[SIZE=3]Brazil, Q3/1943[/SIZE]
- 7000 tons from 7/7 factories producing naval materials
- 5441 tons from stockpile
- 0 tons from scrapping
- 0 tons from transactions
- 12441 tons total for Q3/1943
- 7702 tons used in Q3/1943.
- 4739 tons left for Q4/43.
0/7 factories committed for Quarter to infrastructure development
0/7 factories committed for Year to infrastructure development
Infrastructure Development
N / A
[SIZE=3]Naval Construction[/SIZE]
Arsenal de Marinha do Rio de Janeiro
- Class 3 Slipway: Idle
- Class 1 Slipway: Destroyer Belém laid down July 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Londrina laid down July 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Feira de Santana laid down July 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1943. Completed June 7th, 1944.
- Class 1 Slipway: Destroyer Fortaleza laid down April 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 3.5 Drydock: Cruiser Amazonas scrapping. 545 tons to be recovered. Ship requires 4.2 months to scrap. 389 tons recovered in Q3/1943.
- Class 3 Drydock: Cruiser Bahia begins reconstruction. 1580 tons required. 750 tons added in Q3/1943 for a total of 750/1580 tons. 830 tons remaining until completion. Ship requires 6.1 months to reconstruct. Reconstruction completed January 4th, 1944.
Dockside:
- CL Esgrimsta begins Level 1 refit (to install dradis) on April 1st, 1943. 496 tons required. 496 tons added Q2/1943 for a total of 496/496 tons. 0 tons remaining until completion. Refit requires 0.95 months to complete. Refit completes April 30, 1943.
- Destroyer Niterói laid down January 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Destroyer Uberlândia laid down January 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Destroyer Teresina laid down January 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
Arsenal de Marinha do Macapa
- Class 1 Slipway: Patrol Craft Cananéia laid down July 1st, 1943. 108 tons needed to complete. 108 tons added Q3/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on July 31st, 1943.
- Class 1 Slipway: Patrol Craft Paratí laid down July 1st, 1943. 108 tons needed to complete. 108 tons added Q3/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on July 31st, 1943.
- Class 1 Slipway: Destroyer Campinas laid down April 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 1 Slipway: Destroyer Recife laid down April 1st, 1943. 2,200 tons required. 650 tons added Q3/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 1 Slipway: Idle
- Class 1 Slipway: Idle
- Class 0 Drydock: Idle
Dockside:
N/A
Arsenal de Marinha do Manaus
- Class 0 Slipway: River hospital ship Oswaldo Cruz (NAH-2) laid down July 1st, 1943. 250 tons required. 250 tons added Q3/1943 for a total of 250/250 tons. 0 tons remaining until completion. Ship requires 4.25 months to construct. Launched August 20th, 1943. Completed November 10th, 1943.
- Class 0 Slipway: Idle
- Class 0 Drydock: 70 ton river patrol craft BPR-05 laid down July 1st, 1943. 70 tons added. Launched complete on July 31st, 1943.
- Class 0 Drydock: 70 ton river patrol craft BPR-06 laid down July 1st, 1943. 70 tons added. Launched complete on July 31st, 1943.
Dockside:
N/A
On Trials:
Submarines B-6, B-7, and B-8 complete trials.
Hospital ship Compaixao completes trials.
River tanker Potengi completes trials.
River construction ship Caboclo completes trials.
Transactions
- None
Scrapping
- 1x Amazonas-class cruiser scrapping. (1x389=389t)
760 tons in recycling until Q4/1943.
254 tons in recycling until Q1/1944.
389 tons in recycling until Q2/1944.
[SIZE=3]Order of Battle[/SIZE]
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
The Fleet
Battleships: 1(0)+0
Aircraft Carriers: 4(0)+0
Battlecruisers: 2(0)+0
Light Cruisers: 9(1)+0-1
Destroyers: 23(0)+9
Submarines: 36(0)+0
Patrol Craft: 6(0)+0
Gunboats: 0(0)+0
Minelayers: 0(0)+0
Minesweepers: 20(0)+0
Fleet Train
Oilers: 3(0)+0
Tenders: 1(0)+0
Training Ships: 1(0)+0
Riverine Forces
River Gunboats: 6(0)+0
Barracks Ship: 1(0)+0
River Construction Tender: 1(0)+0
River Hospital Ship: 1(0)+1