Italian Naval Construction Summary: 1943 Q3
Patria e Onore
Factories: Italy
25 Total factories.
20 Factories dedicated to production of 20,000 tons of Naval material.
5 factories (designated) dedicated to the production of IP for a total of 0.5IP.
Factories: East African State
2 Total factories.
2 Factories dedicated to production of 2,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.
Material Transactions:
1232t rolled over from Q4/42
2000t from the East African State to Italy
1821t recovered from scraping.
25053 tons available for use
Naval Construction and Refit Report
Italy
OTO La Spezia
- Type 3 Slipway
- Type 3 Slipway
- Type 3 Drydock: Aircraft Carrier
Aquila drydocked for reconstruction: receives 2001t. 6003t of 12011t assembled. 6008t required, estimated refloating and estimated completion Q2/44.
- Type 3 Drydock: Cruiser
Francesco Ferrucio drydocked for reconstruction: receives 1071t. 2442t of 3213t assembled. 1071t required, estimated refloating and estimated completion Q4/43.
- Type 1 Slipway
- Type 1.5 Drydock:
Dockside:
Orlando Taranto
- Type 4 Slipway: Battleship
Dante Alighieri receives 3000t on Orlando Taranto's Class 4 slipway. 12000t of 45,275t assembled. 33275t required, estimated launch Q4/44 and estimated completion Q3/46.
- Type 4 Drydock
- Type 3 Slipway
- Type 3 Drydock
- Type 3 Drydock
- Type 1 Slipway
- Type 1 Drydock: Expanding
Dockside:
- Aircraft Carrier
Marcantonio Colona receives 3000t. 32000t of 37911t assembled. 5911t required, estimated completion Q1/44.
- Cruiser
Coatit refit to 152mm automatic test ship: receives 965t. 965t of 1930t assembled. 965t required, estimated refloating and estimated completion Q1/44.
Napoli di Castellammare
- Type 3 Slipway: Cruiser
Sardinia receives 1625t. 4875t of 9750t assembled. 4875t required, launched Q3/43 and estimated completion Q2/44.
- Type 3 Drydock:
- Type 1 Slipway
- Type 1.5 Drydock
Dockside:
Marghera Fincantieri, Venezia
- Type 3 Slipway: Cruiser
Sicily receives 1625t. 4875t of 9750t assembled. 4875t required, launched Q3/43 and estimated completion Q2/44.
- Type 3 Slipway
- Type 3 Drydock: Cruiser
Giovanni Bausan drydocked for conversion to a aircraft carrier: receives 1475t. 4425t of 7378t assembled. 2953t required, estimated refloating and estimated completion Q1/44.
- Type 1 Slipway
- Type 1 Drydock
Dockside:
CRDA Trieste
-Type 4 slipway: Battleship
Leonardo da Vinci receives 3000t while on one of CRDA Trieste's Class 4 slipways. 18000t of 45,275t assembled. 27275t required, estimated launch Q4/43 and estimated completion Q4/45.
-Type 4 slipway:
Dockside:
Armored Cruiser
Regina Elena receives 3000t. 21000t of 30000t assembled. 9000t required, estimated completion Q2/44.
Messina di Castellammare
- Type 4 Drydock
- Type 3 Slipway:
- Type 3 Slipway: Cruiser
San Calepodio drydocked for reconstruction: receives 1151t . 3453t of 3453t assembled. 0t required, completed. Trials begin Q4/43.
- Type 3 Drydock
- Type 1 Slipway
Dockside:
Fincantieri Cagliari
- Type 3 Drydock: Cruiser
San Calimero drydocked for reconstruction: receives 1151t . 3453t of 3453t assembled. 0t required, completed. Trials begin Q4/43.
- Type 1 Drydock
Dockside:
-Destroyer
Rosolino Pilo refit commenced: receives 345t . 345t of 345t assembled. 0t required, completed. Trials begin Q4/43.
-Destroyer
Giuseppe Cesare Abba refit commenced: receives 345t . 345t of 345t assembled. 0t required, completed. Trials begin Q4/43.
-Destroyer
Pilade Bronzetti refit commenced: receives 345t . 345t of 345t assembled. 0t required, completed. Trials begin Q4/43.
-Destroyer
Giuseppe Missori refit commenced: receives 345t . 345t of 345t assembled. 0t required, completed. Trials begin Q4/43.
East African State
Massawa
- Type 3 Drydock
- Type 1 Slipway
- Type 1 Drydock
Dockside:
Mogadishu
-Type 1 Drydock
Scraping Report
No ships scraped
Ships on Trials
Destroyers
l'Unità,
Solidarietà,
Armonia,
Concordia,
Integrità,
Incorrotti,
Purità
Aircraft Carrier
Vettor Pisani
Cruisers
Genoa &
Milan
Current Order of Battle: Italian Navy Note: Subject to error correction.
BB. 7(0)+2
CV. 12(1)+1
ACR. 9(0)+1
CL. 19(2)+4
DD. 68(4)+0
Submarines. 99(0)+0
Escorts. 122(0)+0
MAS. 70(0)+0
Current Order of Battle: East African State Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS
Infrastructure Projects
Class 1 Drydock at Orlando Taranto upgraded to Class 1.5 (.5 IP)
Summary of Expenditures
24444t out of 37375t used in Naval construction.
0t out of 37139 t used in payments.
.5 IP used in Infrastructure Projects
24444t expended Q3/43.
609t rollover to Q4/43.