships: 1(0)+0

Riverine Forces
River Gunboats: 6(0)+0
Barracks Ship: 1(0)+0
River Construction Tender: 1(0)+0
River Hospital Ship: 1(0)+1